What is prevailing wage? The meaning, how DOL sets rates with the 30 percent rule, who pays it, a worked paycheck example and a 50-state table of state laws.

By Buildalytic Research Desk18 min read

Editorial scene of a jobsite office desk with a blank payroll ledger and site photos
Illustrative editorial scene. Federal rules summarized from 29 CFR parts 1 and 5 and dol.gov, checked November 17, 2026. Not legal advice.
The short answer

Prevailing wage is the minimum hourly pay, base rate plus fringe benefits, that a government sets for each construction trade in an area and requires contractors to pay on public or publicly funded work. On federal jobs over $2,000, the Davis-Bacon Act applies and the Department of Labor publishes the rates in wage determinations on SAM.gov. Many states have their own laws for state and local projects. Buildalytic checks certified payroll against the wage determination for each job.

What to take away

  • Prevailing wage is a floor for each trade in each area, made of a base hourly rate plus a fringe benefit rate.
  • Federal Davis-Bacon rates come from DOL wage surveys and are published as wage determinations on SAM.gov.
  • A rate prevails if more than 50 percent of surveyed workers earn it; otherwise the most common rate paid to at least 30 percent; otherwise a weighted average.
  • Every contractor and subcontractor with laborers or mechanics on a covered job pays it, and the prime answers for its subs.
  • About half the states have their own prevailing wage law with different thresholds, so check the state as well as the funding.

What is prevailing wage? The meaning in plain terms

Prevailing wage is the minimum a contractor must pay a worker in a given trade, in a given area, on a covered public construction project. It is not one number. It is a schedule: a carpenter in one county has a rate, an electrician has another, a laborer has another, and each rate usually has two parts, a basic hourly rate and a fringe benefit rate.

The idea is simple. When public money pays for construction, the government does not want the lowest bidder to win by cutting local pay. So it looks at what workers in each trade actually earn on similar projects nearby and makes that the floor for the job.

The federal version is the Davis-Bacon Act. The Department of Labor says it requires contractors and subcontractors to pay laborers and mechanics no less than the locally prevailing wages and fringe benefits on federally funded or assisted contracts over $2,000 for construction, alteration or repair of public buildings or public works. Many states have their own laws, often called little Davis-Bacon acts, for state and local work.

Sources: U.S. Department of Labor: Davis-Bacon and Related Acts; 29 CFR 1.2: Definitions, including prevailing wage

Federal Davis-Bacon vs state prevailing wage laws

Davis-Bacon covers contracts with a federal agency. The Davis-Bacon Related Acts extend the same labor standards to projects the federal government helps pay for through grants, loans, loan guarantees and insurance. That is how a city water plant or a housing project can carry federal wage rates even though the owner is a local agency.

State laws cover public works paid for by the state, a county, a city or a school district. Each state sets its own threshold, rates, forms and filing system. A job can be covered by both at once, which is common when federal grant money flows through a state or local agency.

When both apply, plan to meet both, which in practice means paying the higher rate for each classification and filing every report each law requires. Our separate article on Davis-Bacon vs state prevailing wage walks through a dual-coverage job in detail, so this guide stays on the basics.

Sources: U.S. Department of Labor: Davis-Bacon and Related Acts; U.S. Department of Labor: State prevailing wage laws

How is prevailing wage calculated? The DOL survey and the 30 percent rule

For Davis-Bacon, the Wage and Hour Division runs a continuing program to collect wage data. Contractors, contractor associations, unions, public officials and others send in what they paid on projects: the classification, the number of workers and the rates. DOL may also use signed collective bargaining agreements, rates set by state and local officials under their own prevailing wage laws, and other pertinent information.

DOL then applies the definition in 29 CFR 1.2, as revised by the 2023 rule. A rate is the prevailing wage if it is paid to the majority, more than 50 percent, of workers in that classification on similar projects in the area. If no single rate reaches a majority, the rate paid to the greatest number of workers prevails, as long as that group is at least 30 percent. If no rate reaches 30 percent, the prevailing wage is the weighted average of all the rates reported.

The area is normally the county. If there is not enough current data in the county, DOL can look at surrounding counties, then comparable counties in the state, then statewide data. For building and residential rates, DOL generally leaves out data from federal or federally assisted projects unless there is not enough other data; heavy and highway rates do use it.

