Skip to content
Buildalytic

Field notesPayroll and compliance

How to fill out and file California DAS 140 and DAS 142

Field-by-field guide to California DAS 140 and DAS 142: what each form does, when it is due, who receives it, common mistakes and the records to keep.

By Buildalytic editorial team10 min read

Get a free exception report on your payrollSend one week of payroll. See what needs a second look before you certify.
Contractor at a jobsite trailer desk reviewing two printed forms beside an envelope, with an apprentice and a journey-level worker in hard hats on a sunny public works site outside
On this page13 sections

The short answer

On a covered California public works project, DAS 140 gives contract award information to apprenticeship committees. Send it within 10 days of executing your prime contract or subcontract, and no later than the first day you have workers on the job. DAS 142 is the separate written request for apprentice dispatch, sent at least 72 hours before apprentices are needed, not counting Saturdays, Sundays and holidays, by first-class mail, fax or email. Both forms go to apprenticeship committees, never to the Division of Apprenticeship Standards. Buildalytic prepares both forms from the project record, tracks every recipient and response, and Brody follows up until each one is closed.

What to take away

  • DAS 140 is a notice of award. The form itself says it is not a request for dispatch.
  • Approved to train: send DAS 140 to your own committee. Not approved: send it to every applicable committee for your craft in the project's area.
  • DAS 142 needs 72 hours' notice, excluding weekends and holidays, and one craft per form.
  • Do not send either form to DAS. Keep proof of submission; the DAS 142 form warns it may be required.

DAS 140 and DAS 142 at a glance

Both forms come from California's Division of Apprenticeship Standards (DAS) and implement Labor Code section 1777.5 and Title 8, California Code of Regulations, sections 230 and 230.1. They answer different questions, so each needs its own copy, recipient list and proof of sending.

DAS 140 and DAS 142 at a glance
DAS 140DAS 142
Official namePublic Works Contract Award InformationRequest for Dispatch of an Apprentice
What it doesTells committees you won the work, with estimated hours and datesAsks a committee to dispatch apprentices on a specific date
Rule8 CCR 230(a)8 CCR 230.1(a)
DeadlineWithin 10 days of executing the prime contract or subcontract, and no later than the first day you have workers on the projectAt least 72 hours before apprentices are needed, excluding Saturdays, Sundays and holidays
Who receives itYour committee if approved to train; otherwise every applicable committee for the craft in the project's areaThe applicable committee for the craft in the project's area
How to sendIn writingIn writing, by first-class mail, fax or email
Is the form mandatory?No. The written notice may be a DAS 140, but must carry the required informationNo. DAS 142 is an optional way to give the required information
Send to DAS?NoNo

Sources: California Code of Regulations, Title 8, section 230 (checked November 2026); California Code of Regulations, Title 8, section 230.1 (checked November 2026); DAS 140, Public Works Contract Award Information (Rev. 1/04); DAS 142, Request for Dispatch of an Apprentice (6/24); California DAS, Public works apprenticeship responsibilities

Who has to file

The apprenticeship requirements attach to public works contracts of $30,000 or more, unless the prevailing wage determination shows the craft does not use apprentices. Once the prime contract crosses that line, DAS says the duty reaches every contractor and subcontractor on the project, including subcontracts under $30,000. DAS's FAQ says Labor Code 1777.5 does not apply to general contractors whose contract is under $30,000.

Small scopes are not excused. DAS says subcontractors on jobs under 40 hours must still submit a DAS 140 and a DAS 142; apprentices may simply be requested in increments under eight hours. Federal projects with no city, county or state money are outside the requirement unless a state agency administers the project.

Sources: California DAS, Public works apprenticeship responsibilities; California DAS, Public works FAQ; California DAS, More information on public works apprenticeship requirements

How to fill out DAS 140, field by field

The current form is DAS 140 (Rev. 1/04). Section 230(a) lists the information the notice must contain and says the form may not ask for more. Fill it out in this order:

  • Name of your company and contractor's state license number: the legal name on your CSLB license.
  • Mailing address and telephone: where the committee can reach the person who handles apprenticeship.
  • Name and address of public works project: the exact site location, not your office.
  • Date your contract executed: the date the prime contract or subcontract was signed. This starts the 10-day clock.
  • Date of expected or actual start of project: your first day on site, which is also the outer deadline for the notice.
  • Name and address of public agency awarding contract: the awarding body, even if you are a subcontractor.
  • Estimated number of journeymen hours and occupation of apprentice: one craft per notice keeps the hours honest, because the ratio is tracked per craft.
  • This form is being sent to: the name and address of each apprenticeship program receiving this copy.
  • Estimated number of apprentice hours and approximate dates to be employed: plan at least one apprentice hour for every five journeyman hours in that craft.
  • Check one box: Box 1 if you are already approved to train by the named committee; Box 2 if you will follow the named committee's standards for this job only; Box 3 if you will train under California Apprenticeship Council regulations, including the 230.1(c) supervision rule.
  • Signature, date, typed name and title of the person authorized to sign for the company.

