Prevailing wage laws by state.

Every state, DC and the territories: whether a law applies, thresholds, filing and penalties, filterable.

No sign-up. What you type stays in your browser.

57 of 57
JurisdictionState construction prevailing wage lawCovered projectsCertified payrollWhere to filePenalties
FederalFederalContracts over $2,000 for construction, alteration or repair of public buildings or public works that are federally funded or assisted, including Related Act projects.Weekly, for each week of covered work, with a signed Statement of Compliance. Form WH-347 is optional. Use a worker identifier such as the last four SSN digits, never the full SSN.The contracting agency when it is a party to the contract. Otherwise the applicant, sponsor or owner, which forwards payroll to the federal funding agency.Withholding of contract funds for back wages, contract termination, and debarment for 3 years (29 CFR 5.12). Failure to submit or produce records can be grounds for debarment.
AlabamaNoNo state prevailing wage requirement in Alabama. Only federally funded or assisted construction contracts over $2,000 carry Davis-Bacon wage rules.Not required by state law. Davis-Bacon contracts require weekly certified payroll with a signed statement of compliance. Form WH-347 is optional.No state filing. On federal jobs, file with the federal contracting agency or the owner or sponsor named in the contract.None under state prevailing wage law. Davis-Bacon violations can bring withholding, back wages, contract termination, and debarment.
AlaskaYesPublic construction contracts over $25,000 for the state or a political subdivision. Every contractor and subcontractor on the contract must pay the prevailing rate.Before the Friday of every second week, as a sworn filing with full worker details, plus state Form 07-6058 Statement of Compliance with an original signature.The regional Wage and Hour office, by mail, hand delivery, or the LSS-Online Filing Services upload tool on myAlaska. Email is not accepted.Misdemeanor with a fine of $100 to $1,000, 10 to 90 days in jail, or both, each day a separate offense. Listed violators are barred from public construction for 3 years.
American SamoaNoFederally assisted construction is covered when a Related Act applies, such as the Territorial Highway Program under 23 U.S.C. 165.Weekly, for each week covered work is done. Form WH-347 is optional; any format with the same data and a signed Statement of Compliance works.The federal agency if it is a party to the contract; otherwise the applicant, sponsor, owner, or territorial agency named in the contract, which forwards it.Federal Related Acts and FLSA remedies, including back wages. No territorial penalty confirmed.
ArizonaNoNo state prevailing wage requirement in Arizona. Only federally funded or assisted construction contracts over $2,000 carry Davis-Bacon wage rules.Not required by state law. Davis-Bacon contracts require weekly certified payroll with a signed statement of compliance. Form WH-347 is optional.No state filing. On federal jobs, file with the federal contracting agency or the owner or sponsor named in the contract.None under state prevailing wage law. Davis-Bacon violations can bring withholding, back wages, contract termination, and debarment.
ArkansasNoNo state prevailing wage requirement in Arkansas. Only federally funded or assisted construction contracts over $2,000 carry Davis-Bacon wage rules.Not required by state law. Davis-Bacon contracts require weekly certified payroll with a signed statement of compliance. Form WH-347 is optional.No state filing. On federal jobs, file with the federal contracting agency or the owner or sponsor named in the contract.None under state prevailing wage law. Davis-Bacon violations can bring withholding, back wages, contract termination, and debarment.
CaliforniaYesPublic works paid in whole or part with public funds. Registration and eCPR filing do not apply to projects of $25,000 or less for construction or $15,000 or less for maintenance.Each contractor and subcontractor submits eCPRs at least monthly: every 30 days while work is performed and within 30 days after the final day of work. Use the online form or V2 XML.DIR Public Works Website Services. Exempt: projects monitored by the Caltrans, City of Los Angeles, LAUSD and County of Sacramento LCPs, and qualifying project labor agreements.Failing to file eCPRs: $100 per day, up to $5,000 per project. Late registration penalties of $400 or $2,000; two violations in 12 months can bring disqualification for up to 12 months.
ColoradoYesState agency public project contracts of $500,000 or more and their subcontractors. Federally funded projects, CDOT contracts, and city, county, and school district work are not covered.Weekly. Each contractor and subcontractor enters and certifies payroll in LCPtracker with a fringe benefit statement and deduction consents.LCPtracker. The prime approves subcontractor payrolls, then the agency project manager accepts or rejects them.Back pay and fines up to $25,000 per willful violation. Courts award double the underpayment plus interest. DPA can debar contractors with 3 or more willful violations in 5 years.
