AI receptionist for concrete contractors
An AI receptionist for concrete contractors who are busy pouring.
Brody is an AI receptionist for concrete contractors. Brody answers driveway, patio, slab and repair calls on your number while your hands are full, books site visits and sends you the details.
Brody tells every caller he is an AI assistant for your concrete company.

$99 per operating user per month. No setup fee. Every concrete call answered day and night, booked into your schedule and summed up by text.
Sheet 01, the calls
What calls does a concrete company get? Brody knows every one of them.
Most calls to a concrete company fall into the six kinds below, from driveways and patios to pour day calls. Brody asks the questions a good concrete office would ask on each one, then books, transfers or takes a message by your rules.
Driveways and patios
Brody asks the rough size, tear out or new, and finish, then books a site visit to measure.
Slabs and foundations
Garage slabs, shop floors and footings for builders. Brody notes the use, the size and the timeline.
Cracks and repairs
Sunken steps, cracked walks and lifting slabs. Brody asks for photos by text so you can decide before you drive out.
Decorative work
Stamped, colored and exposed aggregate. Brody notes what the caller has in mind and books a consult.
GCs and builders
Bid invites, schedule changes and inspection results get logged with the job and sent to the right person.
Pour day calls
Supplier, pump and finisher calls on pour day reach you right away, following the rules you set.
Intake
What does Brody ask a concrete caller? The questions your best office person asks.
Brody asks every concrete caller the same short set of questions, in the order you choose, and writes the answers into the booking and the summary.
| Is it a driveway, patio, walk, slab or a repair? | Sorts flatwork leads from repair calls and builder work. |
| About how many square feet? | A rough size so the site visit starts in the right range. |
| Is there old concrete to tear out? | Demo changes the crew, the haul off and the timeline. |
| Can a ready mix truck reach the area, or will it need a pump? | Access decides the equipment before you quote. |
| Which finish do you want, broom, stamped, colored or exposed aggregate? | Decorative work is booked as a consult. |
| When do you need it done? | Matches the caller to your lead time and weather windows. |

A real day for Granite Flatwork
You are on a pour from 6 AM until the truck leaves. Three homeowners call about driveways. All three get answered and booked.
Concrete work does not stop for the phone, and a voicemail during a pour is a lost job. Brody answers in your company name, asks the questions you would ask, requests photos by text and books measuring visits on your schedule. Calls you mark as urgent, like the pump company or the supplier, come through to you.
After hours
Which concrete calls are emergencies? Only the ones you choose.
You write the emergency rules in plain language and approve the safety script. Brody sorts every after hours concrete call into one of three lanes and acts on it the same way every time.
| Right now, page the on call person | Calls you mark as urgent, such as your supplier, pump company or a builder on pour day. Brody transfers them to you or texts you right away. |
| First open slot tomorrow | A sunken step or a crack that is a trip hazard. Brody books an assessment and asks for photos. |
| Morning summary | New driveways, patios and decorative work. Brody books the site visit and sends a summary. |