How is prevailing wage calculated? The DOL survey and the 30 percent rule
Illustrative survey (electricians, one county)What the data showsPrevailing rate under 29 CFR 1.2
Survey A: 40 workers. 24 at $50.00, 10 at $48.00, 6 at $46.0024 of 40 is 60 percent, a majority$50.00, the majority rate
Survey B: 40 workers. 18 at $50.00, 12 at $48.00, 10 at $46.00No majority; 18 of 40 is 45 percent, the largest group and over 30 percent$50.00, the rate paid to the greatest number
Survey C: 10 workers. 2 each at $52, $50, $48, $46 and $44No rate reaches 30 percent; each is 20 percent$48.00 weighted average: ($104 + $100 + $96 + $92 + $88) / 10

Sources: 29 CFR 1.2: Definitions, including prevailing wage; 29 CFR 1.3: Obtaining and compiling wage rate information; 29 CFR 1.7: Scope of consideration

Where prevailing wage rates are published: wage determinations on SAM.gov

Federal prevailing wage rates are published as wage determinations. DOL describes SAM.gov as the single location where federal contracting officers get the appropriate Davis-Bacon and Service Contract Act wage determinations, and the public can search it too. A wage determination lists classifications and rates by type of construction, such as building, residential, heavy and highway, for a county or group of counties.

The contracting agency picks the wage determination and puts it in the bid documents and the contract. Your job is to pay at least those rates for the work your people actually perform. The wage determination in your contract, not the newest one on the website, is usually the one that governs, because a wage determination generally applies for the life of the contract once it is incorporated. Our Davis-Bacon Act requirements guide covers which wage determination applies and when it locks.

State rates come from each state's labor agency, under that state's own law and method. If a job is under a state law, read that state's current schedule for the trade, county and date that apply, and check the bid documents for which schedule the owner incorporated.

Sources: U.S. Department of Labor: Davis-Bacon and Related Acts; 29 CFR 1.6: Use and effectiveness of wage determinations

Base rate plus fringe: what the prevailing wage is made of

Most wage determinations show two numbers for each classification: a basic hourly rate and a fringe benefit rate. You owe both for every hour worked in the classification. You can meet the fringe part by paying into bona fide benefit plans, such as health insurance or a pension or retirement plan, by paying it in cash on the paycheck, or by a mix of the two.

Under 29 CFR 5.5, contributions to bona fide fringe benefit plans count as wages paid. Regular contributions made less often than weekly, but at least quarterly, are treated as made during the week they cover. What you cannot do is count a benefit you do not actually provide, or take more credit per hour than the plan really costs.

When a worker splits time between prevailing wage and private jobs, the hourly credit for a benefit like health insurance usually has to be spread across all hours worked, not just the covered hours. That is called annualization, and it is a common place for fringe credits to go wrong. Our article on Davis-Bacon fringe benefit annualization covers the math.

Sources: 29 CFR 5.5: Contract provisions and related matters

Who pays prevailing wage, and when does it apply?

The employer pays it. Every contractor and subcontractor, at any tier, that has laborers or mechanics working on a covered project must pay them at least the prevailing rate for the work they perform. The prime contractor is responsible for compliance by all of its subcontractors and lower-tier subcontractors, and can be liable for their workers' unpaid wages.

Under federal law, coverage starts with three questions. Is the contract over $2,000? Is it for construction, alteration or repair, including painting and decorating? Is it a federal contract, or a project funded or assisted under one of the Related Acts? If all three are yes, Davis-Bacon labor standards apply. State laws have their own thresholds, shown in the state table below.

Prevailing wage covers laborers and mechanics: workers whose duties are manual or physical, including those who use tools or perform the work of a trade. It does not cover workers whose duties are mainly mental or managerial. It covers people working on the site of the work, which includes the primary job site, certain dedicated secondary sites, and dedicated nearby support sites like job headquarters, tool yards and batch plants. It applies regardless of any contractual relationship, so calling a worker an independent contractor does not take them out of coverage.

Sources: U.S. Department of Labor: Davis-Bacon and Related Acts; 29 CFR 5.5: Contract provisions and related matters; 29 CFR 5.2: Definitions (laborer or mechanic, site of the work)

Prevailing wage vs minimum wage: what's the difference?

