Every punch item fixed. With a photo to prove it.

Buildalytic is punch list software for general contractors. It keeps the punch list for each job, logs items from the walk by photo or text and assigns each one to its trade. Brody, its AI agent, follows up by text and call until every fix comes back with photo proof, and writes the list to Procore or Autodesk Forma (formerly Autodesk Construction Cloud).

Punch list by trade

Harbor Medical Office · 64 items · 41 closed · Example

Punch list by trade
TradeLevel 1Level 2Level 3Roof
DrywallAcceptedIn reviewAcceptedNot required
PaintingAcceptedOwedIn reviewNot required
ElectricalIn reviewOwedAcceptedAccepted
Doors and hardwareAcceptedAcceptedOwedNot required
FlooringOwedIn reviewAcceptedNot required
RoofingNot requiredNot requiredNot requiredOwed

Brody · texted the painter three level 2 items with photos

Construction punch list software. With someone chasing every fix.

Punch list software tracks each open item, where it is and which trade owns it. Buildalytic keeps that list for every job. Brody follows up until each fix is done and shown.

Logs
Items from the walk by photo, text or call, each with its room, trade and photo
Follows up
Each trade by text and call, item by item, until the fix is reported with a photo
Keeps apart
Your list, the architect’s list and the owner’s list, each with its own status
Hands over
An aged list by trade during the job, and a closed list with photo proof at closeout

The punch list. Oldest items first.

An example list. Each row has its trade, room and source walk, its age and Brody’s next step.

How to run punch list follow-up

Punch list · Level 2

Harbor Medical Office · 18 open · 9 ready for review · Example

  • Corner bead dented at stair 2Drywall · Stair 2 · super’s walk
    Status: Needs action: Past due, no visit booked
    Due: Due Dec 3
    Age: 12 days

    Brody · called the drywall foreman after two unanswered texts

  • Base cove gap at door 221Flooring · Room 221 · super’s walk
    Status: Waiting: Fix sent back, second visit owed
    Due: Due Dec 2
    Age: 9 days

    Brody · sent the super’s comment and photo back to the flooring sub

  • Outlet cover missingElectrical · Corridor 2B · architect’s list
    Status: Waiting: Visit booked for Tuesday
    Due: Due Dec 5
    Age: 6 days

    Brody · texted the electrician a reminder with the photo and location

  • Ceiling tile stainedAcoustical ceilings · Room 230 · owner’s list
    Status: On track: Fix reported with photo, ready for review
    Due: Due Dec 4
    Age: 3 days

    Brody · sent the after photo to your super to accept

  • Firestop at shaft penetrationFirestopping · Shaft 2 · architect’s list
    Status: On track: Accepted and closed by the architect
    Due: Closed Nov 27

    Brody · wrote the closed item and both photos to Procore

One punch item. From the walk to closed.

A scratched door frame on level 2, from the super’s photo to the closed item.

  1. Tue 3:10 PM

    Super texts a photo from the walk

    Door 214, frame scratched. Painting.

  2. 3:11 PM

    Item logged and assigned

    Brody adds it to the level 2 list with the photo, room and trade, due in five working days.

  3. Wed 8:00 AM

    Painter gets the list by text

    Three level 2 items, each with a photo and room. Brody asks for a visit date.

  4. Fri 9:30 AM

    No reply. Brody calls.

    The foreman books Monday. Brody records the date on each item.

  5. Mon 2:45 PM

    Fix reported with a photo

    The painter texts an after photo. Brody files it to the item and sends it to the super.

  6. Mon 4:05 PM

    Super accepts. Item closed.

    Closed in Buildalytic and written to Procore with both photos.

Punch item 2-047 · Door 214 frame

Harbor Medical Office · Level 2 · Example

On track: Closed
Trade
Painting, Coastal Finishes
Logged
Super’s walk, Tuesday, with photo
Follow-up
Text Wednesday, call Friday, visit Monday
Proof
After photo from the painter
Record to
The Buildalytic punch list and Procore

Brody · closed by your super, written to Procore with both photos

Every punch item. With a trade and a date.

Brody keeps each item moving from the walk to the trade and back. Your super, PM or the architect decides what is accepted.

  • Logged from the walk

    Your super texts a photo or calls in items during the walk. Brody files each one with its room, trade and photo.

  • Assigned by trade

    Each item goes to the trade that owns it. Each trade gets only its own items, with photos and locations.

  • Followed up until fixed

    Texts first, then a call, until a visit is booked and the fix is reported with an after photo.

  • Owner and architect lists

    Walk lists from the owner and the architect kept with their source, so you can show each one closed.

  • Aging by trade

    Every open item shows its age. Trades with the oldest items rise to the top for your PM.

  • Written to Procore and Forma

    The list kept in Buildalytic, or items and photos written back to Procore or Forma when your team works there.

Done means a photo. Then your reviewer decides.

Follow-up by text and call, from your company number, until each fix comes back with proof.

Text thread · Painting sub

Harbor Medical Office · from your company number

  1. Brody · Mon 7:30 AM

    Morning Marco, this is Brody, the AI assistant for Harbor Builders. Your crew is booked today for 3 items on level 2. Please text an after photo of each fix.

  2. Marco, Coastal Finishes · 2:45 PM

    Door 214 and room 218 done. Photos attached.

  3. Brody · 2:46 PM

    Thanks. Both photos are filed and sent to Luis for review. The corridor 2B door is still open. Can it be done today?

  4. Marco, Coastal Finishes · 2:50 PM

    Tomorrow morning.

