Downtobid alternatives (2026): bid invitations and subcontractor follow-up

Downtobid alternatives for bid invitations and follow-up: BuildingConnected, SmartBid, ConstructConnect, PlanHub and Buildalytic, with how each reaches subs. Checked November 2026.

By Buildalytic editorial team8 min read

An estimator uses a headset while reviewing an unlettered trade-coverage worksheet in a construction office.
On this page11 sections

The short answer

Downtobid alternatives split into bid boards that send invitations and track replies, and follow-up that gets an answer from every sub before bid day. Buildalytic's Brody pulls the bid list straight from BuildingConnected or ConstructConnect, sends invitations and addenda by email and text after the estimator approves them, calls every sub to confirm documents, intent to bid and scopes, and reports coverage by trade, with bid leveling on Brody Pro. For bid management and a network of subs, compare BuildingConnected in Autodesk Forma, SmartBid and ConstructConnect, and PlanHub, which lets general contractors post projects free and lists automatic follow-ups. Y Combinator lists Downtobid as acquired without naming a buyer.

What to take away

  • Y Combinator lists Downtobid as acquired and names no buyer. Line up a backup before a bid that matters.
  • Separate the bid board, which sends and tracks, from the follow-up, which gets an answer from every sub.
  • Check how each tool confirms addenda and reports thin coverage by trade.
  • PlanHub lets GCs post projects free and Buildalytic publishes prices. BuildingConnected, SmartBid and ConstructConnect quote.

What changed at Downtobid

Downtobid went through Y Combinator in summer 2019, and its YC page describes it as “Using AI to understand construction plans faster.” The page now lists its status as acquired and names no buyer. We found no announcement from a buyer.

Downtobid's own blog describes invitations sent to subs from its database, reminder emails to subs who have not responded, limited to three follow-ups, and a dashboard of who is bidding, who declined and who has not answered. Its site did not load for us when we checked, so we could not confirm what has changed for current users.

If you rely on it for bid invitations, line up an alternative before your next bid that matters.

Facts and prices below were copied from each vendor's own website on November 28, 2026. The order groups tools by kind and is not a ranking. Buildalytic makes one of the options.

Sources: Y Combinator: Downtobid company page (checked November 28, 2026); Downtobid: BuildingConnected vs Downtobid (checked November 28, 2026)

What to compare

The bid that goes wrong is usually the one where a sub never confirmed the addendum or never said they weren't bidding. Compare each alternative on the points below.

  • Invite list: a network the vendor keeps, your own sub list, or a list pulled from another bid board.
  • Channels: email only, or email and text.
  • Follow-up: automatic reminder emails, follow-up you hand to the vendor, or calls from your company number.
  • Addenda: does the tool confirm each sub received every addendum?
  • Coverage: are bidding, declined and unreachable subs reported by trade, with an alert when a scope is thin?
  • Questions: who answers a sub's question about the bid package, and is the answer sourced?
  • Pricing model: free to post, quoted, or a published price per company.

Downtobid and five alternatives at a glance

“Not stated” means the vendor's pages we read don't say; ask them.