Minimum wage is one floor for nearly all work. Prevailing wage is a set of floors for construction trades on covered public jobs, and it is usually much higher. The federal minimum wage is $7.25 an hour, in effect since July 24, 2009, and many states and cities set higher minimums. A prevailing wage for a skilled trade is often several times that, plus fringe.

Prevailing wage vs minimum wage: what's the difference?
QuestionMinimum wagePrevailing wage
Who sets itCongress under the Fair Labor Standards Act, plus state and local lawsDOL for Davis-Bacon; state labor agencies for state laws
Where it appliesMost jobs, public and privateCovered public or publicly funded construction only
How many ratesOne rate per jurisdictionA rate for each trade, by county and type of construction
Fringe benefitsNot part of the rateA fringe benefit rate is part of the required pay
How it is setBy statuteBy survey of wages paid on similar local projects, or by each state's method
Proof of paymentOrdinary payroll recordsWeekly certified payroll on federal jobs, plus state reports where required

Sources: U.S. Department of Labor: Minimum wage; U.S. Department of Labor: Davis-Bacon and Related Acts

How workers are classified on prevailing wage jobs

You pay by the work performed, not by the worker's title or skill level. A worker who hangs drywall is owed the drywall rate for those hours, even if your company calls them a laborer. Under 29 CFR 5.5, laborers and mechanics must be paid the rate for the classification of work actually performed, without regard to skill, except for registered apprentices.

A worker who does more than one kind of work in a day can be paid at each classification's rate for the time spent in it, but only if your payroll records accurately show the time in each classification. Without those records, the split-rate method is not available.

If your contract's wage determination has no classification for work you need, you do not pick a rate yourself. The contracting officer sends a conformance request to DOL, and the approved rate must be paid from the first day of work in that classification, even if approval comes later. Apprentices can be paid less than the journeyworker rate only if they are individually registered in a registered apprenticeship program and the ratio is respected.

Sources: 29 CFR 5.5: Contract provisions and related matters

How overtime works on prevailing wage jobs

Davis-Bacon itself sets hourly rates, not overtime. Overtime comes from other laws. On prime contracts over $100,000, the Contract Work Hours and Safety Standards Act requires time and a half for hours over 40 in a workweek, and the Fair Labor Standards Act may also apply.

The premium is figured on the basic hourly rate, not on the fringe. Under 29 CFR 5.32, the contractor's fringe contributions, or fringe paid as cash in lieu, can be left out of the regular rate used for overtime, as long as that rate is not less than the basic hourly rate in the wage determination. You still owe the fringe amount for every hour, straight time and overtime, but not at time and a half.

If you violate the contract overtime clause, the clause text in 29 CFR 5.5(b)(2) adds liquidated damages of $33 for each worker for each day they worked over 40 hours in the week without the required overtime, on top of the back wages.

Sources: U.S. Department of Labor: Davis-Bacon and Related Acts; 29 CFR 5.32: Overtime payments; 29 CFR 5.5: Contract provisions and related matters

Worked example: a prevailing wage paycheck, line by line

Illustrative numbers. An electrician works 44 hours in one week on a federal building contract worth more than $100,000, so overtime applies after 40 hours. The wage determination rate is $52.40 basic plus $28.15 fringe. The employer pays health and retirement contributions worth $18.00 an hour after annualization, and pays the rest of the fringe in cash.

Total required value for the week is 44 hours times $80.55, which is $3,544.20, plus the $104.80 overtime premium, for $3,649.00. The worker gets $2,857.00 in cash wages on the check, and $792.00 goes to the plans. The two add to $3,649.00, so the week is fully paid.

