Davis-Bacon Act requirements for contractors: a 2026 compliance checklist

Davis-Bacon Act requirements for contractors: the $2,000 threshold, wage determinations, certified payroll, flow-down, withholding and a step-by-step checklist.

By Buildalytic Research Desk20 min read

Editorial scene of a contractor and a payroll administrator reviewing compliance records on a laptop
Illustrative editorial scene. Requirements summarized from 29 CFR parts 1, 3 and 5 and dol.gov, checked November 17, 2026. Not legal advice.
The short answer

The Davis-Bacon Act requires contractors and subcontractors on federally funded or assisted construction contracts over $2,000 to pay laborers and mechanics at least the wage determination's basic rate and fringe for the work performed, at least once a week. They must also post the wage determination and poster, submit weekly certified payrolls with a signed Statement of Compliance, flow the clauses down to every subcontract and keep records for 3 years. Buildalytic Certified Payroll helps collect and review those payrolls.

What to take away

  • Davis-Bacon labor standards apply to covered construction, alteration and repair contracts over $2,000, including painting and decorating.
  • The wage determination incorporated at award or bid opening generally governs the whole contract; later revisions apply only in listed cases.
  • Every contractor and sub files weekly certified payroll with a signed Statement of Compliance, and the prime is responsible for all tiers.
  • Violations can bring back wages with interest, withholding across the prime's other covered contracts, and 3-year debarment.
  • The 2023 rule took effect October 23, 2023; three provisions were enjoined by a federal court on June 24, 2024.

What is the Davis-Bacon Act, and what does it require?

The Davis-Bacon Act is the federal law that sets minimum wages on federal construction. DOL says it requires contractors and subcontractors to pay laborers and mechanics no less than the locally prevailing wages and fringe benefits for similar work in the area, on contracts over $2,000 for the construction, alteration or repair of public buildings or public works. The Davis-Bacon Related Acts extend the same standards to projects the federal government assists through grants, loans, loan guarantees and insurance.

The rules that make the Act work are in Title 29 of the Code of Federal Regulations. Part 1 covers how wage determinations are made and which one applies. Part 3, from the Copeland Act, covers weekly payrolls and kickbacks. Part 5 holds the contract clauses every covered contract must carry, plus enforcement. Those clauses are the real list of Davis-Bacon requirements, and this guide walks through them in the order a contractor meets them, from bid to closeout.

If you are new to the topic, our guide to what prevailing wage is covers the basics and how rates are calculated. This article is the contractor's working checklist.

Sources: U.S. Department of Labor: Davis-Bacon and Related Acts; 29 CFR 5.5: Contract provisions and related matters

The Davis-Bacon threshold: which contracts and projects are covered

The Davis-Bacon threshold is $2,000. Under 29 CFR 5.5, the required clauses go into any contract over $2,000 for the actual construction, alteration or repair, including painting and decorating, of a public building or public work, or of a building or work financed in whole or in part with federal funds or federal guarantees, where one of the covered laws applies. The weekly payroll rule in 29 CFR 3.3 likewise does not apply to contracts of $2,000 or less.

Coverage reaches laborers and mechanics working on the site of the work. That includes the primary construction site, secondary sites where a significant portion of the work is built specifically for the project, and dedicated support sites next to the job, such as job headquarters, tool yards, batch plants and borrow pits. It generally excludes a contractor's permanent home office, branch plants and fabrication shops whose operation does not depend on the particular contract.

A second threshold matters for overtime. On contracts over $100,000, the Contract Work Hours and Safety Standards Act requires time and a half for hours over 40 in a workweek, and adds its own clauses on top of the Davis-Bacon ones.