Downtobid and five alternatives at a glance
OptionKindInvite listInvitations and follow-upCoverage trackingPublished price
Downtobid (for reference)AI bid invitation tool; YC lists it as acquiredSubs from its own databaseInvitations with up to three reminder emails to subs who have not responded, per its blogBidding, declined and no response on a dashboard, per its blogNot confirmed; its site did not load when checked
BuildingConnected (Autodesk Forma)Bid management in Autodesk Forma: BuildingConnected Pro for GCs and owners, Bid Board Pro for subsA network its page puts at over 1,000,000 construction professionals; a Recommendation Engine suggests bidders by location, trade expertise and past performanceBid management from start to finish; reminders not described on the page readProjects, bids and documents in one place; bids compared side by sideNot published; Autodesk offers a customized quote
SmartBidBid management software for general contractors, part of ConstructConnectYour private subcontractor databaseInvitations to bid sent from one place; reminders not described on the page readNot stated on the page readNot published
ConstructConnectProject leads, bid management and takeoffA network of qualified subcontractors; bid packages in ConstructConnect Bid Management, SmartBid and iSqFtBidding organized “from first invitation to final award”Not stated on the page readNot published
PlanHubBidding platform for GCs, subs and suppliers400,000+ subcontractors and 30,000+ suppliers, matched by trade and regionOne-click invitations with automatic follow-ups; a Virtual Bid Coordinator to “delegate bid follow-ups”Bid status at a glance, showing which projects need more coverageGCs post projects free; other prices on its pricing pages
BuildalyticBid solicitation and follow-up by call, text and emailPulled straight from BuildingConnected or ConstructConnect, a CSV, or subs by trade from your list; PlanHub notices read into your bid listInvitations and addenda by email and text after the estimator approves; Brody calls each sub to confirm documents, intent to bid and scopes, and follows up before the due dateBidding, needs plans, declined and unreachable by trade, with an alert when a scope is thinInvites, reminders and follow-ups on an Operator seat with Brody, $69 a month ($59 billed annually), or Brody Starter, $239 per company ($199); bid coverage reports and bid leveling on Brody Pro, $599 per company ($499)

Sources: Y Combinator: Downtobid company page (checked November 28, 2026); Downtobid: BuildingConnected vs Downtobid (checked November 28, 2026); Autodesk Forma: BuildingConnected (checked November 28, 2026); Autodesk Forma: request a quote for BuildingConnected (checked November 28, 2026); SmartBid: bid management software (checked November 28, 2026); ConstructConnect (checked November 28, 2026); PlanHub: construction bidding platform (checked November 28, 2026); PlanHub: general contractor bid management (checked November 28, 2026); Buildalytic: subcontractor bid solicitation and follow-up; Buildalytic: pricing and usage (checked November 28, 2026)

When to stay with Downtobid

If Downtobid still sends your invitations and its reminders bring subs back, keep it running while you test something else on a smaller bid. Its blog says it limits follow-ups to three emails so subs aren't flooded, and it shows who is bidding, who declined and who has not answered. Ask the company directly who owns it now and what that means for your account.

Sources: Downtobid: BuildingConnected vs Downtobid (checked November 28, 2026)

When another alternative fits better

If you want a large network and bid management inside Autodesk Forma, start with BuildingConnected. Its page puts the network at over 1,000,000 construction professionals, BuildingConnected Pro handles bid management for GCs and owners, and a Recommendation Engine suggests bidders based on location, trade expertise and past performance. TradeTapp adds subcontractor qualification.

If you keep your own sub list and want a dedicated bid management tool, SmartBid lets you manage a private subcontractor database and send invitations from one place. It is part of ConstructConnect, which adds a large database of bid opportunities, takeoff and a network of qualified subcontractors.

If cost is the first filter, PlanHub lets general contractors post projects free, lists 400,000+ subcontractors and 30,000+ suppliers, and offers one-click invitations with automatic follow-ups, plus a Virtual Bid Coordinator for follow-ups you want to hand off.

Sources: Autodesk Forma: BuildingConnected (checked November 28, 2026); SmartBid: bid management software (checked November 28, 2026); ConstructConnect (checked November 28, 2026); PlanHub: construction bidding platform (checked November 28, 2026); PlanHub: general contractor bid management (checked November 28, 2026)

When you need an answer from every sub

Reminder emails get opened or they don't. The concrete sub who never confirmed Addendum 2 still bids, and the gap shows up on bid day.

Buildalytic's Brody starts from a bid list pulled straight from BuildingConnected or ConstructConnect, a CSV, or subs picked by trade from your company's list, and matches each row to an existing sub record. After the estimator approves the invite list, wording, call script and calling windows, Brody sends the invitation and every addendum by email and text, then calls each sub with your company name on caller ID. He opens every call by saying he is an AI assistant calling for your company.