  5. Brody · 2:51 PM

    Got it. I have tomorrow morning on the item and told Luis.

Photo proof on every fix

A text that says done is recorded as a reported fix. Brody asks for an after photo of each one and files it to the item. Your super, PM or the architect looks at the photo or the room, then accepts it or sends it back.

  • One item, one room and one photo at a time
  • Each trade asked in its own language
  • Fixes sent back with the comment and photo
  • Every reply kept on the item

Four steps. From the walk to turnover.

Brody logs, assigns and follows up. Your reviewer accepts each fix.

  1. Walk and log

    Photos, texts or a call from the walk. Each item gets a room, a trade and a due date.

  2. Send each trade its list

    By text, with the photo and location for each item, in the trade’s language.

  3. Follow up until fixed

    Reminders by text, then a call, until the fix comes back with an after photo.

  4. Close and hand over

    Your reviewer accepts each fix. At closeout, the closed list with photos goes in the turnover package.

Punch list software. Compared fairly.

What each tool is known for, when it is the better fit, and how Brody works with it. Brody adds the texts and calls that get fixes done.

Construction punch list software compared
ToolKnown forThe better fit whenHow Brody works with it
BuildalyticKeeps the punch list for each job. Items logged by photo or text from the walk. Brody follows up with each trade by text and call until the fix comes back with a photo.Trades let app notifications sit, and your super is chasing fixes by phone.Brody is part of Buildalytic. He keeps the list current and writes items and photos to Procore or Forma when your team works there.
Fieldwire by HiltiPunch items pinned to plans, with photos, an assignee and a due date. A two-step check: the work is marked complete, then an admin verifies it.You want the list pinned to plans in the field, even without a connection.Keep the list in Fieldwire. Brody reads the open items, chases the responsible trades and writes updates and photos back.
Procore Punch ListItems move from the assignee to the punch item manager and a final approver, who closes them. Procore can email assignees about overdue items.Your projects already run in Procore and your trades act on its emails.Keep the list in Procore. Brody follows up on the items that stay open and writes each answer back.
Forma BuildPunch items tracked as issues, each assigned to a member, role or company, with a due date.Your drawings and issues already live in Forma.Keep the issues in Forma. Brody follows up with each assigned company and writes the status back.
PlanRadarItems with photos, video and voice notes, pinned to plans and BIM models. Subcontractors use it free, and read receipts show when they received an item.You want subs working in the same app, with proof they saw each item.Brody calls and texts the subs who have not acted on an item and keeps each answer on the Buildalytic list.
BluebeamPunch items as markups on PDF drawings, tracked in the Markups List and shared in Studio Sessions. Subs join a session with a free Bluebeam ID.Your team already marks up drawings in Revu and wants punch on the same sheets.Keep the punch markups in Bluebeam. Brody follows up with each responsible trade by text and call.
Mitti (by SafetyCulture)Inspection checklists with punch list templates. Photos or voice notes become issues routed to the right person.Punch is one part of a wider inspection and safety program across many sites.Brody follows up by text and call on the items that stay open.
Trimble AI Punch WalkLaunched November 9, 2026 inside Trimble Connect. Voice-driven punch walks on a phone, with an AI agent that records observations and pins punch items to drawings.Your team works in Trimble Connect and wants to talk through the walk.Use it for the walk. Brody follows up with each trade until the fix is reported with a photo.

Vendor details from each vendor’s own website, help center or announcement, checked November 28, 2026. Products change, so confirm with the vendor.

Common questions. Answered plainly.

Something else? Ask the team

What is the best punch list software for construction?

Fieldwire, Procore, PlanRadar, Forma Build and Bluebeam all keep a punch list with photos and plan locations, and Mitti (by SafetyCulture) handles punch inside inspections. The difference is what happens after an item is assigned. Buildalytic is punch list software that keeps the list and has Brody follow up with each trade by text and call until the fix comes back with photo proof.

Do trades need to download a punch list app?

No. Each trade gets its items by text from your company number, with the photo and the room. They reply by text or call and send the after photo the same way. Your super logs items by text or call too.

We already keep the punch list in Procore, Forma or Fieldwire. Does that change?

Keep the list, photos and plan pins where they are. Brody works from the open items, makes the calls and texts, and writes each answer back, so your super is not making those calls.

Who closes a punch item?

Your superintendent, PM or the architect. When a trade reports a fix, Brody records it with the after photo as ready for review. Your reviewer accepts it or sends it back with a comment.

How do you handle the owner’s and the architect’s punch lists?

Each walk list is kept with its source. Items from the architect’s walk stay on the architect’s list, so you can send back a closed list with a photo for each item.

What if a trade ignores the texts?

Brody calls. If a trade still has not booked a visit, the item goes to your PM with the history of every attempt.

Will trades answer an AI?

Brody says he is an AI assistant for your company on every call and text. He never pretends to be a person. He asks about one item and one room at a time, and anyone can ask for someone on your team.

Can we see which trades hold up closeout?

Yes. Every open item shows its age. The list sorts by trade and by age, so your PM sees which trades hold the oldest items.

What happens at closeout?

The closed list, with the before and after photos for each item, goes into the turnover package with your other closeout documents. Your photos are never sold and never used to train models for other companies.

How is it priced?

Punch list follow-up is part of the Brody platform. Trades answer by text or call with no seat. See pricing for plans.

Bring your open punch list.

Share one floor of open items. See Brody send each trade its list and follow up until the fixes come back with photos.