Pennsylvania certified payroll and prevailing wage reporting.

Pennsylvania prevailing wage reporting for contractors: weekly certified payroll to the public body on form LLC-25, the $25,000 threshold, and record rules.

Illustrative Buildalytic payroll review workspace showing received, missing and ready submissions.
Illustrative product scene · example records

01 / In practice

Who administers prevailing wage in Pennsylvania

The Department of Labor and Industry (L&I) sets prevailing wage rates and enforces the Pennsylvania Prevailing Wage Act. The work sits with the Bureau of Labor Law Compliance. L&I runs an online Prevailing Wage system where rate determinations are requested and searched. The public body requests the determination for its project, not the contractor. The public body must also send L&I the Prevailing Wage Awarding Agency Form (LLC-68) within 5 days of contract award. Contractors work from the rates the public body puts in the bid and contract documents.

02 / In practice

Which projects are covered

The Act covers public work paid for in whole or in part with public body funds. Public work means construction, reconstruction, demolition, alteration, or repair, other than maintenance. The estimated cost of the total project must be over $25,000. L&I says a project may not be split into parts to stay under that amount. Locally funded highway and bridge projects contracted after January 1, 2014 use a $100,000 threshold. Act 101 of 2026 amends the Act and takes effect December 21, 2026. L&I says it will share more on compliance.

03 / In practice

How rates are set for each project

The Secretary of Labor and Industry sets the prevailing minimum rate for each craft or classification after consulting an advisory board. L&I issues building, highway, heavy, and residential rates by craft, classification, and county. Rates can include cash and fringe benefits. The public body puts the determination in its bid specifications. If the contract is not awarded within 120 days of the determination date, a new request is needed. Contractors must post the rates at the site for the length of construction. A late determination does not excuse paying prevailing wages.

04 / In practice

Weekly certified payroll to the public body

Contractors and subcontractors must complete and submit certified payrolls to the public body every week. L&I publishes form LLC-25, the Weekly Payroll Certification for Public Works Projects. It asks for the week ending date, project, each worker's name, classification, apprentice rate, daily hours, base rate, fringe benefits, deductions, and gross pay. First, review each week's payroll internally against the project determination. Then sign and submit the certification to the public body. The public body must check that rates were paid before it pays the contractor.

05 / In practice

Statement of compliance and final statement

Page 2 of form LLC-25 holds a Certified Statement of Compliance. The signer confirms the prevailing wage terms are in the contract and that no one on the job is debarred. The form says notarization is required on the first and last submissions only. All other parts are completed weekly. State regulations also require a weekly statement and a final statement at the end of the work, filed under oath with the contracting agency. Before final payment, the Act requires sworn statements listing any wages still owed to workers.

06 / In practice

Records and penalties

Keep payroll records for at least 2 years. L&I lists each worker's name, craft or classification, daily hours, hourly rate with benefits, and deductions. Keep fringe benefit records, timecards, and signed apprentice indentures with Pennsylvania Apprenticeship and Training Council approvals. Records must be open to L&I and the public body. Knowingly making a false sworn statement is a misdemeanor, with a fine up to $2,500, up to 5 years in prison, or both. Intentional violations can bring a 3 year debarment from public work.

Official sources

Start with the agency’s instructions.

Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.

Sources checked October 29, 2026.

FAQ

Questions people ask

Something else? Ask the team

Who do I send Pennsylvania certified payroll to?

Send it to the public body that awarded the contract. L&I says contractors and subcontractors must complete and submit weekly certified payrolls to the public body. The public body must require this filing and confirm prevailing rates were paid before it pays the contractor. Check the contract for the delivery method.

Does every weekly LLC-25 need a notary?

No. Form LLC-25 says the notarization must be completed on the first and last submissions only. All other information on the form must be completed every week. Use the current version of the form from L&I and confirm any added steps with the public body.

How long is a Pennsylvania rate determination good for?

L&I says a new determination request is required if the contract is not awarded within 120 days of the determination date. The public body makes the request through the L&I Prevailing Wage system. Contractors should confirm the determination in the bid documents matches the awarded contract.

Are apprentices paid prevailing wage in Pennsylvania?

Apprentices are covered workers under the Act. Keep a signed indenture for each apprentice and the Pennsylvania Apprenticeship and Training Council approvals. L&I lists paying an apprentice below the prevailing rate in a program not registered with the Council as an example of an intentional violation.

How long must I keep prevailing wage records?

Keep them for at least 2 years. The Act sets the period at two years from the date of payment. Records must be open to the public body and L&I at reasonable hours. Certified payrolls filed with a public body can also be requested as public records.