Best AIA billing software for subcontractors (2026): G702 and G703 pay apps compared

AIA billing software for subcontractors compared: G702 and G703 pay applications, retainage, lien waivers, GC portals and published prices, plus how the G702 and G703 math works.

By Buildalytic Research Desk10 min read

Editorial scene of an AIA-style pay application on a desk
Illustrative editorial scene, not a vendor test.
The short answer

The best AIA billing software for a subcontractor builds the G702 application and G703 continuation sheet from your schedule of values, tracks retainage and change orders, attaches lien waivers and follows each pay app to payment across every GC. Siteline is built for subs billing many GCs; Knowify starts at $99 a month; GCPay and Trimble Pay are portals GCs invite subs into. Buildalytic tracks each pay app's status and follows up on what is holding payment.

What to take away

  • G702 is the summary application; G703 is the line-by-line continuation sheet behind it.
  • Retainage, stored materials and change orders are where most pay apps go wrong.
  • Many subs bill through whatever portal each GC chooses, so check your GCs first.
  • Official AIA documents are sold by AIA Contract Documents; some software includes them through a partnership.

What AIA billing is

AIA billing is progress billing on the American Institute of Architects' G-series forms. G702, Application and Certificate for Payment, summarizes the contract sum, change orders, work completed, retainage and the amount due. G703, the Continuation Sheet for G702, lists each line of the schedule of values with its value, work completed and retainage. General contractors and owners often require subcontractors to bill on these forms or on a portal that reproduces them.

AIA billing software keeps the schedule of values, rolls each month's progress forward, does the math, attaches lien waivers and backup, and tracks the application until it is paid. For a subcontractor billing several GCs, the hard part is less the math than the different portals, deadlines and document requirements each GC sets.

The G702 lines, with a worked example

Illustrative numbers for a $500,000 subcontract with $25,000 of approved change orders and 10 percent retainage on both work and stored materials.

The G702 lines, with a worked example
G702 lineWhat it meansExample
1. Original contract sumThe subcontract value at signing$500,000
2. Net change by change ordersApproved change orders only+$25,000
3. Contract sum to dateLine 1 plus line 2$525,000
4. Total completed and stored to dateColumn G total from the G703$315,000 ($300,000 work + $15,000 stored)
5. RetainagePercent of completed work and of stored material$31,500 ($30,000 + $1,500)
6. Total earned less retainageLine 4 minus line 5$283,500
7. Less previous certificates for paymentLine 6 from the prior application$210,000
8. Current payment dueLine 6 minus line 7$73,500
9. Balance to finish, including retainageLine 3 minus line 6$241,500

The G703 continuation sheet, one line worked through

Illustrative drywall line from the same subcontract.

The G703 continuation sheet, one line worked through
G703 columnMeaningExample
A. Item no.Line number from the schedule of values3
B. Description of workScope of the lineDrywall, levels 1 to 3
C. Scheduled valueValue assigned to the line$120,000
D. From previous applicationWork completed and billed before$48,000
E. This periodWork completed this period$24,000
F. Materials presently storedStored on site or off site and not yet in D or E$6,000
G. Total completed and stored to dateD + E + F$78,000
% (G ÷ C)Percent complete including stored materials65%
H. Balance to finishC − G$42,000
I. RetainageRetainage on this line$7,800 at 10%

Stored materials: the line reviewers check hardest

Column F is for material bought and stored, on site or in an approved off-site location, but not yet installed. Most contracts let you bill it only with backup: the supplier invoice, a bill of lading or delivery ticket, photos, and for off-site storage, proof of insurance and sometimes a bill of sale transferring title to the owner. Expect a site visit for large off-site amounts.

When stored material is installed, it moves out of F and into work completed. Using the drywall line: next month the $6,000 of board in F is hung along with $10,000 of new work. Column E for that period shows $16,000, F drops to zero, and G rises from $78,000 to $88,000, because only the $10,000 of new work is new value. Billing the $6,000 again in E without clearing F is one of the most common double-bills a reviewer catches.

