Field operations
The challenge
Foremen filled out daily reports in an app at the end of long days, and many reports arrived late or with missing manpower and delay details.
Project managers spent mornings chasing reports instead of running jobs.
The solution
Brody replaced the end-of-day app form with a short phone call each foreman takes on the way home, in their own language.
A call at the end of the shift
Brody calls each foreman at the time they choose, in English, Spanish or another language.
The template, asked naturally
Manpower, work completed, delays, deliveries and safety, with follow-up questions when something is missing.
Photos by text
Foremen text photos to the same number and they attach to the report.
Filed to the right job
The finished report goes to the project record and the PM, the same day.
“Our foremen call in on the drive home, and the report is filed before they get there. Project managers start the morning with complete reports instead of chasing them.”
The results
Same-day daily reports rose from 55% to 97%, and the time each foreman spends on a report fell from 25 minutes to 7.
Reports missing manpower or delay details dropped from one in three to one in 25, and the company now collects reports on 14 jobs instead of 6.
| Measure | Before | With Brody |
|---|---|---|
| Daily reports filed the same day | 55% | 97% |
| Minutes per report for a foreman | 25 | 7 |
| Reports missing manpower or delays | 1 in 3 | 1 in 25 |
| Jobs filing daily reports | 6 | 14 |
How it was measured. Before and after Brody, from report timestamps in the project record. Workflows used: Daily field reports.
