Skip to content
Field notes / Payroll and compliance

Best certified payroll software for contractors (2026), compared

Nine certified payroll software options compared on who they are for, published prices, state e-filing and the Davis-Bacon checks each documents (checked November 2026).

By Buildalytic editorial team5 min read

Editorial scene of a contractor reviewing certified payroll reports
Illustrative editorial scene, not a vendor test.
The short answer

The best certified payroll software depends on your role. Subcontractors filing their own reports can start with CertifiedPayrollPro ($49 a month), WeeklyCertified (free to start) or LCPcertified ($12 a report). Contractors who also run payroll look at eBacon, Miter or Payroll4Construction. General contractors collecting every sub's payroll compare LCPtracker Pro, eMars and Buildalytic, which also chases missing weeks by call and text.

What to take away

  • Decide first whether you file your own payroll, collect subcontractors' payrolls, or need payroll run for you.
  • Only some tools publish prices; most quote after a demo.
  • Check which state e-filing formats each tool documents before you buy, not after.
  • Ask each vendor to show fringe, apprentice, overtime and split-classification checks on your own payroll.

Start with your role

Certified payroll software comes in three shapes. Reporting tools turn payroll you already ran into a WH-347 and state reports. Payroll systems run prevailing wage payroll and produce the reports from it. Collection and review platforms let a general contractor or agency gather and check every subcontractor's payroll on a project.

Prices and features below were copied from each vendor's own website on November 11, 2026. The order groups tools by role and is not a ranking. Buildalytic makes one of the options and is listed with its own limits.

Nine options at a glance

“Not stated” means the vendor's pages we read don't say; ask them.

Nine options at a glance
SoftwareBuilt forPublished priceRuns payroll?State e-filing it documentsOne limit to check
WeeklyCertifiedSmall subcontractorsFree for 3 WH-347s a month; $29 a month (Solo)No, prepares forms from your dataNot stated; “state format add-ons as released”Few state formats today
CertifiedPayrollProContractors filing their own reports$49, $99 or $249 a month, no per-report feeNo, “no payroll system needed”California A-1-131 and DIR eCPR XML, Illinois, New York, New JerseyIts pages disagree on which plan includes state filings
LCPcertified (LCPtracker)Self-performing contractors$12 a report, or $145 a month for up to 5 projectsNoCalifornia, Washington and Maryland XMLWage determinations maintained for California only
eBaconOpen-shop and merit-shop contractors, 15 to 500 employeesDemoYesState forms and uploads; states not named on pages readPrice not published
MiterContractors certifying their own employeesDemoYesPortal submission in 11 states including California, New York, New Jersey, Oregon and Washington“Not a portal for collecting reports from subcontractors”
Payroll4ConstructionContractors who want a payroll serviceQuote after a formYes, a payroll serviceCalifornia DIR and Maryland electronic; others in print formatsPrice not published
eMarsAgencies, GCs managing subs, and subsSet per project after a demoNoCalifornia DIR, Washington L&I, New York XML; Oregon WH-38Price not published
LCPtracker ProPublic agencies and prime contractorsDemoNoNot stated on the Pro pagePrice not published
BuildalyticGeneral contractors collecting and reviewing subs' payrollsQuoted per projectNo, reviews payrolls your subs submitPrepares the reporting handoff; confirm your agency's format during setupPrice not published; payroll is quoted separately from Brody's plan

Sources: WeeklyCertified: pricing (checked November 11, 2026); CertifiedPayrollPro: pricing (checked November 11, 2026); LCPtracker: LCPcertified (checked November 11, 2026); eBacon: prevailing wage payroll (checked November 11, 2026); Miter: certified payroll (checked November 11, 2026); Payroll4Construction: certified payroll (checked November 11, 2026); eMars: certified payroll software (checked November 11, 2026); LCPtracker: LCPtracker Pro (checked November 11, 2026); Buildalytic: collect subcontractor payrolls

Which Davis-Bacon checks each tool documents

These are the checks that catch the expensive mistakes in our worked payroll example. A blank in a vendor's documentation doesn't mean the feature is missing; ask for a demonstration on your own payroll.

