Free templates
Free construction templates and checklists.
136 worksheets for payroll, billing, closeout, procurement, bids and the field. Each one downloads as a blank CSV and comes with a guide and a worked example.
No sign-up. Download and use.
Construction daily report template: completed example and blank form
Download a free blank daily report CSV and follow a completed fictional example covering work, crew observations, deliveries, photos, open questions and review.
AI receptionist evaluation checklist
Test an AI receptionist with real caller situations, written acceptance criteria and a blank vendor scorecard before trusting it with your company number.
Material returns and supplier credits
Track return authorization, pickup, supplier receipt, credit memo and posted credit separately. Includes a worked $1,500 return and a free blank reconciliation CSV.
Retainage tracking spreadsheet
Use a free blank retainage CSV and a fictional three-job example to separate held balance, release readiness, submitted requests and verified collection.
Overdue RFIs
Prioritize overdue RFIs using confirmed field dependencies, current decision owners and reviewed responses. Includes a two-RFI example and free blank decision-log CSV.
Solar PTO backlogs
Organize the post-installation PTO queue with source-linked requirements, responsible owners and verified utility status. Includes a fictional blocker example and free CSV.
Subcontractor start-readiness checklist
Confirm the current work package, crew, access, material and prerequisite status before the planned start. Includes a fictional Monday-start example and free CSV.
Homeowner progress update template
Use a completed weekly homeowner update, adaptable message template and free planning CSV. Separate confirmed work, booked inspections, owner decisions and uncertain dates.
MEP prefab tracking
Track assembly revisions, kit contents, shipment, receipt and field exceptions. Includes a worked revision-mismatch example and a free blank handoff CSV.
As-built drawings at closeout
Collect the required drawing files, field-change sources and review records. Includes a worked utility-package example and free as-built receipt checklist CSV.
What goes in a construction closeout binder? A worked turnover package
Build a navigable turnover package with a system index, accepted versions and open exceptions. Includes a fictional binder example and a free blank index CSV.
Construction material receiving checklist
Record counted receipts, usable quantities, damage and open supplier actions. Includes a 100-fixture worked example and free blank receiving checklist CSV.
Equipment rental calculator
Compare daily, weekly and 4-week equipment rental rates over the real billable period, see when buying beats renting, and how much a late off-rent call costs, with worked numbers.
Subcontractor bid invitation follow-up
Separate invitations from intent, remove access blockers and record the next action. Includes a ten-invite example, call script and free trade-coverage CSV.
Construction quote follow-up emails
Follow up on submitted construction quotes with messages for review, pending award and declined states. Includes a revision example and free follow-up planner CSV.
Construction bid/no-bid checklist
Screen scope fit, capacity, documents and the decision path before a full estimate. Includes a weighted fictional pursuit example and free qualification worksheet CSV.
Missed calls on a jobsite
Turn missed-call records into assigned requests with confirmed details and next actions. Includes a six-call example, callback script and free blank queue CSV.
After-hours construction calls
Define after-hours intake, on-call routing and fallback without making unsupported promises. Includes a three-call example and free routing-rules worksheet CSV.
Bilingual construction call intake
Test English and Spanish intake with corrections, read-backs and human fallback. Includes a fictional address-and-unit example and free intake-verification CSV.
When a construction AI receptionist should transfer to a person
Which AI receptionists transfer callers to a person, what each says happens when nobody answers (checked November 2026), and how to test a construction handoff.
Turn foreman voice notes into a construction daily report
Map spoken field notes into a reviewed daily report with confirmed dates, headcounts and hours. Includes a worked clarification example and free review worksheet CSV.
Organize construction photos by job, location and work date
Preserve original photos and connect them to the right job, area and work date. Includes a late-upload example, naming pattern and free photo-context checklist CSV.
Construction allowance tracking
Compare selections against the actual allowance basis without counting costs twice. Includes a $5,000 allowance example and free selection-cost worksheet CSV.
Change-order log template
Reconcile change requests without hiding the approval-to-billing handoff. Includes a five-request $42,000 example and free blank COR log CSV.
Schedule of values example
Practice a three-line SOV reconciliation and a stored-to-installed transfer without double counting. Includes original worked tables and a free blank practice CSV.
Commissioning readiness checklist
Track asset-level prerequisites and evidence before the designated readiness review. Includes a fictional pump packet and free readiness-register CSV.