Retainage reductions, worked through

Many subcontracts reduce retainage once the work reaches a milestone, often 50 percent complete, if the work is on schedule. Read your clause carefully: some reduce the rate going forward, some release part of what was already held, and many make the reduction subject to the owner's or GC's approval.

Illustrative example on the same $525,000 subcontract, where retainage drops from 10 percent to 5 percent on work after 50 percent complete. At $262,500 completed, $26,250 is held. At the next application, $315,000 is completed. Retainage is $26,250 on the first half plus 5 percent of the next $52,500, or $2,625, for $28,875 in total, not the $31,500 a flat 10 percent would give. Set the reduction up in your billing software as a rule, or someone will keep applying 10 percent by habit.

Change orders on the pay app

Approved change orders go on G702 line 2 and as their own lines on the G703, usually added at the bottom with their change order number, so reviewers can see which scope the money belongs to. Pending or disputed changes don't belong on the application at all; billing them is the fastest way to get the whole pay app sent back.

Keep a log of each change order with its status, approved amount and the date the GC signed it. If extra work was done on a verbal direction, get the field ticket signed the same day so the change order can be priced and approved before the billing cutoff.

Lien waivers that travel with the pay app

Most GCs require a conditional progress waiver with each application, covering the amount being billed, and an unconditional progress waiver for the previous payment once it has cleared. Many also require waivers from your own suppliers and lower-tier subs. Several states mandate statutory waiver forms; where they do, use the exact form.

Never sign an unconditional waiver for money you haven't received. Track which waivers each GC requires, which have been sent and which are still owed by your suppliers, because a missing supplier waiver can hold your entire payment.

Why pay apps get sent back

Change orders billed before they were approved. Percent complete that doesn't match what the superintendent sees. Stored materials billed without an invoice, bill of lading or proof of insurance for off-site storage. Retainage calculated on the wrong base or at the wrong rate after a reduction. A line that exceeds its scheduled value. Math that doesn't tie between the G703 total and G702 line 4. A missing or wrong lien waiver, such as an unconditional waiver sent before payment. Late submission after the GC's cutoff date.

Most of these are caught by checking the continuation sheet against the field and the contract before submission, not by better forms.

AIA billing software compared

From each vendor's own website, checked November 14, 2026. “Not stated” means the pages we read don't say. Textura's website could not be read and is not included.

AIA billing software compared
SoftwareWho it's forG702 and G703Retainage and waiversPublished price
SitelineSubcontractors billing GCsG-702, G-703 and custom pay app formsRetention adjusted for the pay app, each line or periods; lien waiversCustom quote; unlimited users
KnowifyTrade contractorsG702/G703 pay apps; official AIA forms through AIA Contract Documents when clients require themRetainage tracked by phaseFrom $99 a month
GCPayGCs requiring subs to submit; subs submitBuilt-in official AIA G702/G703 formsConditional lien waivers exchanged with the pay appCustom; based on subcontracted volume
Trimble PayGCs collecting from subsCollects AIA pay apps from subcontractorsNot statedFree for subs a GC invites
PayappsContractors in Australia, New Zealand, the UK and IrelandProgress claimsRetention listed as a featureSubs from A$65 a claim or A$49 a month
FoundationContractors using its accounting suiteNot stated on pages readProgress billing and retainage in accountingCustom
BuildalyticSubs billing many GCs, and GCs tracking lower-tier pay appsReads G702 and G703 pay apps and tracks each one's status across GCsRetainage tracked per project and period; conditional and unconditional waivers; follow-up by call and textQuoted with the finance platform

The GC portal problem

A subcontractor working for ten general contractors may bill through several portals, each with its own login, cutoff date, waiver form and backup checklist. Siteline lists Textura, GCPay and Procore Pay among the GC portals it integrates with. Trimble Pay is free for subcontractors invited by a GC. Before choosing software, list your GCs, the portal each requires and the share of your billing each represents.

The work that portals don't do is chasing: finding out which application is stuck, why, and who has to act. Buildalytic tracks every pay application across GCs and has Brody follow up on the missing waiver, the unsigned change order or the overdue payment.

