The best AIA billing software for a subcontractor builds the G702 application and G703 continuation sheet from your schedule of values, tracks retainage and change orders, attaches lien waivers and follows each pay app to payment across every GC. Siteline is built for subs billing many GCs; Knowify starts at $99 a month; GCPay and Trimble Pay are portals GCs invite subs into. Buildalytic tracks each pay app's status and follows up on what is holding payment.
What to take away
- G702 is the summary application; G703 is the line-by-line continuation sheet behind it.
- Retainage, stored materials and change orders are where most pay apps go wrong.
- Many subs bill through whatever portal each GC chooses, so check your GCs first.
- Official AIA documents are sold by AIA Contract Documents; some software includes them through a partnership.
What AIA billing is
AIA billing is progress billing on the American Institute of Architects' G-series forms. G702, Application and Certificate for Payment, summarizes the contract sum, change orders, work completed, retainage and the amount due. G703, the Continuation Sheet for G702, lists each line of the schedule of values with its value, work completed and retainage. General contractors and owners often require subcontractors to bill on these forms or on a portal that reproduces them.
AIA billing software keeps the schedule of values, rolls each month's progress forward, does the math, attaches lien waivers and backup, and tracks the application until it is paid. For a subcontractor billing several GCs, the hard part is less the math than the different portals, deadlines and document requirements each GC sets.
The G702 lines, with a worked example
Illustrative numbers for a $500,000 subcontract with $25,000 of approved change orders and 10 percent retainage on both work and stored materials.
| G702 line | What it means | Example |
|---|---|---|
| 1. Original contract sum | The subcontract value at signing | $500,000 |
| 2. Net change by change orders | Approved change orders only | +$25,000 |
| 3. Contract sum to date | Line 1 plus line 2 | $525,000 |
| 4. Total completed and stored to date | Column G total from the G703 | $315,000 ($300,000 work + $15,000 stored) |
| 5. Retainage | Percent of completed work and of stored material | $31,500 ($30,000 + $1,500) |
| 6. Total earned less retainage | Line 4 minus line 5 | $283,500 |
| 7. Less previous certificates for payment | Line 6 from the prior application | $210,000 |
| 8. Current payment due | Line 6 minus line 7 | $73,500 |
| 9. Balance to finish, including retainage | Line 3 minus line 6 | $241,500 |
The G703 continuation sheet, one line worked through
Illustrative drywall line from the same subcontract.
| G703 column | Meaning | Example |
|---|---|---|
| A. Item no. | Line number from the schedule of values | 3 |
| B. Description of work | Scope of the line | Drywall, levels 1 to 3 |
| C. Scheduled value | Value assigned to the line | $120,000 |
| D. From previous application | Work completed and billed before | $48,000 |
| E. This period | Work completed this period | $24,000 |
| F. Materials presently stored | Stored on site or off site and not yet in D or E | $6,000 |
| G. Total completed and stored to date | D + E + F | $78,000 |
| % (G ÷ C) | Percent complete including stored materials | 65% |
| H. Balance to finish | C − G | $42,000 |
| I. Retainage | Retainage on this line | $7,800 at 10% |
Stored materials: the line reviewers check hardest
Column F is for material bought and stored, on site or in an approved off-site location, but not yet installed. Most contracts let you bill it only with backup: the supplier invoice, a bill of lading or delivery ticket, photos, and for off-site storage, proof of insurance and sometimes a bill of sale transferring title to the owner. Expect a site visit for large off-site amounts.
When stored material is installed, it moves out of F and into work completed. Using the drywall line: next month the $6,000 of board in F is hung along with $10,000 of new work. Column E for that period shows $16,000, F drops to zero, and G rises from $78,000 to $88,000, because only the $10,000 of new work is new value. Billing the $6,000 again in E without clearing F is one of the most common double-bills a reviewer catches.
Retainage reductions, worked through
Many subcontracts reduce retainage once the work reaches a milestone, often 50 percent complete, if the work is on schedule. Read your clause carefully: some reduce the rate going forward, some release part of what was already held, and many make the reduction subject to the owner's or GC's approval.
