Preconstruction
The challenge
The estimating team sent invitations by hand from a spreadsheet of trades, then spent the last two days before each due date calling to see who was actually bidding.
Gaps in coverage often surfaced the night before bid day, when it was too late to find another trade.
The solution
The team now sends each bid package through Brody, which runs invitations, reminders and coverage tracking from the same trade list the estimators already kept.
Invites go out by trade and area
Brody sends each package to the right trades with the plans link, scope notes and due date.
Reminders before the deadline
Trades who have not answered get a reminder by text or email on the schedule the team sets.
Coverage tracked by scope
Every reply is matched to its scope, so open scopes are visible days before bids are due.
Gaps flagged early
The estimator is told which scopes still need bids, with enough time to invite more trades.
“Bid coverage used to depend on how many calls our estimators could make in the last two days. Now every scope is tracked from the day the invitation goes out, and we walk into bid day knowing exactly where we stand.”
The results
Fully covered bid packages rose from 62% to 94%, and bids per scope went from 1.9 to 3.4, so the team compares real options on every scope.
Estimators now spend about 3 hours per bid on follow-up instead of 14, and uncovered scopes surface days before the due date rather than on bid day.
| Measure | Before | With Brody |
|---|---|---|
| Packages fully covered by the due date | 62% | 94% |
| Bids received per scope | 1.9 | 3.4 |
| Estimator time per bid on follow-up | 14 hrs | 3 hrs |
| Scopes found uncovered on bid day | 4 per bid | 0 to 1 |
How it was measured. Before and after Brody, from the estimating team’s bid logs. Workflows used: Bid solicitation.