The Davis-Bacon threshold: which contracts and projects are covered
QuestionIf yesRule
Is the contract over $2,000?Davis-Bacon clauses can apply29 CFR 5.5(a); 29 CFR 3.3(c)
Is it construction, alteration or repair, including painting and decorating?It is the kind of work covered29 CFR 5.5(a)
Is it a federal contract or federally funded or assisted under a Related Act?Davis-Bacon labor standards applyDOL Davis-Bacon and Related Acts page
Is the prime contract over $100,000?CWHSSA overtime clauses also apply29 CFR 5.5(b)
Is the worker a laborer or mechanic on the site of the work?That worker must get at least the wage determination rate29 CFR 5.2

Sources: 29 CFR 5.5: Contract provisions and related matters; 29 CFR 3.3: Certified payrolls; 29 CFR 5.2: Definitions; U.S. Department of Labor: Davis-Bacon and Related Acts

Davis-Bacon wage determinations: general vs project

A Davis-Bacon wage determination is the schedule of minimum basic rates and fringe benefits for each classification on the job. DOL says SAM.gov is the single location contracting officers use to obtain them, and the public can access it. Each one covers a type of construction, such as building, residential, heavy or highway, in a defined area, usually a county.

There are two kinds. A general wage determination is published on the DOL-approved website, has no expiration date, and stays valid until it is revised, superseded or canceled. A project wage determination is issued for one specific project and is effective for 180 calendar days. If it is not incorporated into a contract, or construction has not started, within that window, it is void.

The contracting agency is responsible for choosing the right wage determination and putting it in the bid documents and contract. When a contract covers more than one area, it must include the wage determination for each area, unless a multi-county project determination was obtained. When it involves more than one type of construction that is anticipated to be substantial, it must include one for each type, and the agency designates which work each applies to.

Davis-Bacon wage determinations: general vs project
FeatureGeneral wage determinationProject wage determination
Where it comes fromPublished on the DOL-approved website (SAM.gov)Issued for a specific project on request
ExpirationNone; valid until revised, superseded or canceledEffective 180 calendar days from issue
If not used in timeNot applicableVoid if not incorporated, or construction not started, within 180 days
Agency notice to DOLAgency may use it without notifying the AdministratorRequested from DOL by the agency
RevisionsCan be revised from time to time, including ECI-based updatesCan be revised from time to time

Sources: U.S. Department of Labor: Davis-Bacon and Related Acts; 29 CFR 1.6: Use and effectiveness of wage determinations

Which wage determination applies, and when does it lock?

Once a wage determination is incorporated into a contract, or construction has started where there is no award, it generally applies for the life of the contract. Revisions, which 29 CFR 1.6 says include modifications of some or all rates as well as full re-issues, matter only until that point. A revision issued before award is generally effective. On sealed bids, a revision issued at least 10 calendar days before bid opening applies; one issued less than 10 days before also applies unless the agency finds there is not reasonable time to notify bidders and documents it.

There is a catch for slow awards. If a sealed-bid contract is not awarded within 90 days after bid opening, any revised general wage determination issued before award applies, unless the agency gets an extension from DOL. After award, a revision does not apply except in listed cases: when the contract is changed to add substantial work outside the original scope or extend the period of performance, including when an option is exercised, and for open-ended contracts like IDIQ or long-term operations and maintenance contracts, which update on the contract anniversary.

Contractors still have an affirmative obligation to make sure their pay practices comply. If the wrong wage determination was used, or one was left out, the agency must incorporate the correct one, generally retroactive to award or the start of construction, and the contractor must be compensated for resulting wage increases. Questions about which wage determination applies go to the Administrator of the Wage and Hour Division.

Which wage determination applies, and when does it lock?
SituationDoes the revised wage determination apply?
Revision issued 10 or more calendar days before sealed bid openingYes
Revision issued under 10 days before bid openingYes, unless the agency documents there was not reasonable time to notify bidders
Revision issued after bid opening, award within 90 daysNo
No award within 90 days of bid openingYes, any revised general wage determination issued before award, unless DOL extends the period
Revision issued after awardNo, unless an exception applies
Contract changed to add substantial out-of-scope work or extend the term, or an option is exercisedYes, the most recent revision at the time of the change
IDIQ, long-term O&M or similar open-ended contractsYes, updated on each contract anniversary
Extra time to finish the original scope onlyNo

Sources: 29 CFR 1.6: Use and effectiveness of wage determinations

Wage determination modifications and periodic updates

DOL revises wage determinations to keep them current. A revised wage determination replaces the previous one on the website, and the old one becomes inactive. Contracting officers generally cannot use an inactive wage determination in a new contract action, except in narrow retroactive cases with DOL notice.

