Davis-Bacon vs state prevailing wage: what's the difference, and what to do when both apply

Davis-Bacon is the federal prevailing wage law; many states have their own. How they differ on coverage, rates and certified payroll, with a 10-state comparison and a checklist for jobs covered by both.

By Buildalytic Research Desk6 min read

Editorial scene comparing a federal and a state certified payroll form
Illustrative editorial scene. State rules summarized from each state's agency pages; your contract controls.
The short answer

Davis-Bacon is the federal law that sets prevailing wages on federally funded or assisted construction contracts over $2,000. State prevailing wage laws, sometimes called little Davis-Bacon acts, cover state and local public works with their own thresholds, rates, forms and filing systems. When both apply, plan to meet both: pay the higher rate for each classification and file each required report. Buildalytic checks payroll against the applicable rates and tracks every filing.

What to take away

  • Davis-Bacon covers federally funded or assisted construction contracts over $2,000.
  • State laws cover state and local public works, with thresholds from none to $250,000.
  • Federal and state filings are usually separate; a WH-347 doesn't automatically satisfy a state.
  • On jobs covered by both, check both rate schedules and pay the higher rate for each classification.

The short version

Davis-Bacon applies because of federal money. State prevailing wage laws apply because of state or local public money, and sometimes other public support. A highway job with federal aid may be covered by Davis-Bacon and the state law at once; a city library paid entirely with local funds may be covered only by the state law; a private office building is usually covered by neither.

The differences that matter day to day are the rates you pay, who sets them, and where and how often you file certified payroll.

How Davis-Bacon works

The Davis-Bacon Act requires contractors and subcontractors on federal construction contracts over $2,000 to pay laborers and mechanics no less than the locally prevailing wages and fringe benefits set by the U.S. Department of Labor. The Davis-Bacon Related Acts extend the same requirements to many federally assisted programs, such as highways, housing and water infrastructure.

Rates come from the wage determination in the contract. Contractors submit weekly certified payroll to the contracting or sponsoring agency; the WH-347 is the optional federal form. Fringe can be paid in cash, through bona fide plans, or both.

Sources: U.S. Department of Labor: Davis-Bacon and Related Acts; Buildalytic: federal certified payroll and WH-347

How state laws differ

State laws vary on almost every point. Some have no dollar threshold at all, such as Washington and Massachusetts; others start at $25,000 (Pennsylvania) or $250,000 (Maryland). Some states run their own online filing systems, such as Washington's PWIA, New York's MPWR portal, Illinois's certified transcript portal and New Jersey's Wage Hub. Texas has no state agency at all: each public body sets the rates and the reporting rules in its contract.

Rates are set differently too. Some states base them on collective bargaining agreements, some survey wages, and some let the public body use the federal Davis-Bacon rates.

Federal and 10 states side by side

Summarized from each agency's published rules and our state guides. Thresholds and filing rules change; follow the contract and the agency.

Federal and 10 states side by side
LawCoverage basicsCertified payroll
Federal Davis-BaconFederally funded or assisted construction over $2,000Weekly certified payroll to the contracting agency (WH-347 or equivalent)
CaliforniaPublic works paid with public funds, per the Labor CodeElectronic certified payroll to DIR
OregonCovered public worksWeekly records, submitted at least monthly to the public agency with the WH-38 statement; WH-347 alone doesn't satisfy
WashingtonAny public funds, no minimum dollar amountWeekly payroll filed online in L&I's PWIA at least monthly; Intent and Affidavit
MarylandContracts of $250,000 or more meeting the funding testsElectronic, within 14 calendar days after each payroll period
IllinoisPublic works by a public body or with public fundsMonthly, by the 15th, in IDOL's portal
New YorkArticle 8 public workElectronic to NYS DOL every 30 days (NYC uses its own system)
New Jersey$19,375 for municipal contracts; $2,000 for other public bodiesWithin 10 days of payday, to the public body and the NJ Wage Hub
TexasPublic works paid with public funds (Gov. Code ch. 2258)Set by each public body's contract; no state form
PennsylvaniaProjects over $25,000Weekly to the public body on form LLC-25
MassachusettsPublic construction, no dollar thresholdWeekly to the awarding authority; statement of compliance within 15 days of finishing

