Certified payroll example: checking a Davis-Bacon WH-347 week line by line (2026)

How to do certified payroll right: a Davis-Bacon WH-347 week checked against a real wage determination, a fringe benefit calculator and six real-life scenarios.

By Buildalytic editorial team9 min read

Overhead editorial photograph of a construction accountant using a calculator alongside a plain benefits folder, time records and a pencil
Illustrative editorial scene. The payroll in this guide is fictional; the wage rates come from a published wage determination.
The short answer

To check a certified payroll, match each worker's classification to the wage determination in the contract, then confirm base rate, fringe benefits, overtime and any Executive Order minimum. Using the real rates in CO20260001 modification 2 (Colorado, building, published 11/05/2026), one fictional WH-347 week of four workers produced four findings worth $465.42; six common real-life scenarios follow. Buildalytic's prevailing wage compliance software runs these checks before your team certifies.

What to take away

  • Certified payroll is a weekly payroll for each Davis-Bacon project, signed with a Statement of Compliance; WH-347 is the optional federal form.
  • Pay at least base rate plus fringe for the classification of work actually performed, in cash, benefits or a mix.
  • Credit benefit-plan contributions per hour across all hours worked in the year, not only Davis-Bacon hours.
  • Overtime is time-and-a-half on the base rate; the fringe is not multiplied.
  • Apprentice rates apply only to apprentices registered in a registered apprenticeship program.

How to do certified payroll: the six checks for every week

Every week a covered contractor or subcontractor submits a certified payroll for the project, signed with a Statement of Compliance. Form WH-347 is the optional federal layout; any format with the same information is accepted. Before signing, check each worker in this order.

1) Wage determination: the one and modification incorporated in the contract. 2) Classification: the work actually performed that day, from time records or the daily log. 3) Base rate: at least the rate listed for that classification. 4) Fringe benefits: the listed fringe paid as benefit-plan contributions, cash or a mix. 5) Overtime: time-and-a-half on the base rate for hours over 40 on covered contracts. 6) Floors and special rules: any Executive Order minimum, and registration for anyone paid as an apprentice.

Sources: eCFR: 29 CFR 5.5, contract provisions and related matters; U.S. Department of Labor: Government contracts

The Davis-Bacon wage determination used

This example uses the real federal general wage determination CO20260001, modification 2, published November 5, 2026 on SAM.gov, for building construction in a group of Colorado counties including Summit County. The project, subcontractor, workers and payroll are fictional. On a real job, use the determination and modification incorporated in your contract.

These are the rates from that document for the four classifications on our example payroll, for Summit County.

The Davis-Bacon wage determination used
Classification (rate identifier)Base rateFringeTotal package
Electrician (ELEC0068-007)$49.35$19.93$69.28
Plumber, including HVAC work (PLUM0003-006)$47.23$21.68$68.91
Pipefitter, excluding HVAC work (PLUM0208-005)$43.40$22.11$65.51
Carpenter: formbuilding, drywall hanging/framing, metal stud (CARP9901-006)$33.11$12.17$45.28
Laborer, common (SUCO2001-008)$9.75$0.00$9.75

Sources: SAM.gov: General Decision Number CO20260001, modification 2 (published 11/05/2026)

Prevailing wage fringe benefits calculator, worked in plain numbers

These four formulas cover most fringe and overtime questions. The example uses the electrician rate from CO20260001: $49.35 base and $19.93 fringe.

Benefit-plan contributions are credited per hour by dividing the annual contribution by all hours the worker works in the plan year, on every job, not only Davis-Bacon hours. This is often called annualization.

Prevailing wage fringe benefits calculator, worked in plain numbers
What you needFormulaElectrician example
Total hourly packageBase + fringe$49.35 + $19.93 = $69.28
Benefit credit per hourAnnual plan contribution ÷ all hours worked in the year$9,360 ÷ 2,080 hours = $4.50
Cash owed per hourBase + (fringe − benefit credit), if fringe is larger$49.35 + ($19.93 − $4.50) = $64.78
Overtime hour1.5 × base + fringe1.5 × $49.35 + $19.93 = $93.96

Sources: SAM.gov: General Decision Number CO20260001, modification 2 (published 11/05/2026); eCFR: 29 CFR 5.25, rate of contribution or cost for fringe benefits

The week as the subcontractor submitted it

A fictional mechanical and electrical subcontractor submits one weekly payroll for four workers on a federally funded building in Summit County. Everything below is invented to show the checks; none of it is a real person or company.