Subcontractor COI follow-up
Separate certificate receipt, supporting-document review and recorded acceptance. Includes a fictional endorsement exception, follow-up message and free internal checklist CSV.
Supplier follow-up emails for construction
Separate status, shipment and arrival in supplier replies. Includes four editable messages, a partial-commitment example and free response-tracker CSV.
Construction payment follow-up emails
Four practical payment follow-up messages, a fictional partial-payment case and a free blank tracker for receipt, review blockers, promised dates and applied cash.
Missing daily reports
Build an expected-report register, ask a precise follow-up question and separate no-work confirmations, missing submissions, review queues and filing failures. Includes a free CSV.
Drawing revision checklist
Follow a drawing revision from source verification to affected takeoffs, submittals, purchase orders and field copies. Includes a fictional change review and a free impact-register CSV.
Crew dispatch by text
Build an assignment record that separates message delivery, explicit crew replies and reconfirmation after changes. Includes a fictional six-worker roster and a free blank CSV.
Construction delivery booking
Coordinate a site delivery without confusing the supplier’s arrival statement with an approved booking. Includes a fictional split-load example and a free blank booking CSV.
Construction waste tickets
Reconcile ticket identities, measured quantities, facility statements and project-specific eligibility. Includes a fictional mixed-stream calculation and a free blank evidence CSV.
Construction closeout documents list
A construction closeout documents list by deliverable type and by trade: what each subcontractor typically owes at turnover, where the spec asks for it and when to request it.
O&M manual requirements in construction
O&M manual checklist for construction closeout: what to include for each building system, why manuals get rejected, and a request to send your subs.
Approved submittal vs. released order
Connect submittal dispositions, quantity checks, purchasing authorization and supplier acknowledgment without treating them as one status. Includes a fictional release case and a free CSV.
Construction tool checkout
Keep tool identity, custody, job transfers and kit components traceable without confusing a record update with a physical handover. Includes a fictional kit example and a free blank CSV.
How to compare subcontractor bids with different exclusions
Preserve quoted prices while making scope gaps and internal comparison adjustments visible. Includes an original two-bid example, a revised quote and a free blank CSV.
Addenda acknowledgment log
Separate distribution, access, explicit acknowledgment and revised pricing for each bidder. Includes a fictional four-bidder review and a free blank acknowledgment CSV.
Punch-list follow-up
Turn a vague punch reminder into an item-specific visit, evidence request and designated review. Includes a fictional five-item roster and a free blank follow-up CSV.
Warranty repairs
Keep request review, homeowner availability, trade confirmation and completed service distinct. Includes a fictional rescheduled appointment and a free blank coordination CSV.
Haul-ticket reconciliation
Reconcile haul records without counting duplicate tickets or mixing payment bases. Includes a fictional three-load calculation, an unresolved pay-item match and a free blank CSV.
Concrete delivery tickets
Match ticket identity, volume, timestamp definitions and charge references before resolving an invoice difference. Includes a fictional clock-basis calculation and a free blank CSV.
Construction warranty letter templates
Three ready-to-adapt construction warranty letter templates: a 1-year contractor workmanship letter, a subcontractor-to-GC letter and a manufacturer warranty cover letter, plus what each must include.
Permit correction responses
Build a comment-by-comment permit correction register with response owners, plan references and submission versions. Includes a fictional review cycle and blank CSV.
Before work is covered
Coordinate location records, photos, inspection requests and open corrections before concealment. Includes a fictional hold-point register and a free blank CSV.
Construction training records
Track course cards, credentials, source-backed renewal dates and reviewer decisions without treating a roster as work clearance. Includes a worked example and blank CSV.
New-home handover checklist
Coordinate keys, manuals, demonstrations, warranty documents and open items with clear owners and delivery records. Includes a fictional handover roster and blank CSV.
Firestop documentation checklist
Organize firestop location records, current system references, installer evidence and open review comments. Includes a fictional document register and blank CSV.
SWPPP corrective-action tracking
Track stormwater findings with source-backed timing, responsible owners, correction evidence and required sign-off. Includes a fictional action register and blank CSV.
Roofing supplement documentation
Build a factual roofing estimate comparison with original evidence, traceable quantities and open review questions. Includes fictional line-item arithmetic and a blank CSV.
Extract closeout requirements from specifications into a source-linked register
Turn project specification clauses into traceable closeout requests with owners, formats, timing sources and review questions. Includes a fictional extraction example and blank CSV.