ConnecticutYesState and political subdivision public works of $1 million or more for new construction and $100,000 or more for remodeling, alteration, or repair. Some offsite fabrication and DECD funded projects are covered.Monthly, as a complete copy of weekly records with a signed statement of compliance, using Form WWS-CPI or an equivalent.The contracting agency, or DECD or the project developer where those sections apply, by mail, email, or another accepted method.Knowingly filing a false certified payroll or failing to file is a class D felony, up to $5,000, 5 years in prison, or both. Civil penalties are $5,000 per violation. Debarment up to 3 years.
DelawareYesState or subdivision public works with any state funds, over $500,000 for new construction or over $45,000 for alteration, repair, renovation, rehabilitation, demolition, or reconstruction.Weekly sworn payroll on the state payroll form, with fringe benefit documentation.The awarding agency, or as the contract directs.Civil penalty of $1,000 to $5,000 per violation. A repeat violation within 2 years brings a 3 year bar. Workers can recover treble the underpayment and attorney's fees.
District of ColumbiaYesDistrict and federal construction contracts over $2,000. First Source applies to projects with $300,000 or more in District assistance. The Living Wage Act covers District contracts of $100,000 or more.Weekly, with a signed Statement of Compliance. Form WH-347 is optional. First Source projects also report certified payrolls monthly from all subcontractors.Weekly payrolls go to the contracting agency. First Source reporting goes through the DOES First Source online system and LCPtracker, as the agreement directs.Davis-Bacon: withholding, termination, three year debarment. First Source: fine of 5 percent of labor costs for willful breach or missing reports, and debarment up to 5 years for a second violation.
FloridaNoNo state coverage. Davis-Bacon covers federally funded or assisted construction over $2,000.Not required by state law. On Davis-Bacon work, payroll is due weekly with a signed Statement of Compliance. Form WH-347 is optional.On Davis-Bacon work, to the federal agency if it is a party to the contract, otherwise to the applicant, sponsor, or owner, which forwards them.No state penalties. On Davis-Bacon work, violations can bring withholding of payments, contract termination, and debarment for three years.
GeorgiaNoNo state coverage. Davis-Bacon covers federally funded or assisted construction over $2,000. On DCA CDBG projects it covers the entire project.Not required by state law. On Davis-Bacon work, payroll is due weekly with a signed Statement of Compliance. Form WH-347 is optional.On federal contracts, to the agency. On DCA CDBG projects, all payrolls go to the grant recipient, usually the city or county.No state penalties. On Davis-Bacon work, violations can bring withholding of payments, contract termination, and debarment for three years.
GuamNoGovernment of Guam contracts for services, for workers who directly deliver the contracted service. Federally assisted construction is covered when a Related Act applies.Weekly, for each week covered work is done. Form WH-347 is optional; any format with the same data and a signed Statement of Compliance works.The federal agency if it is a party to the contract; otherwise the applicant, sponsor, owner, or territorial agency named in the contract, which forwards it.5 GCA 5803: $100 to $1,000 per day until corrected, plus back wages and benefits. 5 GCA 5804: up to one year of probation barring Government of Guam awards.
HawaiiYesState and county public works construction over $2,000, however procured or financed. Applies with federal funds if the State or a county is the contracting agency.Weekly, certified, with a fringe benefit reporting form. No required format. DAGS offers an optional form. The general contractor submits all subcontractor payrolls.To the governmental contracting agency.First violation: 25 percent of back wages or $250 per offense up to $2,500. Third violation: double back wages and three year suspension. Interference: $10,000 per project plus $1,000 per day.
IdahoNoNo state coverage. Davis-Bacon covers federally funded or assisted construction over $2,000.Not required by state law. On Davis-Bacon work, payroll is due weekly with a signed Statement of Compliance. Form WH-347 is optional.On Davis-Bacon work, to the federal agency if it is a party to the contract, otherwise to the applicant, sponsor, or owner, which forwards them.No state penalties. On Davis-Bacon work, violations can bring withholding of payments, contract termination, and debarment for three years.