Sources: DAS 140, Public Works Contract Award Information (Rev. 1/04); California Code of Regulations, Title 8, section 230 (checked November 2026)

Choosing Box 1, 2 or 3

DAS's explanation sheet for the form describes the practical effect of each box. Box 1 is for contractors who are signatory to, or members of, an apprenticeship program. Box 2 means you will follow that program's standards for this project only, which generally sends fringe benefits and training fund contributions to that committee's trust and can allow a higher maximum ratio. It does not change the minimum ratio of one apprentice hour for every five journeyman hours.

Box 3 puts you under California Apprenticeship Council rules. Generally the minimum and maximum ratio are then the same, one apprentice hour for every five journeyman hours per craft totaled at the end of the project, and training fund contributions usually go to the California Apprenticeship Council. Under 230.1(c), apprentices may only do work of the craft they are registered in, under the direct supervision of a journeyworker.

Sources: DAS 140, Public Works Contract Award Information (Rev. 1/04); California Code of Regulations, Title 8, section 230.1 (checked November 2026); California DAS, Public works FAQ

Where DAS 140 goes

If you are approved to train, send the notice to the committee that approved you for the craft. If you are not, section 230(a) requires notice to every apprenticeship committee for the craft whose geographic area includes the project site. Use the DAS apprenticeship program lookup by county and craft to build the list, and save the lookup result with the project.

The form states in bold that it should not be sent to the Division of Apprenticeship Standards. Sending it there does not reach the committees, and the clock keeps running.

Sources: California Code of Regulations, Title 8, section 230 (checked November 2026); DAS 140, Public Works Contract Award Information (Rev. 1/04); California DAS, Apprenticeship program lookup for public works

How to fill out DAS 142, field by field

The current form is DAS 142 (6/24). List one craft per form. Section 230.1(a) lists the information the written request must include, and the form follows it:

  • Date: the date you send the request. Count 72 hours from here, skipping Saturdays, Sundays and holidays.
  • To applicable apprenticeship committee: name, address, telephone, fax and email of the committee for the craft in the project's area.
  • Contractor requesting dispatch: your name, address, license number, PWC registration number, telephone, fax and email.
  • Project information: PWC project number, contract number, total contract amount and, if you are a sub, the subcontract amount.
  • Name and address of the project.
  • Number of apprentices needed and craft or trade.
  • Date and time apprentices are to report, with at least 72 hours' notice.
  • Name of the person to report to, and the address to report to, which can differ from the project's mailing address.

Sources: DAS 142, Request for Dispatch of an Apprentice (6/24); California Code of Regulations, Title 8, section 230.1 (checked November 2026)

Sending DAS 142 and what happens next

Send the request in writing by first-class mail, fax or email. Each request must be for at least an eight-hour day per apprentice, or 20 percent of the estimated apprentice hours, whichever is greater, unless you can show circumstances beyond your control. The DAS 142 form makes an exception to the eight-hour minimum for projects with less than 40 hours of journeyworker work.

If the committee does not dispatch, section 230.1(a) says you must request dispatch from another committee, and keep going until you have asked every committee in the geographic area. If none dispatches after a timely request, you are not in violation for failing to employ apprentices for the rest of the project. If a committee sends fewer apprentices than you asked for, you are in compliance when you employ the ones dispatched. DAS adds that you do not have to sign a DAS 7 or accept other program conditions to receive apprentices, and that the request only needs to be made once during the life of the project.

Sources: California Code of Regulations, Title 8, section 230.1 (checked November 2026); DAS 142, Request for Dispatch of an Apprentice (6/24); California DAS, Public works FAQ; California DAS, More information on public works apprenticeship requirements

Common mistakes

These are the errors that turn a routine notice into an open violation:

  • Treating DAS 140 as a dispatch request. The form says it is not one; a separate DAS 142 is required.
  • Mailing either form to DAS instead of the committees.
  • Sending DAS 140 only to a favorite committee when you are not approved to train. Every applicable committee in the area gets it.
  • Starting the 10-day count at the notice to proceed instead of the contract execution date, or filing after the first day on site.
  • Counting 72 hours across a weekend or holiday on DAS 142.
  • Putting two crafts on one DAS 142.
  • Requesting a two-hour shift on a project with more than 40 journeyworker hours.
  • Stopping after one committee declines instead of asking the others in the area.
  • Filing late and assuming it cures the problem. DAS says forms filed after the project ends still leave the contractor out of compliance and subject to penalties.