Match construction invoices to purchase orders and delivery receipts without hiding exceptions
Separate price, quantity, receipt and duplicate-document questions before invoice review. Includes a fictional three-way comparison and a free blank CSV.
Build a construction historical cost database with comparable, source-backed records
Organize your own project costs by scope, quantity, unit, date and review state before reusing them in estimates. Includes a fictional weighted-rate example and blank CSV.
Compare actual labor productivity with the estimate using the same scope and units
Align reported quantities, labor hours and estimate assumptions before calculating productivity. Includes earned-hours arithmetic, a fictional comparison and blank CSV.
Owner-representative daily reports
Create an owner-side daily record that distinguishes direct observations from contractor statements and document references. Includes a fictional evidence roster and blank CSV.
Construction timesheet cost-code errors
Resolve project and cost-code questions with original entries, source-backed corrections and a clear payroll handoff. Includes a fictional hours reconciliation and blank CSV.
Homeowner selection deadlines
Plan selection follow-up from source-backed purchasing and delivery assumptions. Includes a fictional calendar-day example, version changes and a blank CSV.
Solar interconnection application checklist
Coordinate application records, authorized documents and technical-review handoffs for the actual utility process. Includes a fictional packet roster and blank CSV.
Closeout documents and retainage
Connect missing closeout records to the actual payment-review process. Includes a fictional blocker register, a request sequence and a free blank CSV.
Does a signed T&M ticket approve a change order?
Separate field acknowledgment, work direction, pricing and formal change approval. Includes a fictional decision map and a free blank ticket-to-change CSV.
Change-order markup calculation
Reproduce a change-order total with explicit cost bases, credits, simple and compounded markups, and rounding. Includes worked calculations and a blank CSV.
Stored-materials billing
Organize eligibility, location, quantity, value and review records for stored materials. Includes a fictional storage-to-installation reconciliation and a blank CSV.
Collect lower-tier lien waivers without losing the document trail
Build a source-linked lower-tier roster, route the correct document request and reconcile exceptions with accounting. Includes a fictional collection example and blank CSV.
Backcharge documentation
Organize the condition record, contract questions, communications, corrective-work evidence and proposed costs. Includes a fictional calculation and blank CSV.
Underground utility as-builts
Coordinate field records, survey-source metadata, photos and reviewed deliverables before utility work is concealed. Includes a fictional evidence roster and blank CSV.
Rental equipment damage disputes
Connect unit identity, delivery and return records, photos and proposed repair charges. Includes a fictional chronology, cost comparison and blank CSV.
Home-builder warranty requests
Organize homeowner reports, review, trade assignments, appointments and completion evidence. Includes a fictional four-request queue and a free blank CSV.
Construction staking revision control
Track issued plans, derived point files, release decisions and field confirmations without losing prior versions. Includes a fictional revision handoff and blank CSV.
Earthwork quantity changes
Compare earthwork quantities on a consistent scope and measurement basis before pricing a proposed difference. Includes a worked example and blank CSV.
Rental credits promised but not applied
Track a rental adjustment from the vendor response to the credit memo and invoice application. Includes a reconciled fictional example and free blank CSV.
Off-rent confirmation template
Connect the rental unit, pickup request, vendor acknowledgment, collection record and invoice review. Includes reusable request wording, a fictional timeline and blank CSV.
Temporary jobsite service cancellation checklist
Coordinate fencing, storage, sanitation and utility-service changes with the right vendor and project owner. Includes a fictional demobilization register and blank CSV.
A change-notice tracking workflow for construction teams
Connect potential change events to reviewed notice requirements, approvals, sending records and later actions. Includes a fictional four-state register and blank CSV.
Apprentice document tracking
Organize apprentice-related document requests by purpose, source, period and reviewer. Includes a fictional four-record example and a privacy-conscious blank CSV.
JHA corrective actions
Connect JHA findings to assigned actions, implementation records and designated verification. Includes a fictional four-action queue and a free blank CSV.
Change order rejected for missing documentation
Identify the exact return reason, collect the missing source and issue a traceable revision. Includes a corrected-credit calculation and a free blank CSV.
Damage by others
Record the condition, coverage and source at a construction trade handoff. Separate observations from responsibility, with a fictional example and blank CSV.
As-staked report template
Organize an as-staked report index around the design source, field job, stored records and review questions. Includes a fictional example and free blank CSV.