On each call he confirms the sub received the plans and every addendum, asks if they intend to bid and on which scopes, and answers questions from the bid package with the document named. Anything outside the package goes to the estimator, and the answer goes back to the sub. The coverage summary shows who is bidding, who needs plans, who declined and who is unreachable by trade, with an alert when a scope falls below the minimum you set. Once quotes arrive, Brody lines them up against your scope sheet and asks subs for what is missing.

Your estimator decides price, scope and award. A sub who replies STOP or asks not to be contacted again is removed at once.

Sources: Buildalytic: subcontractor bid solicitation and follow-up; Buildalytic: bid leveling software for general contractors

How Buildalytic works beside the others

Brody works next to your bid board. Keep sending invitations from BuildingConnected, SmartBid or PlanHub, and let Brody pull the list, make the calls and send the coverage summary. PlanHub notices forwarded from Outlook can be read into your bid list. If every sub you invite already answers through your bid board, its own tracking may be enough.

Sources: Buildalytic: subcontractor bid solicitation and follow-up; Buildalytic: pricing and usage (checked November 28, 2026)

Switching before your next bid

Export your sub list with trades, contacts and past responses. Run the new tool on one small bid with the old one still in place, compare who answered and when, then move the big bids.

Common questions

Who bought Downtobid?

Y Combinator's company page lists Downtobid as acquired but names no buyer, and we found no announcement from one as of November 28, 2026. Ask the company directly before your next renewal.

What is the best Downtobid alternative?

For bid management and a large network, compare BuildingConnected, SmartBid with ConstructConnect, and PlanHub. For an answer from every sub, Buildalytic's Brody pulls the list from BuildingConnected or ConstructConnect, sends invitations and addenda by email and text, calls each sub to confirm documents, intent and scopes, and reports coverage by trade.

Which bid tools follow up with subs automatically?

Downtobid's blog describes up to three reminder emails. PlanHub lists automatic follow-ups on its invitations and a Virtual Bid Coordinator for follow-ups you hand off. Buildalytic's Brody follows up by call, text and email on the schedule your estimator sets and logs every answer on the sub record.

Can Brody use our BuildingConnected bid list?

Yes. Brody pulls the invite list straight from BuildingConnected or ConstructConnect, or you upload a CSV or pick subs by trade from your company's list. Each row is matched to an existing sub record so you don't end up with duplicates.

Will subs know they're talking to an AI?

Yes. Brody opens every call by saying he is an AI assistant calling for your company and gives the recording notice that applies in that state. He never pretends to be a person, and a sub who opts out is removed at once.

How much do bid invitation tools cost?

PlanHub lets general contractors post projects free. Buildalytic includes bid invites, reminders and follow-ups on an Operator seat with Brody at $69 a month ($59 billed annually) or Brody Starter at $239 per company ($199); bid coverage reports and bid leveling are on Brody Pro at $599 per company ($499 billed annually). BuildingConnected, SmartBid and ConstructConnect did not publish prices on the pages we read on November 28, 2026.

Sources and editorial notes

  1. Y Combinator: Downtobid company page (checked November 28, 2026)
  2. Downtobid: BuildingConnected vs Downtobid (checked November 28, 2026)
  3. Autodesk Forma: BuildingConnected (checked November 28, 2026)
  4. Autodesk Forma: request a quote for BuildingConnected (checked November 28, 2026)
  5. SmartBid: bid management software (checked November 28, 2026)
  6. ConstructConnect (checked November 28, 2026)
  7. PlanHub: construction bidding platform (checked November 28, 2026)
  8. PlanHub: general contractor bid management (checked November 28, 2026)
  9. Buildalytic: subcontractor bid solicitation and follow-up
  10. Buildalytic: bid leveling software for general contractors
  11. Buildalytic: pricing and usage (checked November 28, 2026)

Prepared with AI assistance. Reference date: 2026-11-28. Worked scenarios use typical figures and are not customer results. Product details can change; confirm the current scope and terms before rollout.