IllinoisYesPublic works built or paid for wholly or in part with public funds, including projects financed with state bonds, grants or loans. Applies to all contractors and subcontractors, union or not.Monthly, by the 15th, for the prior month in which work took place. Each filing carries a signed statement that the records are true and rates meet the prevailing rate.IDOL's Certified Transcript of Payroll Portal, using an Illinois Public ID account. A new Excel import template took effect July 1, 2025.Up to $1,000 for a first failure to file and up to $2,000 for a repeat. Willfully false payroll is a Class A misdemeanor; two violations in five years can bring a four year debarment.
IndianaNoNo state coverage. Davis-Bacon covers federally funded or assisted construction over $2,000. Old common wage contracts over $350,000 awarded before July 1, 2015 remain enforceable.Not required by state law. On Davis-Bacon work, payroll is due weekly with a signed Statement of Compliance. Form WH-347 is optional.On Davis-Bacon work, to the federal agency if it is a party to the contract, otherwise to the applicant, sponsor, or owner, which forwards them.No state penalties. On Davis-Bacon work, violations can bring withholding of payments, contract termination, and debarment for three years.
IowaNoNo state coverage. Davis-Bacon covers federally funded or assisted construction over $2,000.Not required by state law. On Davis-Bacon work, payroll is due weekly with a signed Statement of Compliance. Form WH-347 is optional.On Davis-Bacon work, to the federal agency if it is a party to the contract, otherwise to the applicant, sponsor, or owner, which forwards them.No state penalties. On Davis-Bacon work, violations can bring withholding of payments, contract termination, and debarment for three years.
KansasNoNo state coverage. Davis-Bacon covers federally funded or assisted construction over $2,000.Not required by state law. On Davis-Bacon work, payroll is due weekly with a signed Statement of Compliance. Form WH-347 is optional.On Davis-Bacon work, to the federal agency if it is a party to the contract, otherwise to the applicant, sponsor, or owner, which forwards them.No state penalties. On Davis-Bacon work, violations can bring withholding of payments, contract termination, and debarment for three years.
KentuckyNoNo state coverage. Davis-Bacon covers federally funded or assisted construction over $2,000.Not required by state law. On Davis-Bacon work, payroll is due weekly with a signed Statement of Compliance. Form WH-347 is optional.On Davis-Bacon work, to the federal agency if it is a party to the contract, otherwise to the applicant, sponsor, or owner, which forwards them.No state penalties. On Davis-Bacon work, violations can bring withholding of payments, contract termination, and debarment for three years.
LouisianaNoNo state coverage. Only federally funded or assisted construction over $2,000 requires prevailing wages under Davis-Bacon.Not required by state law. Federal Davis-Bacon work only: weekly certified payroll with a signed Statement of Compliance. Form WH-347 is optional.Federal Davis-Bacon work only: the federal agency, or the applicant, sponsor or owner that passes payrolls to the federal agency.No state penalties. On Davis-Bacon work, the agency can withhold contract payments for back wages, and violators can be debarred for up to 3 years.
MaineYesPublic works funded in whole or part by state funds specific to the project with a contract of $50,000 or more. Also state-assisted energy projects of 2 megawatts or more bid on or after January 1, 2023.Each payroll period, on the MDOL Certified Payroll Form or equivalent, with a signed Statement of Compliance. Section 1311 also requires a monthly copy of the wage record.To the general contractor and the letting agency (public authority), or to the state agency giving assistance on an assisted project.Willful violations bring a forfeiture of at least $250. Underpaid workers recover the shortfall, an equal penalty and attorney fees. Survey refusals draw $250, $500, then $1,000 fines.
MarylandYesConstruction contracts of $250,000 or more with any State funding when a State unit contracts, or 25 percent State funding when a political subdivision contracts. Mechanical service contracts are covered at $2,500.Submit electronically within 14 calendar days after the end of each payroll period. Use WH-347 or an equivalent. The prime certifies and submits its own and its subcontractors' site payrolls.The Prevailing Wage Portal on the Department of Labor website. Contractors must register in the portal before submitting.$10 per calendar day for late payroll and possible payment holds. $20 per day per underpaid worker; increased liquidated damages of $250 per worker per day for deliberate violations.
MassachusettsYesPublic construction by the Commonwealth, counties, cities, towns, districts, and authorities. There is no dollar threshold.Weekly, by every contractor and subcontractor, with a signed statement that the records are correct and show the rates paid.The awarding authority, by first class mail or email. Do not send weekly payrolls to DLS.Willful violations carry fines up to $25,000 and up to 1 year in jail for a first offense. Civil citations up to $25,000 per violation, stop work orders, and debarment can apply.