California eCPR corrections
Organize California eCPR corrections with linked originals, replacement payrolls and receipts. Includes a worked case and correction-register CSV.
Construction AI ROI calculator
Calculate construction AI costs, recovered staff capacity and demonstrated cash savings separately. Includes a worked business case and ROI worksheet CSV.
Backordered construction materials
Use Brody to check backorders, collect supplier alternatives and route the evidence for review. Includes a call script, worked case and tracking CSV.
Certified-payroll software vs. payroll processing
Test certified-payroll software using source records, exceptions and correction handoffs. Includes a vendor acceptance checklist and blank CSV.
Construction CRM vs. project management software
Compare construction CRM and project-management needs across intake, estimating and project handoff. Includes a worked case and lifecycle-mapping CSV.
Contractor complaint calls
Use Brody to capture contractor complaint calls, confirm the concern and assign the response. Includes a sample conversation and complaint-routing CSV.
Construction meeting action log
Turn construction meeting minutes into assigned actions, follow-up and documented closure with Buildalytic. Includes a worked example and action-log CSV.
Construction invoice approval matrix
Define invoice review roles, field confirmations and payment-approval handoffs with Buildalytic. Includes an exception example and approval-matrix CSV.
Equipment-breakdown call intake
Use Brody to capture equipment-breakdown reports and follow up on service commitments. Includes a call script, worked case and service-intake CSV.
DAS 140 vs. DAS 142
Compare California DAS 140 notices and DAS 142 dispatch requests. Track recipients, responses and evidence with a worked example and blank register.
Construction lead intake form
Capture construction enquiries, collect missing scope details and assign the estimating handoff with Brody. Includes intake questions and a blank CSV.
Construction inspection confirmation calls
Confirm inspection bookings, arrival windows and open prerequisites with Brody. Includes a sample call, booking example and confirmation-log CSV.
One worker, two classifications
Review workers with multiple classifications by connecting daily work, time records and payroll exceptions. Includes a reconciliation example and CSV.
Write a construction RFI from field photos
Turn field photos into one answerable construction RFI with location, source revision and a review owner. Includes a worked question and preparation CSV.
Construction first-day logistics calls
Use Brody to confirm a new hire's reporting location, arrival details and open questions. Includes a first-day call script and onboarding-logistics CSV.
WH-38 vs WH-347
Oregon WH-38 vs federal WH-347: which form BOLI requires, when one job needs both, and a worked weekly handoff so neither filing is missed.
Construction shared inbox
Keep project email, calls and messages connected to an owner and next action with Buildalytic. Includes an absent-owner example and routing-log CSV.
Construction schedule-change call tree
Use Brody to communicate approved schedule changes, collect acknowledgements and surface conflicts. Includes a call script and confirmation-tree CSV.
Prevailing-wage fringe reconciliation
Separate cash wages, fringe credit and supporting records in a prevailing-wage review. Includes a worked reconciliation and blank exception-register CSV.
Construction submittal review checklist
Prepare a reviewable submittal package with selected items, source requirements and open questions. Includes a worked review checklist and blank CSV.
Subcontractor prequalification refresh calls
Use Brody to refresh subcontractor contacts and request current qualification documents. Includes a sample call and prequalification-follow-up CSV.
Subcontractor certified-payroll exceptions
Track missing subcontractor payrolls, evidence requests, corrections and reviewer decisions by employer and week. Includes a worked register and CSV.
Contractor site-visit scheduling
Coordinate contractor site visits with confirmed contacts, access details and an estimating handoff through Brody. Includes an appointment checklist CSV.
Construction voice shift handover
Use Brody to collect shift updates, transfer open questions and confirm the next supervisor's handoff. Includes a sample conversation and handover CSV.
Submittal register and schedule
Work backward from the field need date to plan submittal preparation, review and procurement. Includes a schedule calculation and blank register CSV.
Contractor speed to lead
Measure contractor enquiry response and handoff quality before buying more leads. Includes a worked callback example and response-tracking CSV.
Construction weather-hold calls
Use Brody to relay authorized weather-hold messages and collect crew acknowledgements. Includes a sample call and weather-notification tracking CSV.
Two-week lookahead constraint log
Connect two-week lookahead activities to readiness constraints, owners and follow-up with Buildalytic. Includes a worked example and constraint-log CSV.
Procore–SharePoint document handoff
Plan Procore and SharePoint document handoffs around source revisions, permissions and destination receipts. Includes failure cases and a handoff CSV.
