Skip to content
Buildalytic
Field notes / Payroll and compliance

How to fill out form WH-347, line by line (2026), with a worked certified payroll example

How to fill out the current WH-347 certified payroll form column by column, with a worked week using real Davis-Bacon rates, the Statement of Compliance boxes and the mistakes reviewers reject.

By Buildalytic Research Desk12 min read

Editorial scene of a certified payroll form being reviewed
Illustrative editorial scene. The workers in the example are fictional; the wage rates come from a published wage determination.
The short answer

To fill out form WH-347, complete the header (project, contract number, payroll number, wage determination and week ending date), then one row per worker and classification: identifying number, journeyworker or registered apprentice, classification, daily straight-time and overtime hours, rate, fringe credit, cash in lieu of fringe, gross pay, deductions and net pay. Sign page 2, the Statement of Compliance, every week.

What to take away

  • Use the current form: OMB 1235-0008, expiring 01/31/2028.
  • Never enter full Social Security numbers; use the last four digits or another worker-specific number.
  • Report the classification for the work actually performed, row by row.
  • Keep the hourly rate (6A), fringe credit (6B) and cash in lieu of fringe (6C) separate.
  • Boxes 1, 2, 3 and 6 of the Statement of Compliance must always be checked.

What WH-347 is and when you need it

WH-347 is the U.S. Department of Labor's optional payroll form for contractors and subcontractors on construction covered by the Davis-Bacon and Related Acts. The form itself is optional; the information and the weekly certification are not. DOL's instructions say covered contractors and subcontractors must submit payroll information on a weekly basis, and you may use your own layout as long as it contains the same information and the signed statement.

Payrolls go to the federal agency if it is a party to the contract, or otherwise to the applicant, sponsor or owner that keeps the records and forwards them. On most projects, a subcontractor sends its weekly payroll to the prime contractor, who reviews it and submits it with its own.

The current form carries OMB control number 1235-0008 and expires on 01/31/2028, according to DOL's instructions page checked November 14, 2026. DOL also offers an online version that you can print or save as a PDF.

Before you start: what you need on your desk

Gather these before you open the form: the contract or subcontract with the project and contract numbers; the wage determination and modification incorporated in the contract; your time records showing each worker's daily hours by classification; payroll registers showing rates, gross pay and deductions for all work; fringe benefit plan documents and contribution amounts; and apprenticeship registration documents for anyone paid as an apprentice.

If the time records don't show hours by classification for a worker who did more than one kind of work, fix that first. The form can only be as accurate as the records behind it, and the certifying official is signing for both.

Every column, in order

Column labels follow DOL's current instructions. One worker can need more than one row: if a worker performs work in two classifications in the same week, use a row for each and keep the same entry number.

Every column, in order
ColumnLabelWhat to enter
1AWorker entry no.Sequential numbers starting at 1; repeat the number on each row for the same worker
1B to 1DLast name, first name, middle initialAs on your payroll records
1EWorker identifying no.Last four digits of the Social Security number or another number specific to the worker; never the full SSN
2Journeyworker or registered apprenticeJ or RA; for RA, also the apprentice's progression level
3Labor classificationThe classification for the work actually performed, from the wage determination
4Hours worked each dayDay letter and date for each day, with straight-time (ST) and overtime (OT) hours on separate lines
5Total hours worked for the weekST and OT totals for the row
6AHourly wage rate paidThe ST and OT cash rates; do not include cash paid in lieu of fringe here
6BTotal fringe benefit creditThe hourly credit for bona fide plan contributions, from page 2
6CPayment in lieu of fringe benefitsCash paid in place of fringe benefits during the week
7AGross amount earned, this projectGross pay for work on this project
7BGross amount earned, all workGross pay for all work that week, on any project
8Deductions for all workTax withholdings, FICA, other and total deductions; do not pro-rate
9Net payment to workerNet pay for all work

A worked week, using real rates

Rates come from wage determination CO20260001, modification 2 (Colorado, building, published November 5, 2026), for Summit County: electrician (ELEC0068-007) $49.35 plus $19.93 fringe, carpenter (CARP9901-006) $33.11 plus $12.17 fringe, and common laborer (SUCO2001-008) $9.75. The workers, hours and deductions are fictional. Withholding is an invented figure; FICA is 7.65 percent.

