Construction workflows for GCs and specialty trades

A practical inventory for general contractors, self-performing contractors, subcontractors and specialty trades. Each workflow lists its steps and the Buildalytic page that runs it. Requirements, approvals and destinations vary by project.

14 workflows

Market, pursuit and preconstruction

From the first lead to the handoff from estimating to operations.

Lead sourcing and relationship history

Identify projects, relationship owners and the next pursuit action. Negotiated and open-bid work need different signals.

  1. Log the lead, owner, delivery method, relationship, timing and next contact.
  2. Review stale pursuits.
  3. Distinguish repeat work from open opportunities.

In Buildalytic: Quote and pursuit follow-up

Go/no-go and pursuit fit

Screen by delivery method, geography, capacity, client and qualification before spending estimating time.

  1. Confirm scope, region, capacity, competition, qualifications and commercial exposure.
  2. Assign a decision owner.
  3. Record why the pursuit was accepted or declined.

In Buildalytic: Operations for GCs

Owner RFQ, RFP and SOQ

Extract submission rules, evaluation criteria, dates, forms and required qualifications, then assemble an evidence-backed response.

  1. Build a compliance matrix from the instructions and addenda.
  2. Assign evidence and narrative owners.
  3. Check page limits, signatures, dates and submission receipt.

In Buildalytic: Knowledge base

Past performance, resumes and proposal reuse

Find eligible projects and personnel, validate dates and credentials, and reuse approved narratives.

  1. Filter completed jobs by size, scope, geography and delivery method.
  2. Verify project and personnel claims.
  3. Reuse approved material and flag gaps.

In Buildalytic: Knowledge base

Bid invitation and package release

Select scopes and invitees, distribute the right package and addenda, and track receipt and response.

  1. Map scopes to bidder lists.
  2. Issue the correct drawings, specs and bid form.
  3. Log distribution, acknowledgment, addenda and the cutoff.

In Buildalytic: Subcontractor bid follow-up

Bid outreach and coverage

Chase missing responses and keep a live coverage board by trade. Stop follow-up when a bidder declines.

  1. Track invited, reached, bidding, declined and submitted by trade.
  2. Prioritize uncovered scopes.
  3. Preserve handoffs and stop duplicate follow-up.
  4. After award, handle subcontractor schedule confirmations separately: record the requested work window, the response, conflicts and the superintendent responsible for resolving them.

In Buildalytic: Subcontractor bid follow-up

Guide: Read the full walkthrough

DBE and participation sourcing

Find eligible firms by scope and geography, record outreach and responses, and preserve participation evidence.

  1. Identify the participation requirements that apply.
  2. Validate eligibility and work codes.
  3. Document contacts, responses and coverage for the bid record.
  4. When a participation meeting is required, track invitation, confirmation, attendance and follow-up by firm.

In Buildalytic: Subcontractor bid follow-up

Guide: Read the full walkthrough

Subcontractor prequalification

Check insurance, safety, financial capacity and experience before award. Prequalification is not the same as project onboarding.

  1. Collect credentials, experience, safety, financial and bonding evidence.
  2. Escalate exceptions before award.
  3. Recheck project-specific requirements separately.

In Buildalytic: COI and subcontractor compliance

Scope gaps, exclusions and leveling

Normalize quotes, tag omissions and qualifications, compare like for like, and send scope clarifications before award.

  1. Normalize units, allowances, inclusions, exclusions, alternates and taxes.
  2. Clarify differences before comparing.
  3. Attach scope decisions to the award.

In Buildalytic: Subcontractor bid follow-up

Bid history and benchmarking

Retrieve past jobs and prices with date, scope, unit, region and context intact.

  1. Index bid outcome, scope, units, location, date and competitors where known.
  2. Adjust for comparable conditions.
  3. Show gaps instead of presenting a guaranteed win rate.

In Buildalytic: Construction intelligence

Takeoff and quantity measurement

Measure quantities from drawings, reconcile revisions and assumptions, and hand quantities to pricing.

  1. Confirm scale and revision.
  2. Count or measure by scope and location.
  3. Save drawing references and assumptions.
  4. Reconcile revisions before pricing.

In Buildalytic: Operations for subcontractors

Production rates, labor and estimate build-up

Convert quantities into labor hours, crews and cost using comparable historical work. Keep quantity and unit rate separate.

  1. Choose comparable historical production.
  2. Adjust crew, site, access and schedule assumptions.
  3. Separate productivity judgment from measured quantities.