Worked example: a prevailing wage paycheck, line by line
LineArithmeticAmount
Straight time on the basic rate44 hours x $52.40$2,305.60
Overtime premium on the basic rate4 hours x ($52.40 x 0.5 = $26.20)$104.80
Fringe owed for all hours44 hours x $28.15$1,238.60
Fringe credit from bona fide plans44 hours x $18.00$792.00
Fringe shortfall paid in cash44 hours x ($28.15 minus $18.00 = $10.15)$446.60
Cash wages on the paycheck$2,305.60 + $104.80 + $446.60$2,857.00
Total compensation for the week$2,857.00 + $792.00$3,649.00

Sources: 29 CFR 5.5: Contract provisions and related matters; 29 CFR 5.32: Overtime payments

Certified payroll: how you prove you paid prevailing wage

On Davis-Bacon jobs, each contractor and subcontractor submits a certified payroll every week in which covered work is performed. It shows each worker's classification, hours each day, rates, deductions and pay, with a signed Statement of Compliance. DOL's Optional Form WH-347 is one accepted format; any format with the required information works, and electronic systems are allowed if they use a legally valid electronic signature.

The weekly copy uses an identifying number such as the last four digits of the worker's Social Security number, not the full number or home address. You still keep the full details in your own records and must provide them if the agency or DOL asks. The prime is responsible for submitting the subs' payrolls, so a missing week from a lower-tier sub is the prime's problem too.

State laws have their own reporting. California uses its eCPR system, Oregon has its own WH-38 form, and other states have their own portals or forms. Our state certified payroll guides at buildalytic.com/certified-payroll/<state> cover the states marked in the table below.

Sources: 29 CFR 5.5: Contract provisions and related matters

What happens if you don't pay prevailing wage?

The first consequence is back pay. A contractor that underpays owes the difference to each worker, plus interest on the underpayment under the current contract clauses. The agency can withhold money from contract payments to cover it, and the current clause lets that withholding reach other federal or federally assisted contracts held by the same prime contractor. DOL's claim on withheld funds comes ahead of sureties, bankruptcy trustees and assignees.

Serious violations can lead to debarment. A contractor found to have disregarded its obligations to workers or subcontractors, along with its responsible officers and related firms, can be barred from federal and federally assisted contracts for 3 years, with names published on SAM.gov. Falsifying a certified payroll can bring civil or criminal prosecution under federal false statement and false claims laws.

Retaliating against a worker who asks about pay, files a complaint or talks to an investigator is unlawful under the current contract clauses. State laws carry their own penalties, so read the statute for any state job.

Sources: 29 CFR 5.5: Contract provisions and related matters; 29 CFR 5.12: Debarment proceedings

Which states have prevailing wage laws? A 50-state table

This table follows the Department of Labor's state prevailing wage table, which DOL says was last revised January 1, 2023. State laws change, and Michigan is one example: DOL's table lists it as repealed in 2018, but Michigan restored prevailing wage with Public Act 10 of 2023, effective February 13, 2024. Treat the thresholds as a starting point and confirm the current statute with the state labor agency before you bid.

Thresholds are the contract or project amounts DOL lists for coverage. "No threshold" means DOL lists none. Federal Davis-Bacon still applies in every state on federally funded or assisted work over $2,000, including states with no state law.

