Washington prevailing wage: intent, payroll and affidavit

How to file Washington prevailing wage paperwork in L&I's PWIA: the Statement of Intent, monthly certified payroll, the affidavit, fees and retainage.

By Buildalytic editorial team5 min read

Superintendent in a hi-vis vest and an office manager checking a prevailing wage filing on a laptop, with a rainy Pacific Northwest jobsite and evergreens outside the window
On this page13 sections

The short answer

On Washington public works, every contractor and subcontractor files three things with L&I in its online system, PWIA: a Statement of Intent to Pay Prevailing Wages, weekly certified payroll submitted at least once a month, and an Affidavit of Wages Paid after its work is done. The awarding agency cannot pay a business until L&I approves its Intent, and it cannot release retainage until every Affidavit on the job is approved. The Intent and the Affidavit each cost $40.

What to take away

  • File the Intent right after award. By law the agency cannot pay you until L&I approves it.
  • Certified payroll can only be filed once your Intent shows Approved, and must be filed at least monthly.
  • File the Affidavit after your work is done. Retainage waits on every Affidavit from every tier.
  • Intent and Affidavit fees are $40 each. Contracts up to $5,000 can use a combined form filed online.

The three filings and when each one is due

Every business on the project files its own set, primes and subs at every tier.

The three filings and when each one is due
FilingWhenFeeApproved by
Statement of Intent to Pay Prevailing WagesRight after award, before payment; L&I advises before work starts$40L&I
Certified payrollWeekly records, filed in PWIA at least once a monthNoneVisible to the agency, prime and L&I once affirmed
Affidavit of Wages PaidAfter your work is done; after final acceptance and before retainage is released$40L&I certifies it

Sources: RCW 39.12.040 (checked November 2026); WAC 296-127-040, Intent fee; WAC 296-127-045, Affidavit fee; L&I, Public works projects for contractors and employers

Step 1: File the Statement of Intent

RCW 39.12.040 says the agency cannot pay a contractor or sub until L&I has approved its Intent. L&I advises filing immediately after award and before work begins. On contracts over $10,000 the Intent shows your registration number and the rate for each classification, and the approved Intent is posted on the jobsite. Until it is approved, post the full rate list.

Sources: RCW 39.12.040 (checked November 2026); L&I, Public works projects for contractors and employers

Step 2: File certified payroll in PWIA

RCW 39.12.120 requires every contractor and sub to file weekly certified payroll in L&I's online system at least once a month. You can only file once your Intent shows Approved. The ways to file:

  • Manual entry, one weekly report at a time
  • Bulk upload of workers with L&I's CSV template
  • A No Work Performed report covering a range of dates
  • Amendments, which need a written reason
  • Owners with no employees use a printed form that they scan and upload

Sources: L&I, PWIA step-by-step instructions; L&I, Prevailing Wage Law booklet F700-032-000

What each weekly report must show

L&I's instructions and the statute call for the following for each worker. Any 4/10 schedule agreement is uploaded on L&I's form F700-176 or F700-177.

  • Full name, address and Social Security number
  • Trade or occupation
  • Straight-time rate and hourly usual benefits
  • Overtime hours each day and week
  • Gross wages, itemized deductions, withholdings and net pay

Sources: L&I, PWIA step-by-step instructions; L&I, Prevailing Wage Law booklet F700-032-000

Step 3: File the Affidavit of Wages Paid

After your work is done, file the Affidavit reporting the work performed and the rates paid. It is filed after final acceptance and before retainage is released; if no retainage is held, before final acceptance. L&I certifies each one. A prime may file for a sub that went out of business or failed to file, but the prime then takes on that sub's unpaid wages.

Sources: RCW 39.12.040 (checked November 2026); L&I, Prevailing Wage Law booklet F700-032-000

How affidavits release retainage

On most projects of $35,000 or more, excluding tax, the agency withholds 5 percent. Release needs certificates of release from the Department of Revenue, Employment Security and L&I, approval of every Affidavit on the job, and no lien filed. One missing Affidavit from any tier holds the money for everyone, so primes should check the Intents Not Filed and Affidavits Not Filed tabs for their subs.

Sources: L&I, Prevailing Wage Law booklet F700-032-000; L&I, PWIA step-by-step instructions

The combined form for small jobs

Contracts of $5,000 or less, including tax, can use a combined Intent and Affidavit, filed online only. The agency approves it instead of L&I and takes on liability for unpaid wages. No subcontractors are allowed, the job must be paid in one payment, and projects cannot be split to stay under the limit.

Sources: RCW 39.12.040 (checked November 2026); L&I, Prevailing Wage Law booklet F700-032-000

Penalties and records

RCW 39.12.050 sets a $500 civil penalty for each false filing or each failure to file or post, and you cannot bid on public works until it is paid. A second violation within 5 years adds a one-year bidding ban. Errors proven to be inadvertent are not penalized, but the contractor carries the burden of proof. Keep payroll records for 3 years from the date the agency accepts the project.

Sources: L&I, Prevailing Wage Law booklet F700-032-000; RCW 39.12.120

Checklist for a Washington public works job

Run through this at each stage.

Checklist for a Washington public works job
StageCheck
AwardIntent filed and $40 paid; every sub reminded to file its own
Before workApproved Intent posted, or the full rate list while pending
Each monthEvery week filed in PWIA, including No Work Performed weeks, for you and every sub
CompletionAffidavit filed and $40 paid; every sub's Affidavit approved
RetainageDOR, ESD and L&I releases requested once all Affidavits are approved

How Buildalytic helps

Buildalytic collects and reviews certified payrolls for each job. You set up the employers and the weeks each one should report, payroll files land against the right employer and week, and reviewers see what is missing, what is awaiting review and what is marked no work. Brody, Buildalytic's AI teammate, chases missing weeks by call and text with each sub's payroll contact.

For Washington jobs, the expected weeks start once each sub's Intent is approved, reviewers check each week before it goes into PWIA, and Brody follows up with subs that still owe a week or an Affidavit, so retainage is not held up by one missing filing.

Buildalytic does not decide which law applies, and it does not replace the agency's acceptance. Your team still certifies and files. If you want a quick check first, the free payroll exception report at /payroll-exception-report reviews a week of payroll for common exceptions before it goes out.

Laptop showing an example weekly payroll screen with subcontractors marked received, missing or ready, and counts of payrolls received and to review

Common questions

Do I have to file the Intent before work starts?

The law says the agency cannot pay you until L&I approves your Intent. L&I advises filing immediately after award and before work begins.

How much does it cost to file an Intent and an Affidavit?

$40 each under WAC 296-127-040 and 296-127-045. Older references to $20 are out of date.

How often do I file certified payroll in Washington?

Weekly payroll records, filed in L&I's online system at least once a month, once your Intent is approved.

What if we had no work for a few weeks?

File a No Work Performed report in PWIA covering those dates.

Why is our retainage still held?

Retainage waits on approval of every Affidavit on the job, from every tier, plus releases from DOR, ESD and L&I.

Sources and editorial notes

  1. RCW 39.12.040 (checked November 2026)
  2. RCW 39.12.120
  3. WAC 296-127-040, Intent fee
  4. WAC 296-127-045, Affidavit fee
  5. L&I, Public works projects for contractors and employers
  6. L&I, PWIA step-by-step instructions
  7. L&I, Prevailing Wage Law booklet F700-032-000

Prepared with AI assistance. Reference date: 2026-11-23. Worked scenarios use typical figures and are not customer results. Product details can change; confirm the current scope and terms before rollout.