Under the 2023 rule, DOL can update non-collectively bargained rates on general wage determinations using the Bureau of Labor Statistics Employment Cost Index. Those ECI updates can happen no more often than once every 3 years, and no sooner than 3 years after the rate was published. The practical point for a contractor: note the wage determination number and revision that is in your contract, and pay from that one, not from whatever is newest on SAM.gov, unless one of the exceptions above applies.

Sources: 29 CFR 1.6: Use and effectiveness of wage determinations

Classifications and conformance requests

Workers must be paid the rate for the classification of work they actually perform, without regard to skill, except registered apprentices. A worker doing more than one kind of work can be paid each classification's rate for the time in it, but only if the payroll records accurately show the time in each one.

If you will use a classification the wage determination does not list, the contracting officer must require it to be conformed. Conformance is allowed only when three things are true: the work is not performed by a classification already in the wage determination, the classification is used in the area by the construction industry, and the proposed rate, including fringe, bears a reasonable relationship to the rates in the wage determination. Conformance cannot be used to split or subdivide a listed classification to get a lower rate.

The contracting officer sends the request to DOL at DBAconformance@dol.gov. DOL approves, modifies or disapproves within 30 days or says it needs more time. The contractor must give each affected worker a written copy of the result or post it with the wage determination, and the conformed rate is owed from the first day work was performed in the classification. Wage determinations can also list frequently recurring classifications, ones regularly conformed in the area, which removes the need for a new request.

Sources: 29 CFR 5.5: Contract provisions and related matters

Fringe benefits under Davis-Bacon

Each classification usually has a basic hourly rate and a fringe rate, and you owe both. Contributions to bona fide fringe benefit plans count as wages paid, and regular contributions made less often than weekly, but at least quarterly, count toward the weeks they cover. Any fringe you do not provide through a plan can be paid as cash.

If the wage determination states a fringe benefit that is not an hourly rate, such as paid holidays, you can provide that benefit, another bona fide benefit, or an hourly cash equivalent. If you provide benefits through an unfunded plan, with no payments to a trustee or third party, you can credit its reasonably anticipated cost only after the Secretary of Labor approves it on your written request.

The fringe credit for a benefit like health insurance generally has to be annualized across all hours a worker works, private jobs included. That calculation has its own article: see our guide to Davis-Bacon fringe benefit annualization.

Sources: 29 CFR 5.5: Contract provisions and related matters

Apprentices, trainees and helpers on Davis-Bacon jobs

Apprentices can be paid less than the journeyworker rate only when they are individually registered in a bona fide apprenticeship program registered with DOL's Office of Apprenticeship or a recognized State Apprenticeship Agency. A person in the first 90 days of probationary employment who has been certified as eligible also qualifies. Apprentices get fringe benefits as the program specifies, or the full wage determination fringe if the program is silent.

The ratio of apprentices to journeyworkers on the site, in each craft, cannot exceed the ratio in the registered program, and when you work outside the locality where your program is registered, the ratios and wage percentages of the project's locality apply. Anyone paid an apprentice rate who is not registered, or who is over the ratio, must be paid the full rate for the work performed. Keep written evidence of program and apprentice registration, ratios and wage rates.

Trainees are narrower under the current rules. The part 5 apprentice provisions do not apply to apprentices and trainees on Federal-aid highway projects under 23 U.S.C. 113 who are in programs certified by the Secretary of Transportation. Outside such programs, a worker who is not a registered apprentice is paid the full classification rate. A helper classification appears on a wage determination only when the helper's duties are clearly defined and distinct, using helpers is an established practice in the area, and the helper is not a trainee in an informal training program.