Which Davis-Bacon checks each tool documents
SoftwareFringe annualizationApprentice ratios or ratesSplit classificationsWage determinations kept current
eBaconYes, “annualizes fringe automatically”Not statedYes, recalculates when a worker switches mid-shiftYes, “tracks wage determinations for you”
MiterFringe and benefit offsets calculatedYes, Apprentice Ratio ReportYesYou update them once in Miter
eMarsNot statedYes, ratio and error reportsNot statedYes, maintained by eMars
Points NorthFringe formulas (WageIQ)Yes, ratios and wage progressions (WageIQ)Not statedNot stated
LCPcertifiedNot statedApprentice fields on the WH-347Not statedCalifornia maintained; other states uploaded
CertifiedPayrollProNot statedNot documented as a checkNot settable per day todayYou import from SAM.gov
WeeklyCertifiedPer-hour fringe creditsNot statedNot statedYou use the contract's determination
BuildalyticFringe treatment reviewed against the determinationApprentice notices, dispatch and hours trackedClassifications checked against the work performedGoverning determination stored with the job

Sources: eBacon: prevailing wage payroll (checked November 11, 2026); Miter: certified payroll (checked November 11, 2026); eMars: client FAQs (checked November 11, 2026); Points North: WageIQ (checked November 11, 2026); LCPtracker: LCPcertified (checked November 11, 2026); CertifiedPayrollPro: pricing (checked November 11, 2026); WeeklyCertified: pricing (checked November 11, 2026); Buildalytic: prevailing wage compliance software

For general contractors: collecting every sub's payroll

A general contractor on a Davis-Bacon job needs every subcontractor's weekly payroll, on time and correct. Most tools above help the sub produce the report. Fewer help the GC get it.

LCPtracker Pro and eMars give agencies and primes a portal that subcontractors submit to. Buildalytic adds the follow-up: Brody tracks which employer and week is missing, calls or texts the subcontractor's payroll contact, and keeps the original, the correction and the reviewer's decision together.

Sources: LCPtracker: LCPtracker Pro (checked November 11, 2026); eMars: certified payroll software (checked November 11, 2026); Buildalytic: collect subcontractor payrolls; Buildalytic: certified payroll audit

How to choose

Run one real week through each finalist: a worker with overtime, one with two classifications in a day, an apprentice and a fringe-plan contribution. Check the report against the wage determination line by line, as in our worked example, and confirm the state file your agency accepts.

Common questions

What is the best certified payroll software for a small subcontractor?

If you only need reports from payroll you already run, compare WeeklyCertified (free for 3 WH-347s a month), CertifiedPayrollPro ($49 a month) and LCPcertified ($12 a report). If you also want payroll run for you, look at eBacon, Miter or Payroll4Construction.

What certified payroll software do general contractors use to collect subcontractor payrolls?

LCPtracker Pro and eMars offer portals for primes and agencies. Buildalytic collects and reviews subs' payrolls and has Brody follow up on missing or corrected weeks by call and text. Miter says it is not a portal for collecting subcontractor reports.

Which certified payroll software files California DIR eCPR?

Vendors that document California DIR XML include CertifiedPayrollPro, LCPcertified, eMars, Payroll4Construction and Miter (portal submission), according to their own sites on November 11, 2026.

How much does certified payroll software cost?

Published prices start at free (WeeklyCertified, 3 forms a month), $12 a report (LCPcertified) and $49 a month (CertifiedPayrollPro). Most payroll systems and GC platforms quote after a demo.

Sources and editorial notes

Prepared with AI assistance. Reference date: 2026-11-11. Worked examples are illustrative and are not customer results. Product details can change; confirm the current scope and terms before rollout.

How we prepare and update field notes
See it on your workflow

Collect every sub's payroll without the chase.

Bring one project's subcontractor list and a sample week. See Brody follow up on missing payrolls and how each finding is reviewed and corrected.

Start with the call, text or record your team already handles. Review the expected outcome and the human handoff before choosing a rollout.

Talk to the payroll team Explore the relevant capability