MichiganYesState projects sponsored or financed in whole or part by the state, with no dollar threshold. Includes solar, wind and storage projects of 2 megawatts or more. Davis-Bacon contracts are exempt.Within 10 days after each pay period ends, with an electronic signature attesting it is complete and accurate.LEO's online certified payroll database, reached through LCPtracker, since April 2, 2026. Contractors already reporting to MDOT on a state project are exempt.Civil fine up to $5,000. LEO may add up to $5,000 per violation plus 10 percent. Contractors and subcontractors are jointly and severally liable. Registration can be suspended or revoked.
MinnesotaYesProjects financed in whole or part by state funds, including grants and loans. Exempt if under $2,500 with one trade, or $25,000 or less with more than one trade.Every two weeks, signed under oath by an owner or officer, using the DLI form or equivalent. Contracts require payrolls within 14 days after each pay period.To the contracting authority and the project owner.Underpayment is a misdemeanor, up to $700 and 90 days per day of violation. Records fines reach $1,000 per failure and $5,000 for repeats. DLI can order back wages and withholding.
MississippiNoNo state coverage. Only federally funded or assisted construction over $2,000 requires prevailing wages under Davis-Bacon.Not required by state law. Federal Davis-Bacon work only: weekly certified payroll with a signed Statement of Compliance. Form WH-347 is optional.Federal Davis-Bacon work only: the federal agency, or the applicant, sponsor or owner that passes payrolls to the federal agency.No state penalties. On Davis-Bacon work, the agency can withhold contract payments for back wages, and violators can be debarred for up to 3 years.
MissouriYesPublic works construction by or for a public body when the estimate or accepted bid is over $75,000. Maintenance work is excluded. Projects cannot be split to get under the threshold.Submit certified payroll records showing each worker's classification, hours and rate. Form LS-57 is available. The statute sets no frequency, so follow the contract.To the public body running the project. An Affidavit of Compliance (PW-4) goes to the public body before final payment.$100 per worker per day underpaid. OSHA 10 violations cost $2,500 plus $100 per untrained employee per day. The public body withholds the amounts. The Division keeps a debarment list.
MontanaYesPublic works contracts for construction or nonconstruction services over $25,000 let by the state, a county, a city, a school district or another political subdivision.A signed weekly payroll affirming correct classifications and rates. Cash fringe is shown separately. The department may demand certified copies when a complaint is filed.As the contract requires. On a complaint, give payroll records to the department within 5 days. MDT uses its own electronic payroll system.Back wages plus $25 per day to workers. Up to 20 percent of unpaid wages and fringe, plus fees and costs. Other violations bring $1,000 fines, or $10,000 for gross negligence.
NebraskaNoState and local public works contracts, unless the authority's contracts already set hours, pay and conditions. Davis-Bacon covers federally funded work over $2,000.Not required by state law. Federal Davis-Bacon work only: weekly certified payroll with a signed Statement of Compliance. Form WH-347 is optional.No state filing. Bidders file a fair labor standards compliance statement with the awarding authority. Davis-Bacon payrolls go to the federal agency or the sponsor.No fines. A low bidder shown at a public hearing to violate fair labor standards can be disqualified. Davis-Bacon withholding and debarment apply on federal work.
NevadaYesPublic works paid in whole or part with public money estimated at $100,000 or more. Units cannot be split off. Also certain public utility pipeline and 50 megawatt generation projects.A monthly record due 15 days after month end, with a signed statement of compliance and the PWP number. File a nonperformance report for months with no work.To the awarding public body. Subcontractors may route reports through the prime by the 10th. Do not send to the Labor Commissioner unless asked.$20 to $50 per worker per day for underpayment or late reports, capped at $1,000 then $5,000 for late reports. Apprentice penalties up to $75,000 or disqualification. Misdemeanor.
New HampshireNoNo state coverage. Only federally funded or assisted construction over $2,000 needs prevailing wages under Davis-Bacon.Not required by the state. On Davis-Bacon work, submit certified payroll weekly with a signed Statement of Compliance. Form WH-347 is optional.On Davis-Bacon work, payrolls go to the federal agency if it is a party to the contract, otherwise to the applicant, sponsor or owner that keeps the records.No state prevailing wage penalties. Davis-Bacon violations can bring withholding, back wages and debarment. Falsifying a Statement of Compliance can lead to civil or criminal prosecution.