Which states have prevailing wage laws? A 50-state table
StateState prevailing wage lawThreshold or statusBuildalytic state guide
AlabamaNoRepealed 1980buildalytic.com/certified-payroll/alabama
AlaskaYes$25,000buildalytic.com/certified-payroll/alaska
ArizonaNoInvalidated 1980; repealed by referendum 1984buildalytic.com/certified-payroll/arizona
ArkansasNoRepealed 2017buildalytic.com/certified-payroll/arkansas
CaliforniaYes$1,000 (higher thresholds under Labor Code 1771.5)buildalytic.com/certified-payroll/california
ColoradoYes$500,000 for state-funded public projects; not CDOT projectsbuildalytic.com/certified-payroll/colorado
ConnecticutYes$1,000,000 new construction; $100,000 remodelingbuildalytic.com/certified-payroll/connecticut
DelawareYes$500,000 new construction; $45,000 alteration and repairbuildalytic.com/certified-payroll/delaware
FloridaNoRepealed 1979buildalytic.com/certified-payroll/florida
GeorgiaNoNo state law listedbuildalytic.com/certified-payroll/georgia
HawaiiYes$2,000buildalytic.com/certified-payroll/hawaii
IdahoNoRepealed 1985buildalytic.com/certified-payroll/idaho
IllinoisYesNo thresholdbuildalytic.com/certified-payroll/illinois
IndianaNoRepealed 2015buildalytic.com/certified-payroll/indiana
IowaNoNo state law listedbuildalytic.com/certified-payroll/iowa
KansasNoRepealed 1987buildalytic.com/certified-payroll/kansas
KentuckyNoRepealed 2017buildalytic.com/certified-payroll/kentucky
LouisianaNoRepealed 1988buildalytic.com/certified-payroll/louisiana
MaineYes$50,000buildalytic.com/certified-payroll/maine
MarylandYes$250,000, with conditions on state fundingbuildalytic.com/certified-payroll/maryland
MassachusettsYesNo thresholdbuildalytic.com/certified-payroll/massachusetts
MichiganYesRepealed in 2018; restored by Public Act 10 of 2023, effective February 13, 2024buildalytic.com/certified-payroll/michigan
MinnesotaYes$25,000 multiple trades; $2,500 single tradebuildalytic.com/certified-payroll/minnesota
MississippiNoNo state law listedbuildalytic.com/certified-payroll/mississippi
MissouriYes$75,000buildalytic.com/certified-payroll/missouri
MontanaYes$25,000buildalytic.com/certified-payroll/montana
NebraskaYesNo thresholdbuildalytic.com/certified-payroll/nebraska
NevadaYes$100,000buildalytic.com/certified-payroll/nevada
New HampshireNoRepealed 1985buildalytic.com/certified-payroll/new-hampshire
New JerseyYes$2,000 (table also lists $16,263 and a $50,000 aggregate for maintenance and repair)buildalytic.com/certified-payroll/new-jersey
New MexicoYes$60,000buildalytic.com/certified-payroll/new-mexico
New YorkYesNo thresholdbuildalytic.com/certified-payroll/new-york
North CarolinaNoNo state law listedbuildalytic.com/certified-payroll/north-carolina
North DakotaNoNo state law listedbuildalytic.com/certified-payroll/north-dakota
OhioYes$250,000 new construction; $75,000 remodeling (lower for some road work)buildalytic.com/certified-payroll/ohio
OklahomaNoInvalidated 1995buildalytic.com/certified-payroll/oklahoma
OregonYesNo threshold; major renovations count only over $50,000buildalytic.com/certified-payroll/oregon
PennsylvaniaYes$25,000buildalytic.com/certified-payroll/pennsylvania
Rhode IslandYes$1,000buildalytic.com/certified-payroll/rhode-island
South CarolinaNoNo state law listedbuildalytic.com/certified-payroll/south-carolina
South DakotaNoNo state law listedbuildalytic.com/certified-payroll/south-dakota
TennesseeYes$50,000, highway construction onlybuildalytic.com/certified-payroll/tennessee
TexasYesNo thresholdbuildalytic.com/certified-payroll/texas
UtahNoRepealed 1981buildalytic.com/certified-payroll/utah
VermontYes$100,000, or at least 50% capital funded and over $200,000buildalytic.com/certified-payroll/vermont
VirginiaYes$250,000, with conditionsbuildalytic.com/certified-payroll/virginia
WashingtonYesNo threshold ($25,000 for state college and university construction)buildalytic.com/certified-payroll/washington
West VirginiaNoRepealed 2016buildalytic.com/certified-payroll/west-virginia
WisconsinNoRepealed 2017buildalytic.com/certified-payroll/wisconsin
WyomingYes$100,000buildalytic.com/certified-payroll/wyoming

Sources: U.S. Department of Labor: State prevailing wage laws; Michigan LEO: Prevailing wage rates for State of Michigan funded projects (Eaton County, 2026)

What are prevailing wage jobs?

Prevailing wage jobs are construction jobs on covered public work: federal buildings, highways and bridges built with federal aid, water and sewer plants built with federal grants or loans, public housing and some assisted housing, and schools, courthouses and other state or local public works under a state law. Workers on these jobs are paid at least the rate for their trade in that area.

For a contractor, the work is the same as private work, but the paperwork is not. You need the right wage determination, correct classifications, fringe records, weekly certified payroll, the required posters on site, and payroll from every sub. Contractors who plan for that up front bid more accurately and avoid withheld payments later.

Common prevailing wage mistakes, and how to avoid them

Most problems come from a short list of errors. Each one is avoidable with a weekly check before the payroll is certified.