Construction workforce availability calls
Use Brody to collect source-dated workforce availability before crew planning. Includes a phone-survey script, worked example and availability-log CSV.
Construction payment audit checklist for owners
An owner-side construction payment audit checklist with source documents, reconciliation steps, a worked example and clear exception outcomes.
Change-order audit procedure
A practical change-order audit procedure for owners: establish the scope baseline, test pricing, verify authority and document the final disposition.
Approved change orders not billed
Find approved change orders omitted from billing with a cumulative reconciliation, revision control and a worked partial-billing example.
Duplicate construction payments
Detect possible duplicate construction payments without confusing cumulative applications, partial settlements and valid repeated invoices.
Change-order approval authority
Verify construction change-order approval authority by role, limit, date and version, with an example of cumulative delegation limits.
Cost-plus construction audit
Review cost-plus construction charges against the agreement's reimbursable-cost definitions, exclusions, credits and fee basis.
GMP contingency reconciliation
Reconcile GMP contingency openings, authorized transfers, charges, reversals and closing balances without confusing budget movement with payment.
Construction allowance reconciliation
An owner-side construction allowance reconciliation with scope boundaries, an illustrative credit calculation and closeout evidence.
Change-order labor burden audit
Audit change-order labor burden by separating base wages, included burdens, premiums and markup, with a worked overlap example.
Audit equipment rates in change orders
Review equipment charges inside construction change orders using the contract rate basis, utilization evidence and overlap checks.
Material credits in change orders
Audit material credits inside change orders by tracing deleted scope, returned quantities, substitution values and the final billing adjustment.
Progress-payment overbilling review
An owner-side progress-payment overbilling review with cumulative arithmetic, evidence tests and a clear distinction between unsupported value and loss.
Stored materials double billing
Prevent stored-material value from being counted twice when construction materials move from storage to installed work.
Contract-to-pay reconciliation
Reconcile a construction contract to commitments, payment certificates, credits and cash without forcing unlike balances to match.
Construction audit data request list
A construction audit data request list covering contracts, changes, payment records and source-quality checks for an owner-side diagnostic.
Construction payment audit sampling
Design construction payment audit sampling with a reconciled population, risk selections, clean controls and honest coverage reporting.
Construction payment exception register
A construction payment exception register that separates candidate findings, evidence gaps, approved adjustments and settled financial outcomes.
Construction payment audit ROI
Calculate construction payment audit ROI using confirmed financial outcomes, measured review time and all delivery costs, without counting flags as savings.
Capital-project portfolio controls
Design recurring capital-project portfolio payment controls with contract-specific rules, a common exception register and measured review coverage.
Construction payment assurance pilot
Design a fixed-fee construction payment assurance diagnostic with lawful records access, a representative test set and independent acceptance criteria.
Construction AR aging report
Build a construction AR aging report that separates overdue cash, disputes and retainage. Includes a worked example, weekly collections agenda and blank CSV.
Construction collections
Turn “the check is coming” into a dated construction payment commitment. Includes call questions, a missed-promise workflow, worked example and blank CSV.
Construction payment disputes
Separate disputed construction charges from the remaining invoice balance. Includes a worked allocation, evidence checklist, partial-payment workflow and blank CSV.
GC not paid by the owner? A subcontractor collections workflow
What to ask when a GC says the owner has not paid. Trace pay-app status, separate contract review from follow-up and assess new exposure with a blank CSV.
Construction retainage collection
Build a retainage collection queue around release eligibility, approval and cash receipt. Includes a worked recovery example, outreach wording and blank CSV.
Construction AR collections software
Evaluate construction AR collections software with real pay apps, disputes, retainage and partial payments. Includes a pilot scorecard and blank CSV.
Are the templates free?
Yes. Every template downloads as a blank CSV with no sign-up. Open it in Excel, Google Sheets or Numbers.
Is there a guide for each template?
Yes. Each template comes with an article that explains every column, a worked example and how to use it on a job.
Can I use these with Procore or my ERP?
The CSVs are plain columns, so you can import them into most tools. Buildalytic can also fill and follow up on many of them for you.
Stop chasing the spreadsheet.
Buildalytic keeps these logs current for you: Brody calls and texts subs, suppliers and crews for the missing item and files the answer to the job.
One full Platform plan. No standard setup fee. Start with one supported workflow.
Plan your rollout
Pricing, security reviews, procurement and rollout across your projects and regions.