Illustrative example on the same $525,000 subcontract, where retainage drops from 10 percent to 5 percent on work after 50 percent complete. At $262,500 completed, $26,250 is held. At the next application, $315,000 is completed. Retainage is $26,250 on the first half plus 5 percent of the next $52,500, or $2,625, for $28,875 in total, not the $31,500 a flat 10 percent would give. Set the reduction up in your billing software as a rule, or someone will keep applying 10 percent by habit.
Change orders on the pay app
Approved change orders go on G702 line 2 and as their own lines on the G703, usually added at the bottom with their change order number, so reviewers can see which scope the money belongs to. Pending or disputed changes don't belong on the application at all; billing them is the fastest way to get the whole pay app sent back.
Keep a log of each change order with its status, approved amount and the date the GC signed it. If extra work was done on a verbal direction, get the field ticket signed the same day so the change order can be priced and approved before the billing cutoff.
Lien waivers that travel with the pay app
Most GCs require a conditional progress waiver with each application, covering the amount being billed, and an unconditional progress waiver for the previous payment once it has cleared. Many also require waivers from your own suppliers and lower-tier subs. Several states mandate statutory waiver forms; where they do, use the exact form.
Never sign an unconditional waiver for money you haven't received. Track which waivers each GC requires, which have been sent and which are still owed by your suppliers, because a missing supplier waiver can hold your entire payment.
Why pay apps get sent back
Change orders billed before they were approved. Percent complete that doesn't match what the superintendent sees. Stored materials billed without an invoice, bill of lading or proof of insurance for off-site storage. Retainage calculated on the wrong base or at the wrong rate after a reduction. A line that exceeds its scheduled value. Math that doesn't tie between the G703 total and G702 line 4. A missing or wrong lien waiver, such as an unconditional waiver sent before payment. Late submission after the GC's cutoff date.
Most of these are caught by checking the continuation sheet against the field and the contract before submission, not by better forms.
AIA billing software compared
From each vendor's own website, checked November 14, 2026. “Not stated” means the pages we read don't say. Textura's website could not be read and is not included.
| Software | Who it's for | G702 and G703 | Retainage and waivers | Published price |
|---|---|---|---|---|
| Siteline | Subcontractors billing GCs | G-702, G-703 and custom pay app forms | Retention adjusted for the pay app, each line or periods; lien waivers | Custom quote; unlimited users |
| Knowify | Trade contractors | G702/G703 pay apps; official AIA forms through AIA Contract Documents when clients require them | Retainage tracked by phase | From $99 a month |
| GCPay | GCs requiring subs to submit; subs submit | Built-in official AIA G702/G703 forms | Conditional lien waivers exchanged with the pay app | Custom; based on subcontracted volume |
| Trimble Pay | GCs collecting from subs | Collects AIA pay apps from subcontractors | Not stated | Free for subs a GC invites |
| Payapps | Contractors in Australia, New Zealand, the UK and Ireland | Progress claims | Retention listed as a feature | Subs from A$65 a claim or A$49 a month |
| Foundation | Contractors using its accounting suite | Not stated on pages read | Progress billing and retainage in accounting | Custom |
| Buildalytic | Subs billing many GCs, and GCs tracking lower-tier pay apps | Reads G702 and G703 pay apps and tracks each one's status across GCs | Retainage tracked per project and period; conditional and unconditional waivers; follow-up by call and text | Quoted with the finance platform |
The GC portal problem
A subcontractor working for ten general contractors may bill through several portals, each with its own login, cutoff date, waiver form and backup checklist. Siteline lists Textura, GCPay and Procore Pay among the GC portals it integrates with. Trimble Pay is free for subcontractors invited by a GC. Before choosing software, list your GCs, the portal each requires and the share of your billing each represents.
The work that portals don't do is chasing: finding out which application is stuck, why, and who has to act. Buildalytic tracks every pay application across GCs and has Brody follow up on the missing waiver, the unsigned change order or the overdue payment.