A worked week, using real rates
ColumnWorker 1 (electrician)Worker 2, row 1 (carpenter)Worker 2, row 2 (laborer)
1A entry no.122
1E identifying no.482111771177
2 J or RAJJJ
3 classificationElectricianCarpenterLaborer, common
4 hoursMon to Fri 8 ST; Sat 4 OTMon to Thu 7.5 STThu 2 ST, Fri 8 ST
5 total hours40 ST, 4 OT30 ST10 ST
6A rateST $49.35; OT $74.03 (1.5 × $49.35)$33.11$15.00 (above the $9.75 listed rate)
6B fringe credit$12.00 per hour to plans$0.00$0.00
6C cash in lieu$7.93 per hour ($19.93 − $12.00)$12.17 per hour$0.00
7A gross, this project$2,619.02$1,508.40 for both rows
8 deductions$310.00 withholding + $200.36 FICA = $510.36$150.00 withholding + $115.39 FICA = $265.39
9 net pay$2,108.66$1,243.01

How the worked numbers add up

Worker 1: straight time is 40 × $49.35 = $1,974.00. Overtime is 4 × (1.5 × $49.35) = $296.10; overtime multiplies only the base rate. Fringe is owed on all 44 hours: 44 × $19.93 = $876.92. The employer pays $12.00 an hour to bona fide plans (44 × $12.00 = $528.00, shown in 6B and not in gross pay) and the remaining $7.93 an hour in cash (44 × $7.93 = $348.92, shown in 6C and included in gross). Gross is $1,974.00 + $296.10 + $348.92 = $2,619.02. FICA at 7.65 percent is $200.36; with $310.00 withholding, deductions are $510.36 and net pay is $2,108.66.

Worker 2 split the week between two classifications, so the payroll has two rows with the same entry number. Carpentry: 30 × $33.11 = $993.30, plus fringe paid entirely as cash, 30 × $12.17 = $365.10. Laborer work: 10 × $15.00 = $150.00. Gross is $1,508.40; deductions are $150.00 withholding plus $115.39 FICA, so net pay is $1,243.01. Paying the laborer rate for those ten hours is only allowed because the time records show them separately; otherwise all forty hours would be owed at the carpenter rate.

Worker 2's daily hours: carpentry Monday to Thursday at 7.5 hours a day, and laborer work for 2 hours on Thursday and 8 hours on Friday. Enter each day's hours under its date on the matching row, so the two rows add up to the hours actually worked each day. If the contract is covered by Executive Order 13658, the laborer floor is $13.65 an hour through December 31, 2026, per the wage determination.

Page 2: the Statement of Compliance

The certifying official signs a statement that begins: “I paid or supervised the payment of the laborers or mechanics working on the above project during the stated time period.” It then certifies, among other things, that the payroll is correct and complete, that wage and fringe rates are not less than those in the wage determination, that classifications match the work actually performed, that any apprentices are in a registered program, how fringe benefits were paid, and that workers received full weekly wages without improper deductions.

DOL's instructions say boxes 1, 2, 3 and 6 must always be checked; box 4 applies when apprentices are on the payroll and box 5 when fringe credit is claimed for plan contributions. Page 2 also has the table of hourly fringe benefit credits that supports column 6B.

Electronic signatures that are legally valid are accepted; photocopied or scanned signatures are not. The statement is subject to the penalties in 18 U.S.C. 1001, which DOL describes as a fine, up to five years in prison, or both. That is why the person signing should be the person who actually reviewed the payroll.

The fringe benefit credit, explained

Column 6B shows the hourly credit you take for contributions to bona fide fringe benefit plans, such as health insurance, pension or apprenticeship funds. The page 2 table lists each plan and its hourly amount. Credit is generally calculated by dividing the annual contribution by all hours the worker works in the year on all jobs, not only Davis-Bacon hours; this is often called annualization.

If the total plan credit is less than the fringe amount in the wage determination, pay the difference in cash and show it in 6C, as in worker 1's example ($19.93 required, $12.00 credited, $7.93 cash). If you pay all fringe in cash, 6B is zero and the full fringe appears in 6C, as for worker 2's carpentry hours. Our worked example and fringe calculator walk through annualization with numbers.

Apprentice rows

Mark an apprentice RA in column 2 and include the apprentice's progression level. Apprentice rates and ratios apply only to apprentices registered in a program approved by the Department of Labor's Office of Apprenticeship or a recognized state apprenticeship agency, and box 4 of the Statement of Compliance certifies that. An apprentice who isn't registered must be paid the journeyworker rate for the work performed.