Three lanes, your rules. Brody asks the same questions on every call and follows the safety script you approve.
Trust and securityAfter the call
Booked is only the start. Every concrete customer hears from you first.
Brody keeps the homeowner informed by text, call and email from your company number until the job is paid and reviewed, so they never have to call and ask what is next.
The day before
Arrival window, parking and what to move, sent the afternoon before with a reply to confirm.
On the way
A text when your crew leaves for the job, and a call if weather or an inspection moves the day.
Progress and photos
A short update with photos from the crew, sent after you approve it. Change orders are approved by text.
Wrap up
Final walkthrough, invoice reminders, warranty requests and a review request once the work is done.
Busy seasons
When do concrete calls spike? Brody answers the rush.
Concrete calls spike in the spring rush, run all summer while crews are on early pours and pick up again in the fall before the freeze. Brody answers many calls at the same time, so no caller hears a busy signal.
Spring rush
Everyone wants a driveway or patio as soon as it warms up. Brody books site visits in the order you want and tells callers your current lead time.
Summer heat
Early starts and long pours mean the phone goes unanswered all morning. Brody takes every call so you can stay on the finish.
Fall before the freeze
Callers want the work done before cold weather. Brody books estimates and tells callers what you said about cold weather pours.
Weather reschedules
When rain moves a pour, Brody can take the calls from customers asking about the new date and route them to you.
Booking
What does Brody book for concrete contractors? The jobs you want, on your schedule.
Brody books into Jobber and Housecall Pro, or sends the booking to you by text and email if you do not use one.
- Site visits to measure driveways, patios and slabs
- Repair assessments with photos by text
- Decorative concrete consults
- Walkthroughs with builders and GCs
- Callbacks from you for larger commercial work
Questions callers ask
Brody answers from the services, prices, areas and policies you give him. If a caller asks something you have not covered, he takes a message instead of guessing.
- How much per square foot?01
- When can you pour?02
- Do you remove the old concrete?03
- Do you do stamped concrete?04
- How long before I can drive on it?05
- Do you need a permit?06
- Do you seal it?07
- What happens if it rains?08
Concrete words Brody knows
- pour day
- flatwork
- slab
- footings
- ready mix
- pump truck
- tear out
- broom finish
- stamped
- exposed aggregate
- control joints
- cure time
Trust
Will callers know Brody is an AI? Yes, and they can always reach a person.
Brody says he is an AI assistant for your company at the start of every call. Any caller who asks for a person is transferred to the number you choose, or leaves a message that reaches you by text right away.
Recording notices and consent follow the rules for each calling location. Business texting uses the required registration and supports opt out on every thread.
What Brody will not do on a concrete call
- Give a square foot price you have not approved
- Commit to a pour date. Pour dates stay your call
- Promise how a slab will hold up or how long it will last
- Sign a contract or accept a deposit
Key facts
How much is an AI receptionist for concrete companies? Platform at a glance.
One full Platform plan at $99 per operating user per month, or $89 per user per month billed annually. Start with one paid user. Standard setup is free.
| What it is | An AI receptionist named Brody that answers your concrete company number, books jobs and texts back missed callers. |
| Who it is for | Concrete contractors who miss calls while they are on a job or after hours. |
| Price | One full Platform plan at $99 per operating user per month, or $89 per user per month billed annually. Start with one paid user. Standard setup is free. |
| Included each month | Each paid user adds 50 AI calling minutes, 250 messaging units, 250 human US calling minutes and 500 standard AI work items each month. These separate pools are shared across the company, not reserved for individual users. |
| Above the included amount | Authorized additional usage costs $0.40 per AI minute, $0.04 per messaging unit, $0.04 per human US calling minute and $0.10 per standard AI work item. |
| Hours | Day and night, weekends and holidays. |
| Languages | English and Spanish. |
| Booking | Connects with Jobber and Housecall Pro. ServiceTitan is on our integrations list. |
| How to start | Try the Platform. Our team confirms your number, calling country, routing and booking setup, then tests the line with you before activation. |
How to start
Get Brody answering for your concrete company.
Try the Platform
No setup fee. Standard onboarding includes your company number, normal messaging registration, a standard roster import, released connector setup and two 45-minute assisted sessions for your first two supported workflows.
Try the Platform02Confirm your rules
Tell our team your services, service area, hours and emergency rules. We test the line with you before activation.
How Platform works03Grow into the Platform
Add crews, subs, daily reports and a full office phone system later, with your number and history kept.
Compare plansWhat does Brody ask a caller who wants a driveway or patio quote?
He asks the rough square footage, whether old concrete needs to come out, whether a truck can reach the area, the finish they want and when they need it. Then he books a site visit to measure and texts the caller to ask for photos.
Can Brody take calls from ready mix suppliers and pump operators?
Yes. You list the supplier, pump and finisher numbers you want put through, and on pour day Brody transfers those calls to you or texts you right away. Everyone else is answered and booked without interrupting the pour.
Can Brody reschedule estimates when weather moves a pour?
Brody can move estimate visits to open slots on your schedule and text the customer the new time. Pour dates stay your call, so when rain moves a pour he answers customer questions and sends them to you.
Can callers text photos of the existing slab?
Yes. After the call Brody texts the caller and asks for photos of the slab, the cracks or the area. The photos are attached to the booking so you can decide whether a visit is worth the drive.
Does Brody give square foot pricing?
Only if you give him one to share, such as a starting range for a standard broom finish driveway. Otherwise he books a site visit, so callers never hear a number you did not approve.
Can Brody talk with Spanish speaking customers and crews?
Yes. Brody answers calls in English and Spanish, and your crew can text the company number in either language for an address or the day’s schedule. You get every summary in English.
Will Brody interrupt me during a pour?
Only for the callers you choose. Most concrete contractors let the supplier, the pump company and builders on pour day through, and have Brody handle everything else.
What does it cost for a concrete contractor?
One full Platform plan at $99 per operating user per month, or $89 per user per month billed annually. Start with one paid user. Standard setup is free.
Never miss a job call again.
Put Brody on your concrete line.
One full Platform plan at $99 per operating user per month, or $89 per user per month billed annually. Start with one paid user. Standard setup is free.
One full Platform plan. No standard setup fee. Start with one supported workflow.
Plan your rollout
Pricing, security reviews, procurement and rollout across your projects and regions.