Sources: 29 CFR 5.5: Contract provisions and related matters; 29 CFR 5.2: Definitions

Weekly certified payroll and the Statement of Compliance

Each contractor and subcontractor submits a certified payroll for every week in which Davis-Bacon covered work is performed. It goes to the federal agency if the agency is a party to the contract, or otherwise to the applicant, sponsor or owner for transmission to the agency. The prime contractor is responsible for submission of all subcontractors' certified payrolls. Optional Form WH-347 is one format; any format with the required information is allowed, and electronic systems are allowed with a legally valid electronic signature.

The weekly payroll shows each worker's identifying number, such as the last four digits of a Social Security number, classification, hourly rates and fringe, daily and weekly hours, deductions and wages paid. Do not include full Social Security numbers, addresses, phone numbers or emails on the weekly copy, but keep them on file and provide them on request.

The signed Statement of Compliance certifies three things: that the payroll is correct and complete and the required records are kept; that each worker was paid the full weekly wages earned with no rebates and only permissible deductions under 29 CFR part 3; and that each worker was paid at least the applicable rates and fringe for the classifications actually worked. The signature on the back of the WH-347 satisfies it. Falsifying it can lead to civil or criminal prosecution.

Sources: 29 CFR 5.5: Contract provisions and related matters; 29 CFR 3.3: Certified payrolls

Davis-Bacon posting requirements

The contractor and every subcontractor must post the wage determination, including any conformed classifications and rates, and the Davis-Bacon poster, WH-1321, at the site of the work at all times, in a prominent and accessible place where workers can easily see them. Put this on your mobilization checklist and check it during site walks, because posters get removed, weathered or buried when trailers move.

Sources: 29 CFR 5.5: Contract provisions and related matters

Subcontractor flow-down and prime contractor liability

Every subcontract must include the Davis-Bacon clauses and the applicable wage determinations, plus a clause requiring each subcontractor to put them in its own lower-tier subcontracts. The prime contractor is responsible for compliance by every subcontractor at every tier. If a lower-tier sub underpays, the prime and the responsible subcontractor are liable for the unpaid wages and monetary relief, including interest, and may face debarment.

The rules define prime contractor broadly. It includes the controlling shareholders or members of the entity holding the prime contract, the partners in a joint venture holding it, and any contractor, such as a general contractor, delegated responsibility for overseeing all or substantially all of the construction under the prime contract. Subcontractor means a subcontractor at any tier.

No part of the contract can be subcontracted to a firm that is debarred. Check SAM.gov exclusions before you award, and collect each sub's weekly payroll from its first week on site, not at the end of the month.

Sources: 29 CFR 5.5: Contract provisions and related matters; 29 CFR 5.2: Definitions

Overtime under the Contract Work Hours and Safety Standards Act

On contracts over $100,000, laborers and mechanics must get at least one and one-half times the basic rate of pay for hours over 40 in a workweek. The overtime premium is computed on the basic hourly rate; fringe contributions can be excluded from the regular rate, so long as the rate used is not below the wage determination's basic rate.

Violations bring back wages plus interest and liquidated damages. The clause text in 29 CFR 5.5(b)(2), checked November 17, 2026, sets liquidated damages at $33 per worker for each calendar day the worker worked over 40 hours in the week without the required overtime. Agencies can withhold to cover both.

Sources: 29 CFR 5.5: Contract provisions and related matters; 29 CFR 5.32: Overtime payments

Withholding, debarment and anti-retaliation

The agency may withhold contract payments on its own, and must withhold on DOL's written request, enough to cover unpaid wages and monetary relief, including interest, owed by the prime or any subcontractor. Under the current clause, it can withhold from this contract or from any other federal or federally assisted contract with Davis-Bacon standards held by the same prime contractor, known as cross-withholding. DOL's claim to withheld funds comes ahead of sureties, reprocurement costs, bankruptcy trustees, assignees, successors and Prompt Payment Act claims. The agency can also suspend payments if required records are not submitted.

Contractors and subcontractors found to have disregarded their obligations to workers or subcontractors, along with their responsible officers and firms in which they have an interest, are ineligible for federal and covered contracts for 3 years. Names are published on SAM.gov. Failing to produce records or allow worker interviews can itself be grounds for debarment.