New JerseyYesPublic work paid in whole or part with public funds. Thresholds: $19,375 for contracts awarded by a municipality (from July 1, 2024) and $2,000 for other public bodies.For each payroll period, within 10 days of the date wages were paid, using the MW-562 certification or its Wage Hub equivalent.Both the awarding public body and the Department through the NJ Wage Hub (njwages.nj.gov). Wage Hub filing does not replace delivery to the public body.Administrative penalties up to $2,500 for a first violation and $5,000 for each later one. Stop work order violations: $5,000 per day. Debarment for three years.
New MexicoYesContracts or projects over $60,000 that the state or a political subdivision is party to, for construction, alteration, demolition or repair, including painting and decorating, of public buildings, works or roads.Certified weekly payrolls, updated weekly, with a statement of compliance and fringe disbursement statement. Copies go to the contracting agency monthly and to the director on request.Send payroll copies to the contracting agency. The prime contractor submits all subcontractor payrolls. Public works paperwork is handled in the online Public Works and Apprenticeship Application (PWAA).Withholding and termination of the right to proceed. Willful underpayment costs $100 per worker per day, and triple unpaid wages if over $500. Registration can be suspended or revoked, and willful violators are debarred.
New YorkYesPublic work where a public agency is a party, the work is construction-like and publicly funded, and its primary purpose is public benefit. Certain covered private projects are also included.Submit electronically at least once every 30 days while work is performed and within 30 days after the last day of work. Required for work from January 1, 2026; report weeks with no work.DOL Certified Payroll portal (MPWR) with a NY.gov account. NYC public work and NYC permitted roadway excavation use the city's own database.$100 per day after a 14 day grace period for late electronic payroll, though DOL is not issuing these fines yet. Unregistered work: up to $1,000. Underpayments: interest up to 16% and penalty up to 25%.
North CarolinaNoNo state coverage. Only federally funded or assisted construction over $2,000 needs prevailing wages under Davis-Bacon.Not required by the state. On Davis-Bacon work, submit certified payroll weekly with a signed Statement of Compliance. Form WH-347 is optional.On Davis-Bacon work, payrolls go to the federal agency if it is a party to the contract, otherwise to the applicant, sponsor or owner that keeps the records.No state prevailing wage penalties. Davis-Bacon violations can bring withholding, back wages and debarment. Falsifying a Statement of Compliance can lead to civil or criminal prosecution.
North DakotaNoNo state coverage. Only federally funded or assisted construction over $2,000 needs prevailing wages under Davis-Bacon.Not required by the state. On Davis-Bacon work, submit certified payroll weekly with a signed Statement of Compliance. Form WH-347 is optional. NDDOT federal-aid projects require weekly electronic filing.NDDOT federal-aid projects, including city and county projects, file in LCPtracker. Paper is not accepted, and payroll counts as submitted only after the prime's Prime Approver approves it.No state prevailing wage penalties. Davis-Bacon violations can bring withholding, back wages and debarment. Falsifying a Statement of Compliance can lead to civil or criminal prosecution.
Northern Mariana IslandsNoFederal construction contracts over $2,000 for public buildings or public works, plus federally assisted projects covered by a Related Act.Weekly, for each week covered work is done. Form WH-347 is optional; any format with the same data and a signed Statement of Compliance works.The federal agency if it is a party to the contract; otherwise the applicant, sponsor, owner, or territorial agency named in the contract, which forwards it.Federal remedies: withholding, back wages, contract termination, and debarment under 29 CFR Part 5. No CNMI territorial penalty confirmed.
OhioYesPublic improvements over $250,000 new or $75,000 for repair or remodeling. Road, street, sewer and ditch work over $101,201 new or $30,320 repair. School and some federally funded projects are exempt.First certified payroll within two weeks after the initial pay date, then monthly. Contracts of four months or less file weekly after the first report.The prevailing wage coordinator named by the public authority for the contract.Underpaid workers get the difference plus 25 percent, and the employer pays the director 75 percent of the difference. Intentional violations bring a 1 year bar, or 3 years for a second within five years.
