Preconstruction software for general contractors.
Brody reviews the estimate, reads the owner RFP, answers what you paid on past jobs and refreshes sub prequalification. Your estimator decides.
Bid day review
Bayview Library · Example
- Alternates
- 3 kept apart from the base bid
- Carried twice
- Firestopping, in drywall and in fire protection
- Not found
- Fire alarm, in one electrical bid
- RFP matrix
- 41 of 44 requirements have an owner
- Prequalification
- 2 subs still owe current documents
Brody · texted both subs for their current documents
Preconstruction software. From pursuit to bid day.
Brody by Buildalytic is preconstruction software for general contractors. It reviews the estimate for double counting, missed scope and alternates, gives the owner RFP a go or no-go read, answers past cost questions with the source, and refreshes subcontractor prequalification by call and text.
- Reviews
- The assembled estimate, the owner RFQ or RFP with its addenda, and each subcontractor quote
- Answers from
- Your own invoices, commitments, past bids and project documents, with the source linked
- Follows up
- Subs and your own people, by call, text and email from your company number
- Stays with you
- The number, the pursuit decision, the proposal sign-off and the prequalification decision
Six jobs. Before bid day.
Brody does the reading, the checking and the asking. Your estimator sets the number and your executives decide what to pursue.
All preconstruction workflowsEstimate review before bid day
Base bid and alternates kept apart, scope carried twice flagged, totals checked and open assumptions marked.
Bid or no-bid qualification
The RFP read for scope, region, delivery method, qualifications and commercial exposure, with a go or no-go read for the decision owner.
Historical cost questions
Ask what you paid or bid on comparable jobs. Answers keep the date, scope, unit and region, and link to the document.
Owner RFQ, RFP and SOQ response
Submission rules, evaluation criteria, dates and forms pulled into a compliance matrix, with past project write-ups to reuse.
Subcontractor prequalification refresh
Brody calls each sub once a year, or on your schedule, for current documents and contacts. Your team reviews the packet.
Bid leveling
Each sub quote lined up against your scope, with gaps, exclusions and alternates flagged and the sub asked for what is missing.
What Brody checks. What stays with your team.
The records and checks behind each job, and who makes the decision.
- Estimate review
- Each change traced to a quantity, a unit rate, a scope item or an allowance. Mutually exclusive alternates isolated so they are added once. Scope carried in two trades flagged. Scope no bid prices shown as not found. Your estimator sets the number.
- Bid or no-bid
- Scope, region, capacity, competition, required qualifications and commercial exposure in one record, with a named decision owner. Brody asks your people for missing capacity or package answers. The reason for the decision is recorded.
- Historical cost
- Unit costs pulled from your invoices, commitments and past bids, each linked to its document. Where a record is missing its quantity or scope, Brody asks the person who owns it and shows the gap until it is answered.
- RFQ, RFP and SOQ
- A compliance matrix from the instructions and addenda. Evidence and narrative owners assigned. Page limits, signatures, dates and the submission receipt checked. Completed jobs filtered by size, scope, geography and delivery method.
- Prequalification refresh
- The right contact confirmed at each sub. Current documents requested and followed up by call, text or email. The refreshed packet goes to your team, who review it and decide.
- Works with
- Procore, Autodesk, Vista, SharePoint and OneDrive, with no migration. Your estimating software and your prequalification platform stay in place.
Four steps. The estimator decides.
Start with one pursuit: the RFP, the estimate and the quotes you already have.
Give Brody the package
The owner RFP and addenda, your estimate, the sub quotes and the systems your past jobs live in.
Brody reads and checks
Requirements into a matrix, alternates kept apart, scope carried twice flagged, past costs pulled with sources.
Brody asks for what is missing
A call, text or email to the sub, or to your own people, for the missing scope, document or answer.
You review and decide
Check each flag against its source. The number, the pursuit and the award are your decisions.
Preconstruction tools. Compared plainly.