It is unlawful to fire, threaten, blacklist or otherwise retaliate against a worker or job applicant for raising a possible violation, filing a complaint, cooperating with an investigation or telling others about their rights.

Sources: 29 CFR 5.5: Contract provisions and related matters; 29 CFR 5.12: Debarment proceedings

Davis-Bacon record retention: what to keep and for how long

Keep payrolls and basic records for every laborer and mechanic during the work and for at least 3 years after all the work on the prime contract is completed. That clock runs from completion of the prime contract, not from the end of your own scope, so a sub that finishes early keeps records longer than it may expect.

Basic records include each worker's name, Social Security number, last known address, phone number and email, correct classifications, hourly rates and fringe, daily and weekly hours in total and on each covered contract, deductions and actual wages paid. Keep certified payrolls for the same period, and keep the contract or subcontract and related documents, including bids, proposals, amendments, modifications and extensions. Apprentice registration and ratio records belong in the file too.

Records must be available for inspection and copying by the agency and DOL, and you must allow interviews with workers during working hours on the job. If you fail to produce records when WHD asks, you can be barred from using them as evidence later.

Sources: 29 CFR 5.5: Contract provisions and related matters

The 2023 Davis-Bacon final rule: what changed

DOL published Updating the Davis-Bacon and Related Acts Regulations on August 23, 2023, and it took effect October 23, 2023. The current regulation text carries that rule's citation in many sections. Changes contractors notice most include the 30 percent definition of prevailing wage in 29 CFR 1.2; periodic ECI-based updates of non-collectively bargained rates; frequently recurring classifications on wage determinations; cross-withholding across the same prime's contracts with DOL priority over sureties; explicit anti-retaliation clauses; added record items such as worker phone and email and contract documents; and a broader definition of prime contractor.

On June 24, 2024, the U.S. District Court for the Northern District of Texas issued a nationwide preliminary injunction against three provisions: the 29 CFR 5.2 distinction between material suppliers and contractors, the 5.2 coverage of delivery truck drivers' onsite time beyond de minimis, and the 5.5(e) provision applying the clauses by operation of law when an agency leaves them out. DOL says those three may not be implemented or enforced for now and the rest of the rule remains in effect. Its interim guidance does not enforce coverage of offsite delivery work, including pickup, delivery and related loading, unloading or waiting.

Sources: U.S. Department of Labor: Davis-Bacon final rule and injunction update; U.S. Department of Labor: Davis-Bacon and Related Acts; 29 CFR 1.2: Definitions, including prevailing wage

Davis-Bacon compliance checklist for contractors, step by step

Use this as a working list from bid to closeout. Each step points to the rule behind it.

Davis-Bacon compliance checklist for contractors, step by step
StepWhenWhat to doRule
1. Confirm coverageBefore bidCheck the funding source, contract value over $2,000 and scope; note if the prime is over $100,000 for overtime29 CFR 5.5(a), (b)
2. Pull the wage determinationsBefore bidRecord each wage determination number, revision, area and construction type in the bid documents29 CFR 1.6(b)
3. Price labor at the right ratesBefore bidMap every planned classification to a listed rate; flag any that need conformance29 CFR 5.5(a)(1)
4. Lock the applicable revisionAwardConfirm which revision applied at bid opening or award and file it with the contract29 CFR 1.6(c)
5. Flow down clausesEach subcontractInsert the clauses, wage determinations and lower-tier flow-down; check SAM.gov exclusions29 CFR 5.5(a)(6), (10)
6. Request conformanceBefore the work startsSend unlisted classifications to the contracting officer; pay the approved rate from day one29 CFR 5.5(a)(1)(iii)
7. Post on siteMobilizationPost the wage determination, conformed rates and WH-1321 where workers can see them29 CFR 5.5(a)(1)(i)
8. Verify apprenticesBefore they startFile program and individual registration; check ratios by craft and locality29 CFR 5.5(a)(4)
9. Track time by classificationDailyRecord hours by classification for each worker on each covered contract29 CFR 5.5(a)(3)(i)
10. Pay weeklyEvery weekPay base, fringe or cash in lieu, and overtime premium on the basic rate, with only permissible deductions29 CFR 5.5(a)(1); part 3
11. Submit certified payrollEvery week of covered workSubmit your payroll and each sub's with a signed Statement of Compliance29 CFR 5.5(a)(3)(ii); 3.3
12. Fix underpayments fastAs foundPay restitution with interest and keep the correction record29 CFR 5.5(a)(1)(vi)
13. Update rates on changesChange or optionApply the current revision when substantial scope or time is added or an option is exercised29 CFR 1.6(c)(2)(iii)
14. Keep records3 years after the prime contract is completeRetain payrolls, basic records, certified payrolls, contracts and bids29 CFR 5.5(a)(3)