In Buildalytic: Intelligence for subcontractors

Estimate review, alternates and cost position

Separate base and alternate scenarios, avoid double counting, reconcile changes by phase and quantify exposure.

  1. Trace each change to quantity, unit rate, scope or allowance.
  2. Validate totals and isolate mutually exclusive scenarios.
  3. Mark unresolved assumptions.

In Buildalytic: Intelligence for GCs

Bid handoff to operations

Transfer scope, exclusions, assumptions, cost codes, vendor quotes and open risks from estimating to delivery.

  1. Freeze the award scope and estimate.
  2. Map budget codes.
  3. Hand over quote validity, long leads, exclusions, procurement owners and open RFIs.

In Buildalytic: Operations for GCs

Guide: Read the full walkthrough

10 workflows

Design, permitting and procurement

Drawings, specifications, submittals, permits and the materials that follow them.

Drawing quality, plan and spec review, and RFIs

Detect omissions or conflicts, preserve drawing and spec references, and route RFIs to the responsible reviewer.

  1. Record drawing and spec versions.
  2. Distinguish missing information from conflicts.
  3. Issue a focused question.
  4. Distribute the response and assess the cost and schedule effect.

In Buildalytic: Documents, submittals and RFIs

Spec books and geotechnical report review

Pull actionable requirements from long specifications and soils reports, with links to the governing sections.

  1. Extract tests, material constraints, submittals and site assumptions with references.
  2. Assign actions.
  3. Reconcile differences across reports.

In Buildalytic: Knowledge base

Constructability and design coordination

Resolve conflicts before fabrication or installation, and keep responsibility clear across designers, GC and trade detailers.

  1. Review access, sequence, clearances and trade interfaces.
  2. Assign issues with model or sheet references.
  3. Verify the resolution before fabrication.

In Buildalytic: Operations for GCs

2D issue sets versus 3D authoring

Design teams may author in 3D and issue 2D. The GC or VDC team rebuilds or checks models for coordination.

  1. Define what the GC receives and who reconstructs coordination geometry.
  2. Compare it with the issued sheets.
  3. Track revision and fabrication approval separately.

In Buildalytic: Autodesk Construction Cloud integration

Submittal register, package assembly and approval

Identify required submittals, collect product data, track routing and comments, and keep the approved version.

  1. Extract the required packages.
  2. Collect product data, shop drawings and certifications.
  3. Route for review and track revise and resubmit.
  4. Link the approval to release.

In Buildalytic: Documents, submittals and RFIs

Submittal-to-spec compliance and substitutions

Compare the proposed material or assembly to the specs and plans before release, and document deviations and approvals.

  1. Compare grade, dimensions, performance and installation against contract references.
  2. Flag deviations.
  3. Confirm approval before purchase or fabrication.

In Buildalytic: Documents, submittals and RFIs

Permits, utilities and inspections

Track jurisdiction, submission, dependencies, comments, utility dates and inspection holds, and keep external bottlenecks visible.

  1. Track submission, jurisdiction, comments and resubmission.
  2. Track utility dependencies and inspection readiness.
  3. Update affected milestones when external dates slip.

In Buildalytic: Proactive alerts

Supplier quote collection and package sourcing

Invite suppliers against a defined package, chase responses, compare quote terms and record the award basis.

  1. Issue the package and due date.
  2. Track nonresponse and follow up.
  3. Level lead time, price, freight and exclusions.
  4. Keep the selection basis.

In Buildalytic: Procurement and equipment

Purchase orders, receipts and long leads

Link PO lines to commitments, deliveries and invoices, and flag lead-time, substitution and quantity exceptions.

  1. Convert approved quotes to PO lines.
  2. Monitor promised and actual receipt.
  3. Record partial deliveries, damaged goods and revised dates.

In Buildalytic: Procurement and equipment

Inventory, laydown and material logistics

Know what is on site, in transit, reserved or reusable, and coordinate staging, access and availability.

  1. Track available, reserved, delivered and installed material.
  2. Coordinate access, staging, unloading and transfer.
  3. Flag shortages and surplus.

In Buildalytic: Procurement and equipment

18 workflows

Field delivery and labor

Daily reporting, crews, craft workforce, schedules, equipment, quality and changes.

Daily field logs and distribution

Capture location, activities, weather, manpower, delays, deliveries and photos, then review, sign and post to the right job.

  1. Capture date, location, activities, weather, manpower, delays, inspections, equipment and photos.
  2. Review and sign.
  3. File by job and send only after approval.

In Buildalytic: Daily reports by phone

Field photos and retrieval

Attach photos to the right job, shift and report, with support for delayed uploads, search and reliable retrieval.

