Illinois certified payroll: how to file the CTP with IDOL

How to file the Illinois certified transcript of payroll with IDOL: Public ID login, the 15th deadline, the 19 required fields, corrections and penalties.

By Buildalytic editorial team6 min read

Project accountant and contractor reviewing a monthly payroll binder at an oak desk, with the Chicago River skyline and a tower crane outside the window
On this page13 sections

The short answer

On Illinois Prevailing Wage Act projects, each contractor and subcontractor files a certified transcript of payroll (CTP) with the Illinois Department of Labor by the 15th of each month, covering the prior month. You file in IDOL's online portal with an Illinois Public ID, either by typing each worker in or by uploading IDOL's template, and you certify it with a signed statement. You only file for months when construction took place, and late or missing filings carry civil penalties per month.

What to take away

  • File the prior month's payroll by the 15th, in IDOL's portal, under 820 ILCS 130/5.
  • File only for months with construction work. A No Work Report option exists, but IDOL says the Act does not require one.
  • The record has 19 items, including last four of SSN, gender, race, ethnicity, veteran status and hours per day.
  • Penalties run up to $1,000 for a first failure to file and up to $2,000 for a repeat within 5 years, and each month counts separately.

Who files the Illinois certified transcript of payroll

The Prevailing Wage Act requires contractors and subcontractors on covered public works to file certified payroll with IDOL. IDOL's 2026 training says subcontractors must file their own CTP, and its FAQ recommends that every contractor file its own rather than sending payroll through the general contractor. A general contractor may rely on a sub's certification unless it knows the certification is false.

State agencies that choose to collect payroll themselves forward it to IDOL within 10 days. Everyone else files directly in IDOL's database.

Sources: 820 ILCS 130/5, Illinois Prevailing Wage Act (checked November 2026); IDOL, 2026 Certified Transcript of Payroll training slides; IDOL, Certified Payroll FAQ

The deadline: the 15th of every month

File each month's payroll by the 15th of the following month. A payroll for work in March is due April 15. You file only for months in which construction took place on the project. IDOL's portal has a No Work Report checkbox, but IDOL's training says a No Work Report is not required by the Act, and its FAQ says there is no final payroll checkbox.

Sources: 820 ILCS 130/5, Illinois Prevailing Wage Act (checked November 2026); IDOL, 2026 Certified Transcript of Payroll training slides; IDOL, Certified Payroll FAQ

The 19 items each payroll record must show

Section 5 of the Act lists what the records must contain. The copy you file may leave out the daily start and end times.

The 19 items each payroll record must show
GroupItems
WorkerName, address, phone number if available, last four digits of SSN
DemographicsGender, race, ethnicity, veteran status
WorkClassification or classifications, skill level, hours worked each day, start and end times each day
PayGross and net wages per pay period, hourly rate, overtime rate
FringeFringe benefit rates, each fund's name and address, plan sponsor, plan administrator

Sources: 820 ILCS 130/5, Illinois Prevailing Wage Act (checked November 2026)

How to file in the IDOL portal, step by step

IDOL's training slides walk through the portal. In plain terms:

  • Confirm your contract cites the Illinois Prevailing Wage Act.
  • Create an Illinois Public ID, then sign in to the Certified Transcript of Payroll portal as a Public Account. Each company needs its own login.
  • On the Pay Period screen, enter the start and end dates, FEIN, project number, project address and county, and the public agency. Check the State Capital or Rebuild Illinois box if it applies. Upload IDOL's template here if you use one.
  • Enter your contact details, which receive the PDF receipts, and the public body's details.
  • Enter workers by classification. The Employee Roster can fill repeat workers.
  • Upload fringe benefit documentation.
  • On the Review page, check the certification box, type your first and last name, and click Certify. Save the CTP number from the confirmation.

Sources: IDOL, 2026 Certified Transcript of Payroll training slides; IDOL, Certified Transcript of Payroll; IDOL, Certified Payroll FAQ

Using IDOL's upload template

Instead of typing each worker, you can upload IDOL's template. Each file covers one project, and the column order cannot be changed. IDOL updated the portal and template on July 1, 2025, and its own materials describe the file differently, so download the current template from the CTP page each time rather than reusing an old copy.