OklahomaNoNo state coverage. Only federally funded or assisted construction over $2,000 needs prevailing wages under Davis-Bacon.Not required by the state. On Davis-Bacon work, submit certified payroll weekly with a signed Statement of Compliance. Form WH-347 is optional.On Davis-Bacon work, payrolls go to the federal agency if it is a party to the contract, otherwise to the applicant, sponsor or owner that keeps the records.No state prevailing wage penalties. Davis-Bacon violations can bring withholding, back wages and debarment. Falsifying a Statement of Compliance can lead to civil or criminal prosecution.
OregonYesPublic works over $50,000 that use funds of a public agency. State law still applies when Davis-Bacon also covers the project.Prepare a certified statement for each week a worker is employed. Use form WH-38 or your own format with the WH-38 certified statement. A WH-347 alone does not satisfy Oregon.Submit to the public agency at least monthly, by the fifth business day of the following month.The agency withholds 25 percent of amounts earned until certified statements are filed. BOLI may assess civil penalties up to $5,000 per violation and list contractors as ineligible.
PennsylvaniaYesPublic work paid in whole or part with public body funds when the total project cost is over $25,000. Projects may not be split to avoid coverage. Maintenance work is excluded.Weekly, by every contractor and subcontractor. L&I publishes form LLC-25, Weekly Payroll Certification, with a statement of compliance notarized on the first and last submissions.The public body that awarded the contract. It must confirm prevailing rates were paid before paying the contractor.False sworn statements are a misdemeanor with a fine up to $2,500, up to 5 years in prison, or both. Intentional violations can bring 3 year debarment.
Puerto RicoNoOE-2022-014: construction contracted by Puerto Rico executive agencies or public corporations and funded wholly or partly with federal recovery funds. Not municipal or private projects.Weekly, for each week covered work is done. Form WH-347 is optional; any format with the same data and a signed Statement of Compliance works. No territorial certified payroll form confirmed.The federal agency if it is a party to the contract; otherwise the applicant, sponsor, owner, or territorial agency named in the contract, which forwards it. DTRH can demand payroll copies during OE-2022-014 investigations.Under OE-2022-014, the agency may withhold invoice payments until underpayment is corrected. DTRH investigates complaints. Federal Related Acts sanctions apply separately.
Rhode IslandYesPublic works contracts over $1,000 with the state, a political subdivision, or a public or quasi-public agency. School transportation service contracts are also covered.Monthly certified copy of payroll for the prior month, on DLT's RI Certified Weekly Payroll form with the RI Statement of Compliance. DOT and road or bridge work may use the federal form.The awarding authority. Records go to DLT within 10 days of a DLT request.Withheld payments and up to $500 per day for late payroll. 12 percent interest and up to triple civil penalty. Debarment 18 to 36 months, or 60 for repeat willful violations. False payroll is a crime.
South CarolinaNoNo state coverage. Only federally funded or assisted construction over $2,000 needs prevailing wages under Davis-Bacon.Not required by the state. On Davis-Bacon work, submit certified payroll weekly with a signed Statement of Compliance. Form WH-347 is optional.On Davis-Bacon work, payrolls go to the federal agency if it is a party to the contract, otherwise to the applicant, sponsor or owner that keeps the records.No state prevailing wage penalties. Davis-Bacon violations can bring withholding, back wages and debarment. Falsifying a Statement of Compliance can lead to civil or criminal prosecution.
South DakotaNoDavis-Bacon covers federally funded construction over $2,000. SDDOT labor provisions also apply to non-federal highway contracts of $100,000 or more.Weekly for each week of work, within seven days after wages are paid, with the current SDDOT Statement of Compliance. Form WH-347 is optional on other federal work.SDDOT projects let on or after June 5, 2019 file electronically through Elation Systems, promotion code SDDOT-19. Other federal projects file with the agency the funding agency names.No state prevailing wage penalties. Davis-Bacon violations can bring withholding, back wages and debarment. Falsifying a Statement of Compliance can lead to civil or criminal prosecution.
TennesseeYesState contracts to build, rebuild, locate, relocate, or repair streets, highways, or bridges. No dollar threshold. There is no state prevailing wage on non-highway construction.No state form or schedule. Contractors furnish the state agency any forms, payroll copies, or other information it requires to show compliance.The state agency that awarded the contract, as its contract specifies.The commission or an underpaid worker can sue on the performance bond. If the bond is breached, the agency can readvertise and relet the contract. The Act sets no fines.