One billing month across eight GCs

Illustrative status on the 27th for a mechanical subcontractor. GC names are placeholders.

One billing month across eight GCs
GCHow it's billedCutoffStatusWhat's holding it
GC ATextura20thApprovedNothing; payment expected next cycle
GC BGCPay25thSubmittedAwaiting architect review
GC CProcore Pay25thReturnedChange order 7 billed before approval
GC DEmail with official AIA forms25thSubmittedSupplier waiver from pipe supplier missing
GC ETrimble Pay20thApprovedRetainage reduction not applied by GC; query sent
GC FEmail PDF30thDraftPercent complete under review with superintendent
GC GGCPay25thPaidUnconditional waiver for last month due
GC HOwner's portal via GC15thLateMissed cutoff; rolls to next month

What a slow pay app costs

A pay application that misses a cutoff often waits a full billing cycle. On an illustrative $120,000 monthly billing, a 30-day delay at an 8 percent cost of money is about $789 in carrying cost for that one application, before any line-of-credit fees or the time spent chasing it. Across eight GCs, two or three late or returned applications a month adds up quickly, which is why tracking status matters as much as preparing the form.

Do you need official AIA forms?

AIA Contract Documents sells the official G702 and G703 documents; its own guidance says purchasing through AIA Contract Documents is the only way to get verified official language, and that samples are not for finalization and certification. Some GCs accept a form that reproduces the same lines; others require the official documents. Knowify and GCPay describe access to official AIA forms; Siteline's site notes that users who want AIA forms must have or secure them.

Ask each GC what it accepts before paying for official forms you may not need.

Retainage: the money most subs leave too long

Retainage is often 5 to 10 percent of every payment, held until the end of the job, and it can be a large share of a subcontractor's profit. Track it by contract and period, note any reduction milestones in the contract, and start collecting closeout documents early, because final retainage usually waits on them.

Our retainage tracking spreadsheet and lien waiver software guides cover the release process in detail.

How to choose

If most of your billing goes through one GC's portal, start there. If you bill many GCs on different forms, a subcontractor-side billing tool such as Siteline or Knowify saves the most time. If your problem is pay apps stuck in review, waivers going back and forth and payments arriving late, add follow-up. Test with last month's hardest pay application: one with a change order, stored materials and a retainage reduction.

Getting set up in one billing cycle

Load each active contract's schedule of values, change orders and retainage terms. Enter last month's billed amounts so the D column starts correctly. Add each GC's waiver form, cutoff date and backup requirements. Run the next pay application in parallel with your current process, compare every line, then switch.

Common questions

What is the best AIA billing software for subcontractors?

Siteline is built for subs billing many GCs, Knowify publishes a price from $99 a month, and GCPay and Trimble Pay are GC portals subs are invited into. Buildalytic tracks each pay app's status across GCs and follows up on what is holding payment.

What is the difference between G702 and G703?

G702 is the Application and Certificate for Payment, the one-page summary. G703 is the Continuation Sheet, which lists each schedule of values line with work completed, stored materials and retainage.

How is retainage calculated on a G702?

As a percentage of completed work and of stored materials, shown on line 5, then subtracted from total completed and stored to give total earned less retainage on line 6.

Are stored materials included in percent complete?

Yes. G703 column G adds work completed and materials presently stored, and percent complete is G divided by the scheduled value.

Do I have to buy official AIA documents?

Only if your GC or owner requires them. AIA Contract Documents sells the official forms; some software includes them through a partnership.

Sources and editorial notes

Prepared with AI assistance. Reference date: 2026-11-14. Worked examples are illustrative and are not customer results. Product details can change; confirm the current scope and terms before rollout.

How we prepare and update field notes
See it on your workflow

See every pay app, across every GC.

Bring your open pay applications. See where each one sits, what is holding it and how Brody follows up.

Start with the call, text or record your team already handles. Review the expected outcome and the human handoff before choosing a rollout.

See pay app tracking Explore the relevant capability