Sources: IDOL, Certified Transcript of Payroll; IDOL, Certified Payroll FAQ

The signed statement

Each filing carries a statement signed by the contractor or an officer, employee or agent. It says the signer examined the records and they are true and accurate, that each hourly rate is at least the prevailing rate, and that the signer knows knowingly filing a false payroll is a Class A misdemeanor.

Sources: 820 ILCS 130/5, Illinois Prevailing Wage Act (checked November 2026)

Corrections and withdrawals

You can withdraw only payrolls that are due in the current month. After the 15th, a prior month's payroll cannot be withdrawn. Each withdrawal needs a reason and is reviewed, and once approved the payroll returns to submissions needing attention so you can fix and refile it.

Sources: IDOL, Certified Payroll FAQ

Who can see your payroll

Filed payrolls are public records under FOIA, except worker addresses, phone numbers, SSNs, race, ethnicity and gender. Anyone with an Illinois Public ID can search the database.

Sources: 820 ILCS 130/5, Illinois Prevailing Wage Act (checked November 2026); IDOL, Certified Payroll FAQ

Penalties, records and recent changes

Failing to file carries a civil penalty of up to $1,000 for a first violation and up to $2,000 for another within 5 years, and each month is a separate offense. You can request a hearing within 10 business days. Technical problems count as mitigation; not knowing the law does not. Willfully failing to file, or filing a false payroll, is a Class A misdemeanor.

Keep records for 5 years from the last payment, and be ready to produce them within 7 business days at a location in Illinois. Laws effective June 30, 2025 set apprentice fringe benefits no lower than journeyworker fringe and added CCTV sewer inspections to covered public works.

Sources: 820 ILCS 130/5, Illinois Prevailing Wage Act (checked November 2026); IDOL, 2025 Prevailing Wage Act advisory

How Buildalytic helps

Buildalytic collects and reviews certified payrolls for each job. You set up the employers and the weeks each one should report, payroll files land against the right employer and week, and reviewers see what is missing, what is awaiting review and what is marked no work. Brody, Buildalytic's AI teammate, chases missing weeks by call and text with each sub's payroll contact.

For Illinois jobs, each sub's month is tracked against the 15th, reviewers check the 19 items before filing, and Brody follows up with any sub that has not filed its own CTP.

Buildalytic does not decide which law applies, and it does not replace the agency's acceptance. Your team still certifies and files. If you want a quick check first, the free payroll exception report at /payroll-exception-report reviews a week of payroll for common exceptions before it goes out.

Laptop showing an example weekly payroll screen with subcontractors marked received, missing or ready, and counts of payrolls received and to review

Common questions

When is Illinois certified payroll due?

By the 15th of each month for the prior month's work, filed in IDOL's portal.

Do I file for a month with no work?

No. You file only for months in which construction took place. The portal offers a No Work Report, but IDOL says the Act does not require one.

Do subcontractors file their own CTP?

IDOL's training says subcontractors must file their own, and its FAQ recommends every contractor file its own rather than through the general contractor.

Is my certified payroll public?

Yes, under FOIA, except addresses, phone numbers, SSNs, race, ethnicity and gender.

What is the penalty for not filing?

Up to $1,000 for a first failure and up to $2,000 for a repeat within 5 years, per month. Willful failure is a Class A misdemeanor.

Sources and editorial notes

  1. 820 ILCS 130/5, Illinois Prevailing Wage Act (checked November 2026)
  2. IDOL, Certified Transcript of Payroll
  3. IDOL, Certified Payroll FAQ
  4. IDOL, 2026 Certified Transcript of Payroll training slides
  5. IDOL, 2025 Prevailing Wage Act advisory

Prepared with AI assistance. Reference date: 2026-11-23. Worked scenarios use typical figures and are not customer results. Product details can change; confirm the current scope and terms before rollout.