TexasYesConstruction of a public work paid in whole or part from public funds. The pay requirement does not apply to maintenance work or to work done directly by a public utility under a public order.State law sets no certified payroll form or schedule. Each public body's contract controls. The Texas Workforce Commission says the federal WH-347 would suffice.The awarding public body, as its contract specifies.$60 per worker per calendar day of underpayment, payable to the public body (section 2258.023). Failing to keep records is an offense: fine up to $500, up to six months in jail, or both.
US Virgin IslandsSee guideFederally assisted construction is covered when a Related Act applies. Territorial public works coverage not confirmed.Weekly, for each week covered work is done. Form WH-347 is optional; any format with the same data and a signed Statement of Compliance works.The federal agency if it is a party to the contract; otherwise the applicant, sponsor, owner, or territorial agency named in the contract, which forwards it.VIDOL may fine employers up to $2,500 for wage and hour violations. Federal Related Acts sanctions apply separately.
UtahNoNone under state law. Federal contracts over $2,000 and federally assisted projects are covered by Davis-Bacon and Related Acts.Not required by state law. Davis-Bacon work needs weekly certified payroll. Form WH-347 is optional if the same Statement of Compliance is used.On federal jobs, the federal agency if it is a party to the contract. Otherwise the applicant, sponsor, or owner, which forwards it.None under state law.
VermontYesState projects over $100,000, and projects over $200,000 at least 50 percent funded by a capital construction act or the Cash Fund. Agency of Transportation and Forests, Parks and Recreation projects are excluded.Not set by statute. Follow the contract and the awarding agency's instructions.The awarding agency, as the contract requires.Not set in 29 V.S.A. 161. Complaints go to the Department of Labor Wage and Hour Division.
VirginiaYesState-funded public works over $250,000. Local work only where a locality adopts an ordinance. Covered colleges join for contracts of $5 million or more initiated after July 1, 2027.No routine weekly filing. After award, certify each craft's pay scale to DOLI under oath on the Pay Scale Certification form.DOLI Prevailing Wage, by email at prevailingwage@doli.virginia.gov or mail to 6606 West Broad Street, Richmond.Back wages plus 8 percent interest and a bar from bidding until restitution. Willful violations are a Class 1 misdemeanor.
WashingtonYesAny public works project using public funds, with no minimum dollar amount. Includes construction, reconstruction, maintenance and repair.Weekly certified payroll reports filed online at least once a month on every project, required since January 1, 2020 (RCW 39.12.120).L&I's Prevailing Wage Intents and Affidavits (PWIA) system, reached through a My L&I account.$500 civil penalty for each false filing or failure to file or post (RCW 39.12.050). No bidding until paid; a second violation within five years adds a one year bidding ban.
West VirginiaNoNo prevailing wage. The Jobs Act covers public improvements let to contract at $500,000 or more, excluding those funded in whole or part by federal funds.Jobs Act projects must file certified payrolls or comparable records showing employee counts, residence, and occupation. Davis-Bacon work needs weekly certified payroll.Jobs Act records go to the Division of Labor, by the public authority or the employer. Davis-Bacon payroll goes to the contracting or funding agency.Jobs Act: $250 per employee below 75 percent per day after notice, rising to $500 after 14 days. Final payment can be withheld.
WisconsinNoNone under state law. State-funded highway projects advertised after September 23, 2017 are not covered. Federally funded work follows Davis-Bacon.Not required by state law. Davis-Bacon work needs weekly certified payroll. Form WH-347 is optional.On WisDOT federal-aid jobs, the Civil Rights and Compliance System (CRCS). Other federal jobs, the contracting or funding agency.None under state law.
WyomingYesPublic works by the state or a state officer, board, or commission estimated at $100,000 or more. Maintenance and in-house work of $25,000 or less are excluded.No routine filing. On written request, the general contractor must give DWS or the contracting entity payroll reports in a federally certified format showing residency.DWS or the contracting entity, when requested. Otherwise as the public body's contract requires.Willful violations: fine up to $500, up to six months jail, or both. Resident labor violations: up to $1,000 per nonresident per day, capped at 10 percent of the contract.

