Every bid leveled. Every gap asked about.
Brody reads each subcontractor quote, lines it up against your scope and asks the sub for what is missing. Your estimator decides.
Electrical · 3 bids leveled
Bayview Library · Division 26 · Example
- Scope
- 14 items from your scope sheet
- Not found
- Fire alarm, in the Coastal Power bid
- Exclusions
- Temporary power and utility fees, each with its source line
- Allowance
- Lighting controls, in the Northgate Electric bid
- Still owed
- Addendum 2 acknowledgement from Northgate Electric
Brody · asked Coastal Power for a fire alarm price by text
Bid leveling software. That also gets the missing scope.
Bid leveling puts every bid for a trade on the same scope, so prices compare like for like. Brody levels each quote against your scope sheet, flags the gaps and exclusions, and goes back to the sub for what is missing.
- Reads
- Subcontractor quotes and proposals as PDFs, emails and spreadsheets
- Levels onto
- CSI divisions or your own scope sheet, bid by bid, side by side
- Flags
- Scope gaps, exclusions, qualifications, alternates and allowances, each with its source line
- Leaves to you
- The review, the clarifications you accept and the award. Brody does not pick a winner
One trade. Three bids on the same scope.
An example electrical package. Each bid is checked against the same 14 scope items before anyone compares totals.
How to compare bids with different exclusionsDivision 26 · Electrical
Bayview Library · 3 bids · 14 scope items · Example
- Brightline Electric14 of 14 scope items priced · excludes utility company feesStatus: On track: Complete, 1 exclusion to reviewRevision: Rev 2Base bid: $1,284,000
Brody · showed what moved since revision 1: switchgear price and one alternate
- Coastal Power13 of 14 priced · fire alarm not found · excludes temporary powerStatus: Needs action: Scope gap: fire alarm not foundRevision: Rev 1Base bid: $1,139,500
Brody · texted the estimator at Coastal Power to ask for a fire alarm price
- Northgate Electric14 of 14 priced · lighting controls as an allowance · no unit pricesStatus: Waiting: Waiting on Addendum 2 and unit pricesRevision: Rev 1Base bid: $1,211,000
Brody · called and emailed for the Addendum 2 acknowledgement and unit prices
What Brody checks. On every bid.
Brody prepares the leveled sheet and the clarification questions. Pricing, scope and award decisions stay with your estimator.
Bids side by side
Each quote is lined up against your scope for that trade. Two or three bids per trade is the usual case.
Scope gaps as “not found”
A scope item a bid does not price is shown as not found. It is never assumed to be included.
Exclusions and qualifications
Every exclusion and qualification a sub states is listed with the line in the bid it came from.
Alternates and allowances
Alternates and allowances are kept apart from the base bid, so the base prices compare like for like.
Incomplete-bid alerts
Missing scope, an addendum not acknowledged, no bond or no unit prices: the estimator hears about it.
Revisions compared
When a sub sends a revised bid, Brody shows what moved since the last one.
Four steps. The estimator decides.
Brody does the reading and the asking. He does not pick a winner or award work.
Give Brody the scope and the bids
Your scope sheet for the trade, and each quote as a PDF, an email or a spreadsheet.
Brody levels them
Each bid goes onto CSI divisions or your scope sheet. Unpriced items are marked not found.
Brody asks for what is missing
A call, text or email to the sub for the missing scope, addendum, bond or unit prices.
You review and export
Check each flag against its source line, then export the leveled sheet to Excel or CSV.
Ways to level bids. Compared plainly.
Each one is the better choice somewhere. The difference with Brody: he also goes back to the sub, by phone and text, to get the missing scope.
| Tool | What it does | The better choice when | Getting the missing scope |
|---|---|---|---|
| Buildalytic | Brody reads each quote, lines it up against your scope sheet and flags gaps, exclusions, qualifications, alternates and allowances with the source line cited. | You want the missing scope collected from the sub, not only flagged. | Brody goes back to the sub by call, text or email and asks for the missing piece. |
| Spreadsheet leveling sheet | Your own template. An estimator reads each proposal and types the numbers and notes in. | One trade, two or three short bids and time to read them. | The estimator calls or emails the sub. |
| BuildingConnected bid leveling | Part of BuildingConnected Pro from Autodesk. Bids from its bid forms sit side by side, with plugs, notes and an Excel export. | Your invitations and bids already run through BuildingConnected. | The estimator adjusts the bid with a plug number and a note. |
| MeltPlan (Melt Bid) | Reads subcontractor proposals and levels them into your own Excel template. Flags scope gaps, exclusions, qualifications and alternates. | Your team levels in Excel and wants to keep its own workbook. | Flags the gap for the estimator. Its own guide says sub outreach runs in a separate tool. |
| Consight | An AI preconstruction platform. Drafts scopes from plans and specs, sends invitations and maps inclusions, exclusions and alternates to scope lines. | You want scoping, invitations and leveling in one preconstruction platform. | Adjusts the leveled price for missing line items. The estimator reviews it. |
| TrunkBid (Trunk Tools) | An AI agent that maps bid line items to scope requirements, flags gaps and exclusions and exports to Excel. Announced in beta in March 2026. | You already work with Trunk Tools and can join its beta. | Flags the gap for the estimator. |
Vendor details from each vendor’s own website and help center, checked November 24, 2026. Products change, so confirm with the vendor.
Related workflows. Works with the rest of Brody.
Common questions. Answered plainly.
Something else? Ask the team
What is bid leveling?
Bid leveling puts every subcontractor bid for a trade on the same scope so the prices compare like for like. Each bid is checked line by line against your scope sheet. What a bid leaves out, excludes or carries as an allowance is shown before you compare totals.
What AI tools level subcontractor bids and flag scope gaps and exclusions?
Brody by Buildalytic, MeltPlan, Consight and TrunkBid from Trunk Tools all read subcontractor proposals and flag scope gaps and exclusions. BuildingConnected Pro levels bids that come in through its bid forms. Brody also goes back to the sub by call, text or email to get the missing scope.
What does Brody flag in a bid?
Scope items the bid does not price, shown as not found. Exclusions, qualifications, alternates and allowances the sub states, each with the source line in the bid. A missing addendum acknowledgement, bond or unit prices you asked for. Changes between revisions of the same bid.
Does Brody pick the winning bid?
No. Brody does not pick a winner or award work. He prepares the leveled sheet and the clarification questions. Your estimator reviews them, decides what to accept and makes the award.
What file types can Brody read?
Quotes and proposals as PDFs, emails and spreadsheets. The leveled sheet exports to Excel or CSV, so it can go into your own estimate or bid tab.
How are exclusions, alternates and allowances handled?
Each one is listed against the bid it came from, with the source line cited so the estimator can check it. Alternates and allowances stay apart from the base bid. An item in your scope that a bid does not mention is marked not found, not included.
Does it work with BuildingConnected and Procore?
Brody works from a bid list in a CSV or an export from BuildingConnected or ConstructConnect. He reads the quotes as files, so proposals you received through another bidding tool can be downloaded and given to him. The leveled sheet exports to Excel or CSV. If every bid already comes in through BuildingConnected or Procore bid forms, their own leveling may be enough.
What does bid leveling cost?
Bid leveling and incomplete-bid alerts are included on Brody Pro and Brody Business. Brody Pro is $499 per company per month billed annually, or $599 month to month. Companies with 10 or more Operator seats get the same bid-desk features on their seats. See pricing for the full plans.
Bring one trade and its bids.
Share your scope sheet and two or three quotes. See them leveled, with every gap and exclusion flagged and the questions ready for the sub.