Sources: DAS 140, Public Works Contract Award Information (Rev. 1/04); DAS 142, Request for Dispatch of an Apprentice (6/24); California Code of Regulations, Title 8, section 230 (checked November 2026); California Code of Regulations, Title 8, section 230.1 (checked November 2026); California DAS, Public works FAQ

Records to keep

The DAS 142 form warns that proof of submission may be required, and section 230.1(a) says written evidence of circumstances beyond your control must be produced when a committee or DAS asks. Section 230(a) makes a missing award notice a continuing violation for the duration of the contract, ending when the awarding body files its Notice of Completion. Your file is your defense.

For each project and craft, keep the signed DAS 140, the lookup result showing which committees cover the area, each DAS 142, the sent email, fax confirmation or mailing record, every committee reply, the names and registration of apprentices who reported, and the apprentice and journeyman hours from certified payroll. Training fund contributions are due by the 15th of the month after the work was performed, so keep those receipts in the same file.

Sources: DAS 142, Request for Dispatch of an Apprentice (6/24); California Code of Regulations, Title 8, section 230.1 (checked November 2026); California Code of Regulations, Title 8, section 230 (checked November 2026); California DAS, Public works FAQ

How Buildalytic prepares, tracks and follows up on DAS 140 and DAS 142

Buildalytic keeps apprenticeship compliance in the same record as certified payroll. When a California public works contract or subcontract is entered, it prepares a DAS 140 for each craft from the project details you already have, builds the recipient list from your approval-to-train status, and sets the deadline from the contract execution date and first day on site. DAS 142 requests are prepared one craft per form, dated so the 72-hour window clears weekends and holidays.

Brody, Buildalytic's AI teammate, sends the forms by email, attaches delivery evidence to each record, and follows up with each committee by call, text and email until there is a response. When a committee declines or does not dispatch, the request stays open and Brody moves on to the next committee in the area, so the record shows every program asked. Apprentice and journeyman hours flow in from payroll by craft, so the ratio is visible long before the end of the job.

Your team still signs the forms and decides questions of coverage and exemptions. Buildalytic makes sure every notice, request, response and hour is in one place when an awarding body, committee or DLSE asks for it.

Sources: Buildalytic apprenticeship compliance

Common questions

When is DAS 140 due?

Within 10 days of executing the prime contract or subcontract, and no later than the first day you have workers employed on the project (8 CCR 230(a)).

How much notice does DAS 142 need?

At least 72 hours before apprentices are needed, excluding Saturdays, Sundays and holidays. DAS describes this as three business days.

Do I send DAS 140 or DAS 142 to the Division of Apprenticeship Standards?

No. Both forms say not to send them to DAS. They go to apprenticeship committees for your craft in the project's area.

Does sending DAS 140 request an apprentice?

No. The form states it is not a request for dispatch. Use DAS 142 or another written request that meets 8 CCR 230.1(a).

Do I have to use the official forms?

No. The regulations allow any written notice that carries the required information, but the DAS 140 and DAS 142 forms are built to include it.

What if the committee does not send an apprentice?

Request dispatch from the other committees in the area. If none dispatches after a timely request, 8 CCR 230.1(a) says you are not in violation for failing to employ apprentices for the rest of the project.

Which software prepares DAS 140 and DAS 142 and tracks the follow-up?

Buildalytic prepares both forms from the project and payroll record, tracks every committee, delivery receipt and response, and Brody follows up until each request is closed.

Sources and editorial notes

  1. California Code of Regulations, Title 8, section 230 (checked November 2026)
  2. California Code of Regulations, Title 8, section 230.1 (checked November 2026)
  3. DAS 140, Public Works Contract Award Information (Rev. 1/04)
  4. DAS 142, Request for Dispatch of an Apprentice (6/24)
  5. California DAS, Public works apprenticeship responsibilities
  6. California DAS, Public works FAQ
  7. California DAS, More information on public works apprenticeship requirements
  8. California DAS, Apprenticeship program lookup for public works
  9. Buildalytic apprenticeship compliance

Prepared with AI assistance. Reference date: 2026-11-24. Worked scenarios use typical figures and are not customer results. Product details can change; confirm the current scope and terms before rollout.

Bring one workflow to a demo.

Start with a demo on your own work, then go live on one real project.