To annualize a fringe benefit under Davis-Bacon, divide the total yearly cost of the benefit by every hour the worker worked that year, on both Davis-Bacon and private jobs. The result is the hourly credit you can take against the fringe rate on the wage determination; pay any shortfall in cash. Defined contribution pension plans with immediate participation and vesting are excepted. Buildalytic checks the fringe credit on each certified payroll before it's filed.
What to take away
- Annualized credit = yearly plan cost ÷ all hours worked, Davis-Bacon and private.
- Dividing by Davis-Bacon hours only overstates the credit and underpays workers.
- Defined contribution pension plans with immediate participation and vesting within 500 hours are excepted.
- Fringe is owed on every hour worked, but overtime premium is figured on the basic rate, not the fringe.
What annualization means
A Davis-Bacon wage determination sets two numbers for each classification: a basic hourly rate and a fringe benefit rate. A contractor can meet the fringe part with cash, with contributions to bona fide benefit plans, or with a mix of both.
When you pay for a plan, such as health insurance, you can take credit for it against the fringe rate, but only at the plan's effective hourly rate across all the hours the worker works. That is annualization. Since the 2023 rule, 29 CFR 5.25(c) says it directly: contractors must annualize contributions to find the hourly equivalent they can credit.
Sources: eCFR: 29 CFR 5.25, rate of contribution or cost for fringe benefits
The formula
Divide the total cost of the fringe benefit contribution for the period by the total hours the worker worked in that period, on both private work and Davis-Bacon covered work. The period is normally the year, or the shorter time period the cost covers. If the contribution varies by worker, figure the credit separately for each worker.
Annualized hourly credit = plan cost for the period ÷ all hours worked in the period.
Sources: eCFR: 29 CFR 5.25, rate of contribution or cost for fringe benefits
Worked example 1: health insurance for a worker who splits time
Illustrative wage determination: electrician, $40.00 basic rate, $20.00 fringe. The contractor pays $1,000 a month for the worker's health plan, $12,000 a year. The worker works 2,000 hours in the year: 1,200 on Davis-Bacon jobs and 800 on private jobs.
| Method | Calculation | Hourly credit | Result |
|---|---|---|---|
| Correct: annualized | $12,000 ÷ 2,000 hours | $6.00 | Credit $6.00; pay the remaining $14.00 in cash or other plans |
| Wrong: Davis-Bacon hours only | $12,000 ÷ 1,200 hours | $10.00 | Overstates the credit by $4.00 an hour, an underpayment of $4,800 across 1,200 hours |
| Wrong: the month's DB hours | $1,000 ÷ 80 DB hours in a slow month | $12.50 | Credit swings month to month and overstates it in slow months |
The defined contribution pension exception
Contributions to defined contribution pension plans, such as many 401(k) style plans, are excepted from annualization without an application, if the plan provides immediate participation and essentially immediate vesting, meaning the benefit vests within the first 500 hours worked, and the other exception criteria are met.
Under those criteria, a benefit must not be continuous in nature, meaning it isn't available without penalty throughout the year, and it must not compensate both private and Davis-Bacon work. For other plans, contractors and plans can ask the Wage and Hour Division for an exception in writing; the rule lists the email and mailing address.
Sources: eCFR: 29 CFR 5.25, rate of contribution or cost for fringe benefits
Worked example 2: health plus a qualifying pension, one week
Same electrician. Health credit is $6.00 an hour (annualized). The contractor also contributes $4.00 for every hour worked to a defined contribution plan that meets the exception, so it credits at $4.00. Total plan credit: $10.00. Remaining fringe owed: $20.00 − $10.00 = $10.00, paid in cash. The worker works 45 hours on the job: 40 straight time and 5 overtime.
| Line | Hours | Rate | Amount |
|---|---|---|---|
| Straight time, basic rate | 40 | $40.00 | $1,600.00 |
| Overtime, 1.5 × basic rate | 5 | $60.00 | $300.00 |
| Cash in lieu of remaining fringe | 45 | $10.00 | $450.00 |
| Gross cash wages | $2,350.00 | ||
| Plan credit taken (health and pension) | 45 | $10.00 | $450.00, paid to plans, not in wages |
Overtime and fringe
Fringe is owed for every hour worked, including overtime hours, but at the straight fringe rate. Overtime premium is figured on the basic hourly rate, not on the fringe. Under 29 CFR 5.32, the contractor's fringe contributions can be left out of the regular rate for overtime as long as that doesn't push the regular rate below the basic hourly rate on the wage determination. In the example, the 5 overtime hours carry $60.00 of wages each plus the same $20.00 of fringe as straight-time hours.