The week as the subcontractor submitted it
WorkerClassification reportedHoursBase paidFringe paidWhat the daily log says
Worker AElectrician40$49.35$15.00 to a benefit planBranch wiring and fire-alarm devices
Worker BPipefitter40$43.40$22.11 to a benefit planDomestic water lines and fixtures
Worker CCarpenter44 (four on Saturday)$33.11 for all 44 hours$12.17 for all 44 hoursMetal stud framing
Worker DLaborer, common40$12.00$0.00Site cleanup and material handling

Four findings, checked line by line

Each finding is a question for the reviewer, not a final determination. The dollar amounts assume the coverage question in each row is answered “yes”.

Four findings, checked line by line
WorkerCheckWhat the numbers showPotential underpayment
Worker AFringeRequired fringe $19.93; paid $15.00 with no cash in lieu. $4.93 short per hour × 40$197.20
Worker BClassificationThe log describes plumbing, not pipefitting. Plumber package $68.91 vs paid $65.51: $3.40 per hour × 40$136.00
Worker COvertimeHours over 40 need time-and-a-half on the base rate where the overtime rules apply: 4 × ($33.11 × 0.5)$66.22
Worker DExecutive Order minimumPaid above the $9.75 listed rate, but if Executive Order 13658 covers the contract the floor is $13.65: $1.65 × 40$66.00
Total$465.42

Sources: SAM.gov: General Decision Number CO20260001, modification 2 (published 11/05/2026); eCFR: 29 CFR 5.5, contract provisions and related matters

How each finding was found

Fringe: the payroll's fringe column was compared with the determination's fringe for the reported classification. Benefits paid to a plan and cash paid instead of benefits both count, so the check is on the total; here neither made up the $4.93 gap.

Classification: the reported classification was compared with the work in the daily log. Plumbing and pipefitting carry different rates on this determination, so a job title alone isn't enough. Worker B was paid more fringe than a plumber requires, but the total package was still $3.40 an hour short.

Overtime: hours above 40 in the week were flagged. Under the Contract Work Hours and Safety Standards Act, covered contracts require time-and-a-half on the basic rate for those hours; the fringe isn't multiplied.

Executive Order minimum: the determination itself notes that if Executive Order 13658 applies to the contract, workers must receive at least $13.65 an hour from May 11 through December 31, 2026. Whether it applies depends on when the contract was awarded or extended, so the reviewer confirms the contract dates.

Sources: SAM.gov: General Decision Number CO20260001, modification 2 (published 11/05/2026); eCFR: 29 CFR 5.5, contract provisions and related matters; U.S. Department of Labor: Government contracts

Six real-life scenarios reviewers see

Each scenario below is fictional but typical of what payroll reviewers run into on public jobs. Rates come from CO20260001 modification 2. The amounts assume the rule in each row applies to the contract; the reviewer confirms that before asking for a correction.

Six real-life scenarios reviewers see
ScenarioWhat the payroll showsRule that appliesThe numbersWhat to do
Drywall hanger also cleans up8 hours: 6 framing, 2 cleanup, paid the laborer rate for the 2 hoursSplit rates are allowed only if time records show the hours in each classificationWith records: 6 × $45.28 + 2 × $9.75 = $291.18. Without records the whole day is at the carpenter rate: 8 × $45.28 = $362.24. Gap $71.06Keep daily time records by classification, or pay the higher rate
“Apprentice” who isn't registered32 hours as an electrician apprentice at 60%: $29.61Apprentice rates apply only to apprentices in a registered program; otherwise the journeyworker rate applies($49.35 − $29.61) × 32 = $631.68 in base pay, plus any fringe differenceAsk for the registration; if there isn't one, correct to the journeyworker rate
Health plan credited only on federal hours$9,360 a year, divided by 1,000 Davis-Bacon hours = $9.36 an hourCredit is annualized over all hours worked: 2,080Correct credit $4.50; overstated by $4.86 an hour, or $194.40 for a 40-hour weekRecompute the credit and pay the difference in cash
Plumber paid all cash, overtime on the full package2 overtime hours at 1.5 × $68.91 = $103.37 an hourOvertime is 1.5 × base + fringe = $92.53Overpaid $10.84 an hour, $21.68 for 2 hours. Compliant, but it costs moneyFix the payroll setup so overtime multiplies only the base rate
Pipefitter title, plumbing work40 hours as pipefitter: $43.40 + $22.11The classification follows the work performedPlumber package $68.91 vs $65.51 paid: $3.40 × 40 = $136.00Reclassify the hours and pay the difference
Lower-tier sub sends nothing for a weekNo payroll received for week ending FridayEach covered employer submits weekly; a missing week is different from a week with no workNo amount until the payroll or a no-work statement arrivesAsk the agency what it needs for no-work weeks, and record which it is