One billing month across eight GCs
Illustrative status on the 27th for a mechanical subcontractor. GC names are placeholders.
| GC | How it's billed | Cutoff | Status | What's holding it |
|---|---|---|---|---|
| GC A | Textura | 20th | Approved | Nothing; payment expected next cycle |
| GC B | GCPay | 25th | Submitted | Awaiting architect review |
| GC C | Procore Pay | 25th | Returned | Change order 7 billed before approval |
| GC D | Email with official AIA forms | 25th | Submitted | Supplier waiver from pipe supplier missing |
| GC E | Trimble Pay | 20th | Approved | Retainage reduction not applied by GC; query sent |
| GC F | Email PDF | 30th | Draft | Percent complete under review with superintendent |
| GC G | GCPay | 25th | Paid | Unconditional waiver for last month due |
| GC H | Owner's portal via GC | 15th | Late | Missed cutoff; rolls to next month |
What a slow pay app costs
A pay application that misses a cutoff often waits a full billing cycle. On an illustrative $120,000 monthly billing, a 30-day delay at an 8 percent cost of money is about $789 in carrying cost for that one application, before any line-of-credit fees or the time spent chasing it. Across eight GCs, two or three late or returned applications a month adds up quickly, which is why tracking status matters as much as preparing the form.
Do you need official AIA forms?
AIA Contract Documents sells the official G702 and G703 documents; its own guidance says purchasing through AIA Contract Documents is the only way to get verified official language, and that samples are not for finalization and certification. Some GCs accept a form that reproduces the same lines; others require the official documents. Knowify and GCPay describe access to official AIA forms; Siteline's site notes that users who want AIA forms must have or secure them.
Ask each GC what it accepts before paying for official forms you may not need.
Retainage: the money most subs leave too long
Retainage is often 5 to 10 percent of every payment, held until the end of the job, and it can be a large share of a subcontractor's profit. Track it by contract and period, note any reduction milestones in the contract, and start collecting closeout documents early, because final retainage usually waits on them.
Our retainage tracking spreadsheet and lien waiver software guides cover the release process in detail.
How to choose
If most of your billing goes through one GC's portal, start there. If you bill many GCs on different forms, a subcontractor-side billing tool such as Siteline or Knowify saves the most time. If your problem is pay apps stuck in review, waivers going back and forth and payments arriving late, add follow-up. Test with last month's hardest pay application: one with a change order, stored materials and a retainage reduction.
Getting set up in one billing cycle
Load each active contract's schedule of values, change orders and retainage terms. Enter last month's billed amounts so the D column starts correctly. Add each GC's waiver form, cutoff date and backup requirements. Run the next pay application in parallel with your current process, compare every line, then switch.
Common questions
What is the best AIA billing software for subcontractors?
Siteline is built for subs billing many GCs, Knowify publishes a price from $99 a month, and GCPay and Trimble Pay are GC portals subs are invited into. Buildalytic tracks each pay app's status across GCs and follows up on what is holding payment.
What is the difference between G702 and G703?
G702 is the Application and Certificate for Payment, the one-page summary. G703 is the Continuation Sheet, which lists each schedule of values line with work completed, stored materials and retainage.
How is retainage calculated on a G702?
As a percentage of completed work and of stored materials, shown on line 5, then subtracted from total completed and stored to give total earned less retainage on line 6.
Are stored materials included in percent complete?
Yes. G703 column G adds work completed and materials presently stored, and percent complete is G divided by the scheduled value.
Do I have to buy official AIA documents?
Only if your GC or owner requires them. AIA Contract Documents sells the official forms; some software includes them through a partnership.
Sources and editorial notes
- Siteline: AIA billing software (checked November 14, 2026)
- Siteline: pricing (checked November 14, 2026)
- Knowify: AIA billing (checked November 14, 2026)
- GCPay: AIA forms for subcontractor pay applications (checked November 14, 2026)
- Trimble Pay (checked November 14, 2026)
- Payapps: pricing (checked November 14, 2026)
- AIA Contract Documents: samples vs the real thing
- Buildalytic: payment intelligence for subcontractors
Prepared with AI assistance. Reference date: 2026-11-14. Worked examples are illustrative and are not customer results. Product details can change; confirm the current scope and terms before rollout.
How we prepare and update field notesSee every pay app, across every GC.
Bring your open pay applications. See where each one sits, what is holding it and how Brody follows up.
Start with the call, text or record your team already handles. Review the expected outcome and the human handoff before choosing a rollout.
See pay app tracking Explore the relevant capability