Sources: eCFR: 29 CFR 5.32, overtime payments
Cash in lieu and combinations
29 CFR 5.31 allows any combination: pay the basic rate and contribute the full fringe to plans, pay the basic rate plus the fringe entirely in cash, or mix the two. The rule's own example: a common laborer at $21.93 basic and $6.27 fringe can be paid $28.60 an hour in cash if no plans are provided. Whatever the mix, the total of cash and credited plan contributions must reach the full rate.
Sources: eCFR: 29 CFR 5.31, meeting wage determination obligations
New hires and partial years
The rule allows the annualization period to be the year or a shorter period to which the cost is attributable. For a worker hired in July, use the cost and the hours for the period the plan actually covered, not a full year's hours that were never worked. Document the period you used so a reviewer can follow it.
Sources: eCFR: 29 CFR 5.25, rate of contribution or cost for fringe benefits
Mistakes auditors find
Dividing by covered hours only, as in the example, is the most common. Others: crediting a plan the worker isn't enrolled in; crediting the employee's own payroll deductions as an employer fringe contribution; crediting the same contribution twice across overlapping jobs; using last year's plan cost after premiums rose; and taking a credit for a benefit that isn't one of the bona fide types. Each one shows up as an underpayment when the fringe line on the certified payroll is checked against the plan invoices.
Records to keep
Keep each plan's invoices or contribution statements, the enrollment for each worker, the hours used in the denominator by worker and period, and the calculation itself. On the certified payroll, show the fringe paid to plans and the fringe paid in cash in a way that reconciles to the wage determination. When an agency or prime contractor asks how the credit was figured, the answer should take one page.
For general contractors reviewing subs
Primes are responsible for their subcontractors' compliance. When a sub claims plan credits, ask for the annualization calculation the first time and whenever the credit changes. A credit that jumps from one month to the next, or that equals the full fringe rate exactly, is worth a question before payment.
How Buildalytic helps
Buildalytic checks each certified payroll against the wage determination before it's filed, including base rate, fringe paid in cash, credited plan amounts and overtime. When a subcontractor's fringe credit doesn't reconcile, the exception goes to a reviewer and Brody asks the sub's payroll contact for the plan statement or a corrected payroll.
Common questions
How do you annualize fringe benefits under Davis-Bacon?
Divide the total cost of the benefit for the period by all hours the worker worked in that period, on both Davis-Bacon and private jobs. The result is the hourly credit allowed against the fringe rate.
Are 401(k) contributions annualized?
Contributions to defined contribution pension plans are excepted from annualization if the plan provides immediate participation and vesting within the first 500 hours worked, and meets the rule's other criteria.
Is fringe owed on overtime hours?
Yes, at the straight fringe rate for each hour worked. The overtime premium is figured on the basic hourly rate, not the fringe.
Can I pay the whole fringe in cash?
Yes. 29 CFR 5.31 allows the fringe to be paid entirely in cash, entirely through bona fide plans, or a combination, as long as the total meets the wage determination.
Sources and editorial notes
- eCFR: 29 CFR 5.25, rate of contribution or cost for fringe benefits
- eCFR: 29 CFR 5.31, meeting wage determination obligations
- eCFR: 29 CFR 5.32, overtime payments
- Buildalytic: prevailing wage compliance
Prepared with AI assistance. Reference date: 2026-11-14. Worked examples are illustrative and are not customer results. Product details can change; confirm the current scope and terms before rollout.
How we prepare and update field notesCheck every fringe credit before it's filed.
Bring one certified payroll and the plan statements behind it. See the fringe credit checked against the wage determination.
Start with the call, text or record your team already handles. Review the expected outcome and the human handoff before choosing a rollout.
See prevailing wage checks Explore the relevant capability


