Skip to content
Buildalytic

Certified payroll, connected to your ERP.

Brody reads each week’s payroll from Vista, Spectrum, Sage or Foundation, checks it and writes status back.

A server cabinet sends payroll envelopes along a cable to a site office table with a laptop and payroll folders, where a worker reviews a clipboard

Your ERP runs payroll. Brody checks every week of it.

No exports, no second payroll system. Brody reads from the ERP you already run and writes the result back.

  1. Connect and read

    Each week’s payroll for the job: employees, classifications, hours, rates and fringe.

  2. Check

    Every worker against the project’s wage determination, with findings beside the source.

  3. Collect the subs

    Brody follows up with every subcontractor and checks their payroll the same way.

  4. Write back

    Corrections kept with the original, and review status written back into the ERP.

One week, straight from the ERP. Checked before anyone signs.

Your crews come from the ERP, your subs from Brody’s follow-up, all on one project and week.

A payroll checked line by line
Weekly payroll · Harbor transit maintenance buildingWeek ending Friday · read from Vista · 4 employers2 to review
  • Your crewsRead from Vista · 23 workers · classifications, rates and fringe checkedChecked912.0 h
  • Mechanical subcontractorCollected by Brody · fringe below the determination for 2 workersFringe short236.0 h
  • Electrical subcontractorCollected by Brody · overtime premium missing for 1 workerOvertime to fix184.5 h
  • Paving subcontractorNo work this week, recordedNo-work week0.0 h

Brody · read 23 workers and 912 hours from Vista for this job

Brody · wrote the review status back to Vista and asked the mechanical sub for a corrected week

Built for the ERP you run. Vista, Spectrum, Sage and Foundation.

Each ERP below has its own integration page with every record Brody reads and writes.

All integrations

Viewpoint Vista. Certified payroll without rekeying.

Brody connects to Vista, reads each week’s payroll for the job and writes compliance status back into it.

Vista integration
  1. What Brody reads

    Jobs, employees by employee ID and craft, and the week’s payroll: classifications, hours, rates and fringe.

  2. What gets checked

    Every worker against the project’s wage determination, and every subcontractor’s payroll collected beside your own crews.

  3. What goes back

    Review and compliance status, confirmed employee details and vendor updates, within the fields your Vista admin allows.

Viewpoint Spectrum. Prevailing wage, checked weekly.

Brody connects to Spectrum, reads the week’s payroll for each prevailing wage job and keeps the record current.

Spectrum integration
  1. What Brody reads

    Jobs, employees and crafts, vendors and subcontracts, and the week’s payroll hours, rates and fringe.

  2. What gets checked

    Rates, fringe and overtime against the wage determination, with Brody chasing subs for their payrolls.

  3. What goes back

    Compliance status, employee phone numbers and vendor contacts, matched to the existing Spectrum records.

Sage Intacct Construction. Payroll and vendors in one review.

Brody connects to Sage Intacct, reads each project’s payroll and labor records and writes status back.

Sage Intacct integration
  1. What Brody reads

    Projects, vendors and the week’s payroll and labor records: employees, classifications, hours, rates and fringe.

  2. What gets checked

    Each week against the project’s wage determination, with subcontractor payrolls tied to the vendor and project.

  3. What goes back

    Review and vendor compliance status, plus approved payables and contact updates.

Sage 300 CRE. Every job’s payroll, reviewed.

Brody connects to Sage 300 CRE, reads jobs, employees and the week’s payroll and writes compliance updates back.

Sage 300 CRE integration
  1. What Brody reads

    Jobs and cost codes, employees and crafts, vendors, and the week’s hours, rates and fringe.

  2. What gets checked

    Classifications, base rates, fringe and overtime against the wage determination for each job.

  3. What goes back

    Vendor compliance status, confirmed employee details and approved payables.

Foundation. Reports your team can sign.

Brody connects to Foundation, reads each week’s payroll and checks it before your certified payroll report goes out.

Foundation integration
  1. What Brody reads

    Jobs and cost codes, vendors and subcontracts, and the week’s payroll: employees, classifications, hours, rates and fringe.

  2. What gets checked

    Each week against the project’s wage determination, and every subcontractor’s payroll collected and checked the same way.

  3. What goes back

    Review and vendor compliance status, approved payables and vendor contact updates.

Working in several states? Ask every provider the same things.