  1. Attach late uploads to the original shift and location.
  2. Keep timestamp and context.
  3. Check the report layout and link to the job record.

In Buildalytic: Job photos by text

Voice, language and low-friction capture

Let field staff report by voice or mobile. Keep the capture language separate from the required output language, and keep review.

  1. Collect by mobile, voice or form.
  2. Confirm job, names and quantities.
  3. Apply the required output language and allow foreman corrections before filing.

In Buildalytic: Every language

Production quantities and cost codes

Code labor, equipment and installed quantities to the same job and activity, and compare actual production with the estimate.

  1. Record installed units, labor and equipment against the same job and activity.
  2. Resolve mismatches before posting to job cost.
  3. Compare to estimated production.

In Buildalytic: Daily reports by phone

Crew dispatch, staffing and transfers

Match people and qualifications to jobs and shifts, and handle travel, changes, approvals and crew notifications.

  1. Match certifications, availability and location.
  2. Route transfer approvals.
  3. Notify crews and supervisors.
  4. Reconcile late changes and travel.

In Buildalytic: Crew dispatch by text

Guide: Read the full walkthrough

Craft worker baseball cards and annual refresh

A baseball card is a searchable profile for a craft worker. Workforce planners use it to find people with the right skills, credentials, experience, location and availability for a job.

  1. Import the active craft roster and existing profiles. Carry the employee ID as an internal matching key and check for missing, stale or conflicting contact details.
  2. Contact workers after their shift in their local time zone. Use recognizable caller identification, offer English or Spanish, and confirm the intended worker before discussing profile details. Route wrong numbers and unreachable workers to a correction queue, and give missed calls a callback path.
  3. Capture trade skills, certifications and expiration dates, safety training, apprenticeship and access qualifications, current assignment, region, availability, and willingness to travel or relocate. Ask what has changed since the prior update and keep a history of changes.
  4. Normalize skills and credentials against the approved bilingual list. Match spoken job names to project IDs, keep numeric fields typed, and route ambiguous matches or unverified credentials for review.
  5. Return reviewed changes to the existing profile by employee ID through an approved export or integration. Reconcile successful writes, missing matches and discrepancies with the HR roster.

In Buildalytic: Workforce profiles

Guide: Read the full walkthrough

New hire craft profile intake

Build the profile in the first week, then reuse it for refreshes, qualification updates and transfers.

  1. Trigger intake in the first week after HR creates the employee record. Use the internal employee ID to associate the phone or email outreach with the correct profile.
  2. Collect baseline skills, qualifications and travel preferences. Follow up on incomplete profiles and route unknown or unverified credentials to craft training.
  3. Publish the reviewed record for workforce planning. Use the same profile for annual refreshes, qualification updates and later transfer requests.

In Buildalytic: Workforce profiles

Craft transfer and weekly jobsite assignment

Match staffing needs to worker profiles, confirm assignments and make sure every worker knows where to report.

  1. List staffing needs by project, date, trade and qualification. Filter current worker profiles by availability, credentials, location and stated travel preferences.
  2. Review exceptions with the responsible supervisors and confirm the approved assignment in the workforce system. Keep worker preferences and final assignments in separate fields.
  3. For workers rotating across sites, send the confirmed site, start time and reporting instructions by phone or text. Record acknowledgment and send missing confirmations or conflicts to the supervisor.
  4. If an assignment changes, issue the corrected instructions and withdraw the prior assignment. Keep the effective date and acknowledgment so supervisors can see which instructions the worker received.

In Buildalytic: Crew dispatch by text

Credential expiration follow-up

Use recorded expiration dates to keep certifications current before they block an assignment.

  1. Build a renewal queue from recorded expiration dates.
  2. Ask workers or craft training for updated evidence.
  3. Review it and update the existing profile.
  4. Escalate an expired or unverified credential before assigning work that requires it.

In Buildalytic: Workforce profiles

Guide: Read the full walkthrough

Hiring, retention and knowledge transfer

Capture experienced staff knowledge, help new hires find answers, and reduce bottlenecks from retirements and scarce specialists.

  1. Capture qualifications and onboarding tasks.
  2. Hand down job-specific practices and escalation paths.
  3. Check that new staff can find and apply the guidance.

In Buildalytic: Knowledge base

Timekeeping and field payroll handoff

Collect hours, work classification, job and cost code, and reconcile corrections before payroll and job-cost posting.

  1. Submit hours by worker, job, task and classification.
  2. Review overtime and multi-job splits.
  3. Reconcile payroll and job-cost exports.

