Buildalytic vs LCPtracker for certified payroll.
LCPtracker gives agencies and primes a portal. Buildalytic gets every sub’s payroll in, checked and corrected, with Brody doing the follow-up.
LCPtracker Pro for agencies and primes monitoring every contractor, and LCPcertified for contractors producing their own reports.
Brody collects every sub’s payroll, follows up by call and text, checks each week against the wage determination and hands your team a reviewed packet.
Side by side. Three products, three jobs.
Buildalytic is built for the contractor collecting subcontractors’ payrolls, with the follow-up done for you.
Certified payroll software compared| Question | Brody by Buildalytic | LCPtracker Pro | LCPcertified |
|---|---|---|---|
| Built for | The contractor collecting and reviewing every subcontractor’s certified payroll on a job. | Public agencies and prime contractors monitoring the compliance of every contractor on a project, in LCPtracker’s words. | Self-performing contractors producing their own certified payroll reports. |
| How payrolls come in | Brody tracks each employer and week, then calls or texts the sub’s payroll contact for anything missing or corrected. | A portal that subcontractors submit their payrolls to. | The contractor prepares its own reports from payroll it already runs. |
| Wage checks | Classification, base rate, fringe, overtime, apprentice ratios and contract wage floors, against the job’s wage determination. | Compliance monitoring for every contractor on the project. | Certified reports with apprentice fields on the WH-347. |
| State and agency filing | A reviewed packet your team certifies and files in the system the agency names. | Agencies such as TxDOT, NDDOT and the State of Colorado run certified payroll filing in LCPtracker. | California, Washington and Maryland XML files. |
| Price | Quoted per project, separately from Brody’s communications plan. | Not published on its product page. | $12 a report, or $145 a month for up to five active projects. |
LCPtracker details from lcptracker.com, checked November 11, 2026. Agency filing from TxDOT, NDDOT and Colorado requirements in our state guides.
Monday on a Davis-Bacon job. Every week accounted for.
One project’s payroll week in Buildalytic: what arrived, what Brody chased and what is ready for review.
Collect subcontractor payrollsCertified payroll · Riverside Bridge Rehab
Week ending Nov 15 · 9 of 11 employers in, 2 findings in review
- Missing
Ridgeline Concrete
Payroll not received for the week
Brody · called the payroll contact, file promised by Wednesday
- $224.00
Coastal Electric
Fringe short $1.40 an hour for two electricians
Brody · texted the finding and requested a corrected payroll
- Revised
Summit Steel Erectors
Corrected payroll received, original kept beside it
Brody · matched the correction to last week’s finding
- No work
Valley Paving
No work performed this week
Brody · confirmed by text and logged the statement
A portal waits for files. Brody goes and gets them.
Collection, checks and corrections in one place, with the follow-up already done.
Certified payrollWho Buildalytic is built for. The contractor in the middle.
Primes and GCs responsible for every subcontractor’s payroll on public work.
Prevailing wage compliance- Covered: General contractors collecting payrolls from many subcontractors
- Covered: Teams that spend Mondays chasing missing weeks by phone
- Covered: Reviewers who want every finding beside the source payroll
- Covered: Projects mixing Davis-Bacon, state prevailing wage and apprenticeship rules
- Covered: Subs whose payroll contacts speak many languages
- Covered: Companies that want corrections traceable before anyone certifies
Start with one project. Then add the rest.
Start with a demo on your own work, then go live on one real project.
Certified payroll auditSet up one project
Employers, expected weeks and the wage determination on the contract.
Bring a sample payroll
One real week, so the checks run on your own job from the start.
Let Brody collect
He follows up on every missing and corrected week by call and text.
Certify and file
Your team signs the reviewed packet and files it where the agency requires.
More comparisons. And next steps.
- Certified payrollCollection, checks and review
- Collect sub payrollsEvery employer and week tracked
- Prevailing wage complianceChecked against the determination
- Certified payroll auditFindings, corrections and evidence
- Payroll exception reportCheck a week of sub payroll
- LCPtracker alternativesOptions for GCs and for subs
- Certified payroll softwarePrices and state files compared
- All comparisonsBrody against every option
Questions people ask. Answered plainly.
Something else? Ask the team
What is the difference between Buildalytic and LCPtracker?
LCPtracker sells two products. LCPtracker Pro is built, in LCPtracker’s own words, for public agencies and prime contractors monitoring every contractor on a project, and LCPcertified is for self-performing contractors producing their own reports. Buildalytic is built for the contractor collecting and reviewing subcontractors’ payrolls: Brody follows up on missing and corrected weeks by call and text, each payroll is checked against the wage determination, corrections are tracked, and your team gets a reviewed packet to certify.
How much does LCPtracker cost?
LCPtracker publishes LCPcertified pricing of $12 a report, or $145 a month for up to five active projects. LCPtracker Pro’s price is not published on its product page (checked November 11, 2026). Buildalytic’s certified payroll is quoted per project, separately from Brody’s communications plan.
Is Buildalytic an alternative to LCPtracker Pro or to LCPcertified?
Buildalytic serves the same contractor as LCPtracker Pro: the company receiving payrolls from many subcontractors. It adds Brody’s follow-up by call and text and a review queue for every finding. LCPcertified serves contractors producing their own reports, and Buildalytic serves the contractor collecting them.
Our agency requires certified payroll in LCPtracker. Does Buildalytic still help?
Yes. Agencies such as TxDOT, NDDOT on federal-aid projects and the State of Colorado run certified payroll filing in LCPtracker. Buildalytic does the work before that step: Brody gets every sub’s payroll in, each one is checked against the wage determination, corrections are tracked, and your team approves and files in the system the agency names.
What does Buildalytic check on each payroll?
The classification for the work performed, the base rate, fringe paid as plan contributions or cash, overtime at time and a half of the base rate, apprentice registration and ratios, and any minimum wage floor on the contract. Findings open in a review queue with the source payroll attached.
Does Buildalytic submit certified payroll to the agency?
Your team certifies and files. Buildalytic collects, checks and tracks corrections, then hands over a reviewed packet with its history. Confirm the recipient, format and portal for each project during setup, and keep the agency’s receipt with the payroll.
How do we start?
Start with a demo on your own work, then go live on one real project. Bring one project’s reporting requirements and a sample payroll, and the team scopes collection, review and the reporting handoff for that job.
Get every sub’s payroll in, checked.
Bring one project and a sample payroll. See what is missing, what needs review and how Brody follows up.