Run one real week from your ERP on a job in each state you work in, and check each of these.

Certified payroll software compared
  • Reads payroll straight from your ERP, with no re-keyed export
  • Applies each project’s own wage determination
  • Produces each reporting path, such as WH-347, California eCPR and Oregon WH-38
  • Collects and checks your subcontractors’ payrolls too
  • Keeps every correction beside the original and the decision
  • Writes review status back into the ERP

Scoped to your project. Quoted separately.

Certified payroll is quoted per project, separately from Brody’s communications plan.

Talk to the payroll team
  • Bring one project

    Its wage determination and a sample week from your ERP.

  • Agree the weeks

    Employers, periods, reviewers and what goes back.

  • Then extend

    Add more public jobs once the first one runs well.

Common questions. Answered plainly.

Something else? Ask the team

How do I automate prevailing wage payroll with Viewpoint Vista?

Connect Vista to Buildalytic. Brody reads each week's payroll for the job from Vista (employees, classifications, hours, rates and fringe), checks it against the project's wage determination, collects every subcontractor's payroll, keeps corrections with the original and writes compliance status back to Vista. Your team certifies a reviewed packet.

How do I automate prevailing wage payroll with Viewpoint Spectrum?

Connect Spectrum to Buildalytic. Brody reads the week's payroll for each prevailing wage job from Spectrum, matches workers to their employee and craft records, checks rates, fringe and overtime against the wage determination, follows up with subcontractors for their payrolls and writes status and contact updates back to Spectrum.

How do I automate prevailing wage payroll with Sage Intacct?

Connect Sage Intacct Construction to Buildalytic. Brody reads the week's payroll and labor records for each project, checks them against the project's wage determination, ties subcontractor payrolls to the vendor and project in Intacct, and writes review and compliance status back.

How do I automate prevailing wage payroll with Premier?

Connect Premier Construction Software to Buildalytic. Brody reads projects, vendors and the week's payroll, checks every week against the wage determination, collects subcontractor payrolls and writes compliance updates back to Premier.

Does Foundation offer certified payroll and Davis-Bacon compliance for government construction contractors?

Foundation's payroll module describes multi-union, multi-state timecards and print or electronic certified payroll reports for federal, state and local agencies (Foundation's site, checked November 2026). Buildalytic connects to Foundation, reads each week's payroll, checks it against the project's wage determination, collects and checks every subcontractor's payroll, and writes status back to Foundation, so the reports your team certifies come from a reviewed week.

How do I automate certified payroll with Sage 300 CRE?

Connect Sage 300 CRE to Buildalytic. Brody reads jobs, employees and crafts and the week's payroll, checks it against the wage determination, collects subcontractor payrolls and writes compliance updates back to Sage 300 CRE.

Is there an ERP with certified payroll built in?

Several construction ERPs include payroll that prints certified payroll reports: Foundation and Sage 100 Contractor describe certified payroll reports in their payroll modules, and Vista documents standard reports for federal requirements (vendor documentation checked November 2026). Buildalytic connects to those ERPs and adds what a payroll module does not: checking every week against the wage determination and collecting and checking every subcontractor's payroll.

What is the best payroll integration for contractors on prevailing wage jobs?

One that reads payroll straight from the ERP instead of a re-keyed export, checks every week against the project's wage determination, includes subcontractors' payrolls, keeps corrections with the original and writes status back. Brody does all five with Vista, Spectrum, Sage Intacct, Sage 300 CRE, Foundation and the other ERPs on our integrations page.

How can I compare certified payroll providers for contractors working in several states?

Ask each provider to run one real week from your ERP on a job in each state you work in. Check that it reads payroll from your ERP, applies each project's own wage determination, produces each state's reporting path (such as federal WH-347, California eCPR and Oregon WH-38), collects your subcontractors' payrolls and keeps corrections with the original. Our certified payroll software comparison covers the main tools.

Does Buildalytic replace our ERP's payroll?

No. Your ERP keeps running pay, taxes and deposits. Buildalytic reads the payroll, checks it, collects the subcontractor side and writes status back; your authorized team certifies.

How is it priced?

Certified payroll is quoted per project, separately from Brody's communications plan. Bring one project, its wage determination and a sample week from your ERP.

See it on your own payroll.

Start with a demo on your own work, then go live on one real project. Payroll is quoted per project.