Sources: Buildalytic: Federal Davis-Bacon certified payroll guide; Buildalytic: California certified payroll guide; Buildalytic: Oregon certified payroll guide; Buildalytic: Washington certified payroll guide; Buildalytic: Maryland certified payroll guide; Buildalytic: Illinois certified payroll guide; Buildalytic: New York certified payroll guide; Buildalytic: New Jersey certified payroll guide; Buildalytic: Texas certified payroll guide; Buildalytic: Pennsylvania certified payroll guide; Buildalytic: Massachusetts certified payroll guide

When both apply

On a project covered by both laws, you are bound by both. Get both rate schedules, compare them classification by classification, and pay the higher rate for each, including fringe. Then file each required report in its own format: Oregon's BOLI, for example, says the federal WH-347 alone doesn't satisfy Oregon's filing requirements. Maryland, on the other hand, says work on a Davis-Bacon project isn't reported to the State. Confirm the rule for your state with the agency and the contract.

Keep the two rate schedules attached to the project, note which one set each worker's rate, and keep evidence of every submission.

Worked example: a federally assisted job in Washington

Illustrative rates for one classification. Pay the higher basic rate and the higher fringe, and confirm the comparison method with the agency.

Worked example: a federally assisted job in Washington
ItemFederal wage determinationState rateWhat to pay
Electrician basic rate$48.20$50.10$50.10
Electrician fringe$21.40$20.75$21.40
Certified payrollWeekly to the federal-aid agency per the contractMonthly in PWIA, plus Intent and AffidavitFile both

Common mistakes on dual-coverage jobs

Paying the federal rate because the job is "federal" when the state rate is higher. Filing one report and assuming it covers the other. Using a rate schedule dated for the wrong bid or award date. Classifying workers by title instead of by the work they did. Missing subcontractor filings, which are the prime's problem too on most jobs.

How to tell which law applies

Start with the funding. Ask the owner or agency which funds are in the project and whether the contract includes a federal wage determination, a state rate schedule, or both. Read the special provisions. If you are a subcontractor, ask the prime for the wage determinations and reporting instructions before you mobilize, not when the first payroll is due.

For general contractors collecting from subs

On dual-coverage jobs, every tier has two sets of obligations. Track each sub's filings for both laws separately, and check the rates on their payrolls against both schedules. A missing week on either side can hold your payment.

How Buildalytic helps

Buildalytic checks certified payroll against the federal wage determination and the state schedule that apply to the project, flags rates below either one, and tracks each subcontractor's filings for federal and state reporting. Brody follows up with the sub's payroll contact on missing weeks and corrections.

Common questions

What is the difference between Davis-Bacon and prevailing wage?

Davis-Bacon is the federal prevailing wage law for federally funded or assisted construction over $2,000. State prevailing wage laws cover state and local public works with their own rates, thresholds and filing rules.

What is a little Davis-Bacon act?

A common name for a state prevailing wage law modeled on the federal Davis-Bacon Act.

If a job is covered by both, which rate do I pay?

Plan to meet both: compare the federal and state schedules and pay the higher rate for each classification, and file each required report. Confirm with the contract and the state agency.

Does a WH-347 satisfy state certified payroll?

Not automatically. Oregon, for example, says the WH-347 alone doesn't satisfy its filing requirements. Check each state's format and filing system.

Sources and editorial notes

Prepared with AI assistance. Reference date: 2026-11-13. Worked examples are illustrative and are not customer results. Product details can change; confirm the current scope and terms before rollout.

How we prepare and update field notes
See it on your workflow

Check payroll against every rate that applies.

Bring a job covered by federal and state prevailing wage. See both schedules checked and every filing tracked.

Start with the call, text or record your team already handles. Review the expected outcome and the human handoff before choosing a rollout.

See certified payroll Explore the relevant capability