In Buildalytic: Certified payroll

Schedules, lookaheads and dependency changes

Keep short-term plans aligned with master milestones, material dates, crew availability and impact notices.

  1. Translate milestones into executable crew tasks.
  2. Identify access, inspection and predecessor constraints.
  3. Assign owners and issue impact notices.

In Buildalytic: Proactive alerts

Equipment allocation and usage

Match equipment to jobs, capture runtime or idle time, coordinate moves, and feed utilization and job cost.

  1. Reserve units by job and day.
  2. Log hours, idle time and transfers.
  3. Reconcile rentals, returns and charges with field records.

In Buildalytic: Procurement and equipment

Safety and incident evidence

Record checks, incidents and corrective action, and route exceptions to the responsible safety lead.

  1. Record observations, checks, incident facts and the corrective owner.
  2. Route sensitive details appropriately.
  3. Verify closure.

In Buildalytic: Field answers by text

Quality, punch and rework

Document defects by location and responsible trade, follow corrections and keep evidence before closeout.

  1. Record the defect, location, trade and evidence.
  2. Distinguish correction from scope change.
  3. Verify and sign off before closeout.

In Buildalytic: Closeout and documents

Field-to-office and designer handoffs

Move decisions and context between office, GC, designer and trade, with owners, deadlines and records.

  1. Send the current drawing, scope, constraint and decision owner.
  2. Record acknowledgment.
  3. Return resolved decisions to the field.

In Buildalytic: Team chat

Changes, T&M and backcharges

Document direction, quantities, signatures and cost promptly, and keep authorized, submitted and collectible changes apart.

  1. Record direction, labor, material and equipment daily.
  2. Obtain authorization and signatures.
  3. Track proposed, approved, billed, disputed and collected amounts separately.

In Buildalytic: Extra work documentation

Closeout, turnover and warranty

Collect as-builts, O&M manuals, warranties and acceptance records, and track outstanding deliverables before final release.

  1. Index acceptance, punch, as-builts, manuals and warranties.
  2. Check completeness by trade.
  3. Connect deliverables to final billing and handover.

In Buildalytic: Closeout and documents

Guide: Read the full walkthrough

14 workflows

Accounting, compliance and controls

Invoices, pay applications, cash, insurance, certified payroll and contract risk.

AP inbox, coding and approval

Capture incoming invoices, code line items, resolve exceptions and route for review before posting.

  1. Capture the invoice and vendor.
  2. Detect duplicates.
  3. Split lines by job and cost code.
  4. Route to a reviewer and post only after exceptions clear.

In Buildalytic: AP automation

Guide: Read the full walkthrough

PO-to-invoice matching

Compare PO, invoice and receiving evidence where available, and handle partials, unmatched lines and allocation across jobs.

  1. Match quantity, unit price and receipt evidence to PO lines.
  2. Handle partials, freight, missing POs and approved variance before payment.

In Buildalytic: AP automation

Supplier payment status and inquiries

Answer supplier and subcontractor questions from actual approval and payment status, and route exceptions to AP.

  1. Look up receipt, approval, hold and payment state.
  2. Reply from verified data.
  3. Send disputed invoices to the assigned processor.

In Buildalytic: Payment follow-up

Sub pay apps, owner billing and draw tracking

Collect progress quantities and documents, validate billable status, submit to the mandated platform and follow approvals.

  1. Collect billed quantities, change approvals and releases.
  2. Check stored materials and retention.
  3. Submit to the mandated destination and reconcile acceptance.

In Buildalytic: Payment intelligence for subcontractors

Guide: Read the full walkthrough

AR, collections and cash visibility

Reconcile aging with billing acceptance, promise-to-pay, disputes and holds, assign the next follow-up and keep the history.

  1. Reconcile aging with draw acceptance, funding timing, holds and disputes.
  2. Assign the follow-up and next date.
  3. Forecast using actual payment milestones.

In Buildalytic: AR and collections

Retention, releases and lien deadlines

Track prerequisites and deadline ownership alongside billing, payments and closeout. Validate jurisdiction separately.

  1. Track job-specific notices, waiver type, amount and payment status.
  2. Assign a deadline owner.
  3. Confirm prerequisites for retention release.

In Buildalytic: Retainage and lien waivers

Cost reporting, WIP and financial forecasts

Connect estimate, commitments, actuals and changes, and review remaining cost, margin and cash exposure.

  1. Bring actuals, commitments, approved changes and remaining cost into the monthly review.
  2. Explain margin movement.
  3. Project collections.