Summaries from each jurisdiction's labor agency and statutes, reviewed November 2026. Open a guide for sources, filing steps and FAQs. Laws change; confirm with the agency and your contract.

How it works

The rules behind the numbers.

State law plus federal Davis-Bacon

Federal Davis-Bacon applies to federally funded or assisted construction over $2,000 in every state. State laws add their own coverage, rates, filing and penalties for state and local public works.

Filter to what matters to you

Filter by states with or without a law, or search for a state, a filing system or a requirement. Each row links to a full guide with official sources.

Full guide: What is prevailing wage? Meaning, how it's calculated and who pays it

FAQ

Questions people ask

Something else? Ask the team

Which states have prevailing wage laws?

Use the filter to list them. Some states repealed their laws (for example Indiana, Kentucky, Wisconsin and West Virginia), and Michigan restored its law effective February 13, 2024.

Does Davis-Bacon apply in states without a law?

Yes. Federally funded or assisted construction over $2,000 is covered by Davis-Bacon in every state and DC.

Free

Check a whole week of sub payroll, not just one worker.

Send one week of certified payroll and the wage determination. We return an exception report with every rate, fringe, overtime and apprentice issue flagged, free.

Get a free exception report

Check every sub’s payroll, every week, automatically.

Buildalytic collects certified payroll from every tier, checks base, fringe, overtime and classifications against the wage determination, and has Brody chase missing weeks and corrections.

One full Platform plan. No standard setup fee. Start with one supported workflow.

Plan your rollout

Pricing, security reviews, procurement and rollout across your projects and regions.

Build with us

Help build the AI teammate for construction. We're hiring.

Explore careers