Keep the registration certificate and the program's wage progression schedule with the payroll, because reviewers ask for both.

No-work weeks, corrections and the final payroll

Number payrolls consecutively from your first week on the project. Ask the agency or prime contractor how it wants weeks with no work reported; many expect a payroll or statement marked no work so the sequence has no gaps. When you correct a payroll, submit a revised payroll for the same week and keep the original, so the history is clear.

Check the final payroll box on your last week. A missing final payroll is a common reason retainage or final payment is held.

WH-347 and state certified payroll forms

A federal WH-347 does not satisfy every state requirement. California public works payroll goes through the Department of Industrial Relations' electronic certified payroll system, and Oregon requires its own WH-38 statement attached to payroll records. On a project with both federal and state requirements, keep the paths separate and confirm each recipient's format.

Our California eCPR and Oregon WH-38 guides cover those requirements step by step.

A checklist before you sign

Run through this list for every weekly payroll.

A checklist before you sign
CheckWhy it matters
Header matches the contract and wage determinationA wrong determination makes every rate check meaningless
No full Social Security numbersDOL's instructions prohibit them
Classification matches the work, row by rowThe statement certifies it
Hours over 40 paid at 1.5 × the base rateOvertime is required on covered contracts
6A, 6B and 6C kept separateReviewers check fringe compliance from these columns
Page 2 fringe table supports 6BCredit without support is disallowed
Apprentices registered and within ratioOtherwise journeyworker rates apply
Deductions shown for all work, not pro-ratedDOL's instructions require it
Boxes 1, 2, 3 and 6 checked; 4 and 5 when they applyMissing boxes get the payroll returned
Valid signature, not a scanScanned signatures are not accepted

Mistakes that get WH-347s rejected

Full Social Security numbers on the form. The wrong wage determination or modification in the header. A classification that matches the job title instead of the work performed. Overtime calculated on base plus fringe, or not calculated at all for hours over 40 on covered contracts. Cash in lieu of fringe added to column 6A instead of 6C. Fringe credit claimed without the page 2 table. An apprentice paid apprentice rates without registration. Deductions pro-rated to the project instead of reported for all work. A scanned signature. A missing week in the payroll number sequence.

Our worked Davis-Bacon payroll example shows how four of these errors look in real numbers and what each one costs.

If you collect WH-347s from subcontractors

The prime contractor is responsible for its subcontractors' compliance, so it has to collect every sub's weekly payroll, check it and keep the record. The work is mostly chasing: which employer and week is missing, which payroll needs a correction, which no-work week still needs a statement.

Buildalytic collects subcontractors' certified payrolls, checks wages, fringe and classifications against the wage determination, and has Brody follow up by call and text on missing and corrected weeks, keeping the original, the correction and the reviewer's decision together.

Common questions

Is form WH-347 required?

No. The form is optional, but the payroll information and the signed Statement of Compliance are required every week on covered work. Any layout with the same information is accepted.

How often do you submit WH-347?

Weekly, for each week covered work is performed, to the contracting agency or to the prime contractor or owner that forwards it.

What goes in column 6B and 6C on WH-347?

6B is the hourly credit for fringe benefits paid to bona fide plans; 6C is cash paid to the worker in lieu of fringe benefits. Keep both out of 6A, the hourly wage rate.

Can I put the worker's Social Security number on WH-347?

No. Use the last four digits or another number specific to the worker. DOL's instructions say full Social Security numbers must not be included.

How do I report a worker in two classifications?

Use a separate row for each classification with the same worker entry number, and show the hours worked in each, supported by time records.

When does the current WH-347 expire?

DOL's instructions show OMB control number 1235-0008 with an expiration of 01/31/2028 (checked November 14, 2026).

Sources and editorial notes

Prepared with AI assistance. Reference date: 2026-11-13. Worked examples are illustrative and are not customer results. Product details can change; confirm the current scope and terms before rollout.

How we prepare and update field notes
See it on your workflow

Collect and check every sub's WH-347.

Bring one project's subcontractor list and a sample week. See missing payrolls followed up and each finding reviewed before you certify.

Start with the call, text or record your team already handles. Review the expected outcome and the human handoff before choosing a rollout.

Talk to the payroll team Explore the relevant capability