In Buildalytic: Cash flow and payments

COIs, endorsements and expiration

Check project-specific coverage and endorsements before mobilization, chase renewals, and block or escalate exceptions.

  1. Compare project and subcontract coverage requirements to policies and endorsements.
  2. Track expiration and exceptions.
  3. Get accountable approval before mobilization or payment.

In Buildalytic: COI tracking

Guide: Read the full walkthrough

Certified payroll collection and tier tracking

Identify every obligated firm and tier, and track weekly submissions, zero-work weeks, missing weeks and correction ownership.

  1. Enroll every required tier.
  2. Track weekly filings, missing weeks and no-work reports.
  3. Assign corrections and keep accepted submissions.

In Buildalytic: Collect subcontractor payrolls

Wage determination and fringe math

Tie location, award and classification to the applicable schedule, and check base, fringe and overtime as distinct components.

  1. Select the project-specific determination and classification.
  2. Check base, cash fringe, benefit credits, split rates and overtime separately.
  3. Route disputes for review.

In Buildalytic: Prevailing wage compliance

Classification, apprentice and skilled workforce checks

Test classifications and project-specific workforce obligations with evidence, and keep exceptions and reviewer approval.

  1. Compare actual tasks with the reported classification.
  2. Distinguish shop from field work where it applies.
  3. Cross-check apprentice paperwork, ratios, local hire and skilled workforce evidence.

In Buildalytic: Apprenticeship compliance

Payroll filing and portal reconciliation

Turn per-job weekly records into portal-specific outputs and reconcile failures, dates and acceptance.

  1. Split weekly master data by company, job, account and pay period.
  2. Transform it to project templates.
  3. Reconcile check dates, upload acceptance and rejections.

In Buildalytic: Certified payroll

Guide: Read the full walkthrough

Compliance gating and payment holds

Keep mobilization and payment gates separate, and tie each hold or release to the exact outstanding document and accountable reviewer.

  1. Cross-check worker authorization, fringe, participation and apprentice records against weekly payroll.
  2. Show the missing proof.
  3. Separate mobilization and payment gates and log release approval.

In Buildalytic: Certified payroll audit

Guide: Read the full walkthrough

Contract review and commercial risk

Extract terms, exclusions and risk allocation, compare them against scope and policy, and route judgment to a qualified reviewer.

  1. Compare obligations and flow-downs with scope, insurance and schedule assumptions.
  2. Flag risk.
  3. Get qualified review before commitment.

In Buildalytic: Construction intelligence

7 workflows

Systems, communication and adoption

Calls, outreach, search, integrations, reporting, security and rollout.

Inbound routing, overflow and emergency intake

Identify caller intent, route or take a message, and follow explicit escalation for urgent incidents and after-hours coverage.

  1. Classify calls, then route or take a message.
  2. Use defined after-hours escalation.
  3. Avoid commitments outside intake authority.
  4. Keep a fallback and a message audit trail.

In Buildalytic: AI receptionist

ERP and PM interoperability

Map projects, companies, cost codes and write-back scope, decide the system of record, and reconcile failures or duplicates.

  1. Map jobs, people, cost codes and company entities.
  2. Designate record ownership and write-back approval.
  3. Reconcile errors and prevent duplicate entry.

In Buildalytic: Trimble Viewpoint Vista integration

Reporting and cross-project visibility

Consolidate status without repeated PM queries, and show the source, refresh date and owner of each exception.

  1. Aggregate project milestones, coverage and exceptions.
  2. Show refresh date, source and responsible owner.
  3. Separate confirmed status from estimates.

In Buildalytic: Construction intelligence

Security, hosting and data access

Resolve hosting, access, isolation, ownership, retention and integration permissions before using real customer data.

  1. Verify hosting region, access control, isolation, retention, audit and permissions.
  2. Document integration boundaries before connecting live data.

In Buildalytic: Security

Rollout, governance and adoption

Choose a narrow pilot, define pass and fail and human review, and compare the current process, an internal build and an external option.

  1. Pilot a real job with a baseline, acceptance criteria and exception handling.
  2. Evaluate adoption and duplicate work.
  3. Check whether the workflow fits existing systems.

In Buildalytic: Deployment

Bring one workflow and one real job.

Pick the workflow that costs your team the most time. See Buildalytic run it with your records, your rules and human review where you want it.

One full Platform plan. No standard setup fee. Start with one supported workflow.

Plan your rollout

Pricing, security reviews, procurement and rollout across your projects and regions.

Build with us

Help build the AI teammate for construction. We're hiring.

Explore careers