Free for contractors on public work
Send one week of payroll. Get every problem flagged, free.
Send us one week of certified payroll from your subcontractors and the wage determination. We check every worker against the rates and return an exception report: what is wrong, why, and what it costs, before an agency or auditor finds it.
- Every worker checked for base rate, fringe, overtime, classification and apprentices
- Each finding shows the source rate and the dollar amount
- Report back within 3 business days, no cost and no obligation
Rather talk it through? Book a demo instead.
What you get back
A report like this, for your job.
Every flagged line names the subcontractor, the payroll week, the issue and the result, so your reviewer knows exactly what to ask for.
| Subcontractor | Payroll | What was flagged | Result |
|---|---|---|---|
| Ridgeline Electric | Week 6 | Electrician paid $46.10 base; determination is $48.20 | Short $84.00 for 40 hours |
| Valley Concrete | Week 6 | Fringe credit $9.50/hr from a health plan, not annualized | Credit should be $6.00/hr |
| Summit Drywall | Week 5 | Payroll not received | Brody called and texted the payroll contact twice |
| Summit Drywall | Week 6 | Three apprentices for one journeyworker; ratio is 1:1 | Two paid the journeyworker rate |
| Northside Mechanical | Week 6 | Worker classified as laborer, daily report shows pipefitting | Ask for split classification hours |
Sample with illustrative subcontractors and rates.
What we check
Six checks on every worker.
| Classification | The classification on the payroll matches the work described for that worker. |
| Base rate | Each hour is paid at least the basic hourly rate on the wage determination. |
| Fringe | Fringe is paid in cash or to bona fide plans, and plan credits look annualized. |
| Overtime | Hours over 40 are paid at time and a half of the basic rate. |
| Apprentices | Apprentice rates are used only for registered apprentices within the ratio. |
| Completeness | Missing weeks, missing workers, missing signatures and math that does not tie. |
How it works
Three steps, about three business days.
- RequestFill in the form. It takes a minute.
- Send filesWe email you a secure link for one week of payroll and the wage determination.
- Get the reportYour exception report arrives within 3 business days, with each finding explained.
Want the checks yourself first? Try the free prevailing wage calculator, the fringe annualization calculator or the state payroll guides.
Is the exception report really free?
Yes. One week of payroll for one project, reviewed and returned at no cost and with no obligation to buy anything.
What do I need to send?
One week of certified payroll for the subcontractors on one public works job (WH-347, a state form or your payroll export), plus the wage determination or rate sheet in the contract. After you request the report, we email you a secure way to send them.
How long does it take?
We email you within one business day to collect the files, and you get the report back within 3 business days of receiving them.
Which states does it cover?
Federal Davis-Bacon jobs in every state, plus state prevailing wage jobs. Tell us the state and the project so we check against the right rates and filing rules.
What happens to my payroll files?
They are used to prepare your report. Your data is never sold or used to train models for other companies.
Does the report replace our own review?
No. It flags what to look at, with the reason and the source rate for each finding. Your team decides what to correct and what to certify.