Common prevailing wage mistakes, and how to avoid them
MistakeWhy it is a problemHow to avoid it
Paying by job title instead of work performedRates follow the work, so a laborer doing carpentry is owed the carpenter rateRecord hours by classification each day
Using the wrong wage determinationThe incorporated one governs, and the wrong county or type can understate ratesPull the wage determination number from the contract, not a web search
Taking full fringe credit for a worker who also works private jobsCredit for most benefits must be annualized over all hoursCalculate the hourly credit on total annual hours
Paying overtime premium on fringe, or skipping fringe on overtime hoursThe premium is on the basic rate, but fringe is owed for every hourSeparate the base, premium and fringe lines on the check
Apprentice rates for unregistered workers or over the ratioThose workers must get the full rate for the work performedKeep registration and ratio records on file for each job
Missing or late sub payrollsThe prime is responsible for subs and payments can be withheldTrack each sub's weekly payroll and follow up the same week
Wage determination and poster not postedBoth must be posted where workers can easily see themPost them at mobilization and replace them if they get damaged

Sources: 29 CFR 5.5: Contract provisions and related matters

How Buildalytic helps with prevailing wage

Buildalytic Certified Payroll supports payroll collection, review against the wage determination, correction records and workforce reporting. Brody calls, texts and emails subcontractors' payroll contacts about missing weeks and corrections and writes the results back to the job record. Your authorized team reviews and certifies the records; a received or reviewed status in Buildalytic is not a government filing receipt or a guarantee of compliance. Certified payroll is separately scoped and quoted.

Common questions

What is prevailing wage in simple terms?

It is the minimum hourly pay, usually a base rate plus a fringe benefit rate, that contractors must pay each trade on covered public construction in a given area. Federal rates come from DOL wage surveys; state rates come from each state's labor agency.

How is prevailing wage calculated?

For Davis-Bacon, DOL surveys wages paid on similar local projects. The rate paid to more than 50 percent of workers in a classification prevails. Without a majority, the most common rate prevails if at least 30 percent earn it. Otherwise DOL uses a weighted average.

Is prevailing wage the same as union wage?

Not always. Where a collectively bargained rate is paid to a majority, or to the largest group of at least 30 percent, of surveyed workers, that rate prevails. Otherwise the rate that meets the test prevails, or a weighted average of all reported rates, union and non-union.

Who pays prevailing wage?

The employer of each laborer or mechanic on the covered job, meaning the prime contractor and every subcontractor at any tier. The prime contractor is also responsible for its subcontractors' compliance and can be liable for their workers' unpaid wages.

Does prevailing wage apply to private projects?

Generally no. Federal prevailing wage applies to federal contracts and to projects funded or assisted under the Davis-Bacon Related Acts. State laws apply to public works. A privately owned project can be covered if it receives covered public funding, so check the funding terms.

Do you have to pay prevailing wage on overtime?

You owe the basic rate and the fringe for every hour. Where overtime laws apply, the time-and-a-half premium is calculated on the basic hourly rate. Fringe contributions are not multiplied by 1.5, but the full fringe amount is still owed for overtime hours.

What is the difference between prevailing wage and minimum wage?

Minimum wage is a single floor for most jobs; the federal rate is $7.25 an hour. Prevailing wage is a trade-by-trade, county-by-county set of rates, plus fringe, that applies only to covered public construction and is usually far higher.

Which states don't have a prevailing wage law?

DOL's table, last revised January 1, 2023, names 22 states without a state law, such as Florida, Georgia, North Carolina, Arizona and Indiana. Michigan is on that list but now publishes state rates. Federal Davis-Bacon still applies to covered federal work in every state.

Sources and editorial notes

Prepared with AI assistance. Reference date: 2026-11-17. Worked examples are illustrative and are not customer results. Product details can change; confirm the current scope and terms before rollout.

How we prepare and update field notes
See it on your workflow

Check every payroll against the right wage determination.

Bring one prevailing wage job and its wage determination. See each classification, rate and fringe line checked before the payroll is certified.

Start with the call, text or record your team already handles. Review the expected outcome and the human handoff before choosing a rollout.

See prevailing wage compliance Explore the relevant capability