Skip to content

Free tool

Prevailing wage calculator.

Base, fringe, overtime and plan credits for one worker’s week, checked against the wage determination.

No sign-up. What you type stays in your browser.

Your numbers

Result

Required cash wages this week$2,712.50
Base wages (straight + 1.5x overtime on base)$2,289.50
Fringe owed for all hours$963.00
Paid to benefit plans (credit)$540.00
Fringe paid in cash$423.00
Required straight-time cash rate$57.60 / hr
Total package cost$3,252.50

Overtime premium is figured on the basic rate, not the fringe (29 CFR 5.32). Fringe is owed for every hour worked. A plan credit can't exceed the fringe rate.

How it works

The rules behind the numbers.

Base and fringe are separate obligations

A wage determination sets a basic hourly rate and a fringe benefit rate for each classification. You meet the fringe by paying it in cash, contributing to bona fide benefit plans, or a mix. The calculator adds the cash wages and the plan contributions so you can see the whole package.

Overtime is figured on the basic rate

Hours over 40 in a week are paid at one and a half times the basic rate. The fringe is still owed for every hour, overtime included, at the straight fringe rate. Paying time and a half on the fringe is allowed but not required.

Credits must be annualized

If you pay for health insurance or another plan, the hourly credit is the plan cost divided by all hours worked in the period, not just prevailing wage hours. Use the annualization calculator to get the number to enter here.

Full guide: What is prevailing wage? Meaning, how it's calculated and who pays it

FAQ

Questions people ask

Something else? Ask the team

How do you calculate prevailing wage pay?

Multiply straight-time hours by the basic rate and overtime hours by 1.5 times the basic rate, then add the fringe rate times all hours, less any annualized plan credit. Anything not covered by plan contributions is paid in cash.

Is fringe paid on overtime hours?

Yes, the fringe is owed for every hour worked, but at the straight fringe rate. Overtime premium is calculated on the basic hourly rate under 29 CFR 5.32.

Can I pay the whole fringe in cash?

Yes. 29 CFR 5.31 allows the fringe to be paid in cash, through bona fide plans, or a combination, as long as the total meets the wage determination.

Free

Check a whole week of sub payroll, not just one worker.

Send one week of certified payroll and the wage determination. We return an exception report with every rate, fringe, overtime and apprentice issue flagged, free.

Get a free exception report

Check every sub’s payroll, every week, automatically.

Buildalytic collects certified payroll from every tier, checks base, fringe, overtime and classifications against the wage determination, and has Brody chase missing weeks and corrections.

One full Platform plan. No standard setup fee. Start with one supported workflow.

Plan your rollout

Pricing, security reviews, procurement and rollout across your projects and regions.

Build with us

Help build the AI teammate for construction. We're hiring.

Explore careers