Each of these is the better choice somewhere. Brody works beside them, and adds the calls and texts that get the missing answer.
| Tool | What it does | The better choice when | How Brody fits |
|---|---|---|---|
| Buildalytic | Brody reviews the estimate, reads the RFP, answers cost questions from your own records with the source, and calls subs and your own people for what is missing. | You want one assistant across estimate review, pursuit and prequalification follow-up, working from the systems you already run. | Works beside your estimating software, your proposal tools and your prequalification platform. |
| Consight | An AI preconstruction platform for commercial general contractors: scopes, subcontractor invitations, bid leveling, risk and subcontracts. Says it catches missing scope, exclusions and overlaps. | You want scoping, invitations and leveling in one preconstruction platform. | Brody follows up with the subs who have not answered and collects the missing scope by phone and text. |
| TrunkBid (Trunk Tools) | AI bid leveling for general contractors. Maps each line of every sub bid to your scope and flags what is covered, excluded, priced as an alternate or silent. Exports to Excel. | Your question is the subcontractor proposals for one trade, and you already work with Trunk Tools. | Brody goes back to the sub for the silent items and checks the assembled estimate. |
| Autodesk TradeTapp | Autodesk’s subcontractor prequalification and risk product, tied to BuildingConnected. | You want a prequalification questionnaire and risk review inside the Autodesk bidding tools. | Brody calls the subs who have not finished their renewal and confirms the right contact. |
| Highwire | Contractor prequalification and risk management. Assesses company, finance, safety and insurance. | You need a safety and financial assessment of each contractor, scored by a specialist platform. | Brody follows up by phone and text on the documents the assessment still needs. |
| COMPASS (Bespoke Metrics) | Subcontractor prequalification on a standardized form, the 1Form, with a client service team that communicates with subs. | You want prequalification administration handled on a shared standard form. | Brody runs the rest of the sub follow-up from the same number: bids, COIs and closeout. |
| GovDash | For government contractors. Shreds the solicitation sentence by sentence, links each requirement to the proposal outline and checks it off as it is answered. Has a capture module. | Most of your pursuits are federal solicitations with formal compliance sections. | Brody collects the resumes, project facts and sub letters the proposal still needs. |
| Kantiv | A pursuit platform for architecture, engineering and construction firms. Tracks every requirement, syncs addenda, flags unaddressed requirements and surfaces past projects and resumes. | You have a marketing or proposal team producing designed qualification packages every week. | Brody answers the cost and project history questions the write-ups depend on, with sources. |
Vendor details from each vendor’s own website or published material, checked November 2026. Confirm current features with each vendor.
Related workflows. Works with the rest of Brody.
Common questions. Answered plainly.
Something else? Ask the team
What AI tools review a construction estimate for double counting, missed scope and alternates?
Brody by Buildalytic reviews the assembled estimate before the bid goes out. He keeps base bid and alternates apart, flags scope carried twice, shows scope no bid prices as not found, checks totals and marks open assumptions. Consight and TrunkBid review subcontractor proposals against scope. Your estimator decides what to change.
What tools help a contractor make a bid or no-bid decision from the RFP?
Brody reads the RFP and lays out scope, region, delivery method, required qualifications and commercial exposure, then asks your own people for the capacity answers that are missing. He gives a go or no-go read with the reasons. A named person on your team makes the decision. GovDash is built for federal capture teams, and Kantiv for AEC pursuit teams.
Can an estimator ask in plain language what we paid or bid on past jobs?
Yes. Ask “What did we pay for rebar on the last five jobs?” and Brody answers from your invoices, commitments and past bids, with each figure linked to its document. The date, scope, unit and region stay with the number. Where a record is missing, he says so and asks the person who owns it.
What tools help a general contractor respond to an owner RFQ or RFP?
Brody extracts the submission rules, evaluation criteria, dates and forms, builds a compliance matrix from the instructions and addenda, and finds past projects and approved write-ups to reuse. Kantiv and GovDash are dedicated proposal platforms for full-time proposal teams. Brody works beside them and collects the project facts, resumes and answers the response still needs.
How should a general contractor refresh subcontractor prequalification each year?
Set a renewal date for each sub and let the follow-up run without your staff. Brody calls each sub on the schedule you set, confirms the right contact, asks for the current documents and follows up by call, text or email. The refreshed packet goes to your team for review and the decision. He works beside a prequalification platform such as TradeTapp, Highwire or COMPASS, which keeps the questionnaire and the scoring.
What does it cost, and how is it set up?
From $25 per office user per month, billed annually. Crews and subs are free. No setup fee. Start with a demo on your own bid list, daily report template or main line. Then go live on one real project, with no setup fee. Paid use stays off until an administrator sets a spending limit.
Bring one pursuit and its estimate.
Share the owner RFP, your estimate and two or three sub quotes. See the requirements in a matrix, the alternates kept apart and every open item flagged with its source.