Sources: SAM.gov: General Decision Number CO20260001, modification 2 (published 11/05/2026); eCFR: 29 CFR 5.5, contract provisions and related matters; eCFR: 29 CFR 5.25, rate of contribution or cost for fringe benefits

Where each finding shows up on form WH-347

If your payroll uses the WH-347 layout, these are the columns to check for each finding. The current DOL instructions keep the hourly rate, fringe credit and cash in lieu of fringe in separate columns.

Where each finding shows up on form WH-347
FindingWH-347 column
ClassificationWork classification for each worker
Base rate6A: hourly wage rate
Fringe paid to plans6B: fringe benefit credit
Fringe paid in cash6C: cash paid in lieu of fringe
OvertimeDaily and weekly overtime hours, paid at time-and-a-half of 6A
Project vs all-work pay7A: gross earnings on this project; 7B: gross earnings for all work

Sources: U.S. Department of Labor: Form WH-347 and instructions

What the reviewer does next

Send each finding to the subcontractor with the line, the rate identifier and the question. Collect a corrected payroll or a written explanation, keep the original beside the revision, and record the reviewer's decision before the weekly packet is certified.

Buildalytic's prevailing wage compliance software keeps the governing determination with the job, flags these checks before the reviewer signs and tracks each correction to the week it belongs to. Your authorized team still certifies the payroll; this guide is not legal advice.

Sources: Buildalytic: Prevailing wage compliance software

Common questions

How do you do certified payroll?

Each week, prepare a payroll for every worker on the covered project showing classification, hours, base rate, fringe benefits, deductions and net pay, then sign the Statement of Compliance. Check classification, base rate, fringe, overtime and any Executive Order minimum before signing, as in the six checks above.

Is this a real payroll?

No. The wage rates come from the published wage determination CO20260001, modification 2 (November 5, 2026). The project, subcontractors, workers and payroll are fictional, built to show the checks.

How do you calculate prevailing wage fringe benefits?

Take the fringe listed for the classification, subtract the hourly credit for bona fide benefits (annual plan contributions divided by all hours worked in the year), and pay any remainder in cash. Overtime multiplies only the base rate.

Can extra fringe make up for a low base rate?

A contractor may meet the total of base rate plus fringe through any combination of cash and bona fide benefits, which is why a worker is checked on the total package. Overtime is still computed on the base rate.

Do apprentices get the journeyworker rate?

Only apprentices registered in a registered apprenticeship program may be paid apprentice rates, within the program's ratio. Anyone else is paid the journeyworker rate for the work performed.

Is form WH-347 required?

No. WH-347 is the optional federal format. A payroll in another layout is acceptable if it contains the same information and the signed Statement of Compliance. State programs such as California DIR and Oregon BOLI have their own requirements.

Which wage determination applies to my project?

The one incorporated in the contract, including its modification number. Confirm it with the contracting agency rather than using the newest published version.

Sources and editorial notes

Prepared with AI assistance. Reference date: 2026-11-11. Worked examples are illustrative and are not customer results. Product details can change; confirm the current scope and terms before rollout.

How we prepare and update field notes
See it on your workflow

Run these checks on your own payroll.

Bring one project's wage determination and a sample week of subcontractor payroll. We'll walk through the checks, the findings and the correction trail with your team.

Start with the call, text or record your team already handles. Review the expected outcome and the human handoff before choosing a rollout.

Discuss your payroll workflow Explore the relevant capability