Sources: 29 CFR 5.5: Contract provisions and related matters; 29 CFR 1.6: Use and effectiveness of wage determinations; 29 CFR 3.3: Certified payrolls

How Buildalytic helps with Davis-Bacon compliance

Buildalytic Certified Payroll supports weekly payroll collection from subcontractors, review against the wage determination, correction records and workforce reporting. Brody calls, texts and emails subs' payroll contacts about missing weeks and corrections and records the result on the job. Your authorized team reviews and certifies the payrolls; a received or reviewed status in Buildalytic is not a government filing receipt or a guarantee of compliance. Certified payroll is separately scoped and quoted.

Common questions

What is the Davis-Bacon threshold?

$2,000. Davis-Bacon labor standards apply to covered federal and federally assisted contracts over $2,000 for construction, alteration or repair, including painting and decorating. Overtime clauses under the Contract Work Hours and Safety Standards Act apply to contracts over $100,000.

What are the Davis-Bacon requirements for contractors?

Pay at least the wage determination rate and fringe for the work performed, at least weekly; post the wage determination and WH-1321; submit weekly certified payroll with a Statement of Compliance; flow the clauses to all subcontracts; follow apprentice rules; and keep records for 3 years after the prime contract is complete.

How do I find the Davis-Bacon wage determination for my project?

Use the wage determination number and revision in your bid documents or contract. DOL publishes general wage determinations on SAM.gov. If the contract has none, or the wrong one, ask the contracting officer, who is responsible for incorporating the correct one.

Does a new wage determination modification apply to my contract?

Usually not after award. Revisions issued before award, or at least 10 days before sealed bid opening, generally apply. After award, a revision applies only if substantial work or time is added, an option is exercised, or the contract is an open-ended type updated each anniversary.

Who submits certified payroll on a Davis-Bacon job?

Every contractor and subcontractor with covered laborers or mechanics, for each week covered work is performed. The prime contractor is responsible for submitting all subcontractors' payrolls to the agency, or to the owner or sponsor on federally assisted projects.

How long must Davis-Bacon records be kept?

At least 3 years after all the work on the prime contract is completed. That covers payrolls, basic records, certified payrolls, and the contract or subcontract with bids, proposals, amendments, modifications and extensions.

What happens if a subcontractor violates Davis-Bacon?

The responsible sub and the prime contractor are liable for unpaid wages and interest. The agency can withhold payments, including across the prime's other covered contracts, and serious violators can be debarred for 3 years.

Is the 2023 Davis-Bacon rule in effect?

Yes, except three provisions enjoined by a federal court on June 24, 2024: the material supplier distinction, onsite coverage of delivery truck drivers, and applying clauses by operation of law. DOL says the rest took effect October 23, 2023 and remains in effect.

Sources and editorial notes

Prepared with AI assistance. Reference date: 2026-11-17. Worked examples are illustrative and are not customer results. Product details can change; confirm the current scope and terms before rollout.

How we prepare and update field notes
See it on your workflow

Collect and review every sub's weekly payroll.

Bring one Davis-Bacon job and its subcontractor list. See weekly payrolls collected, checked against the wage determination and followed up.

Start with the call, text or record your team already handles. Review the expected outcome and the human handoff before choosing a rollout.

See certified payroll Explore the relevant capability