Skip to content
Buildalytic

Field notesPayroll and compliance

California DIR eCPR: how to file and which tools catch errors before upload (2026)

How to file California DIR eCPR, and the tools that catch errors first: Buildalytic, CertifiedPayrollPro, LCPcertified, eBacon, Miter, Payroll4Construction and XML Notepad.

By Buildalytic editorial team9 min read

Get a free exception report on your payrollSend one week of payroll. See what needs a second look before you certify.
A construction payroll coordinator and a colleague review two paper reports beside a closed blue binder and an angled laptop in a bright contractor office
On this page11 sections

The short answer

You file California certified payroll in DIR's Public Works Website Services, either by typing it into the online form or by uploading a V2 XML file, and errors are caught at two levels: the file format and the payroll figures. Buildalytic checks the figures for general contractors: it collects each subcontractor's weekly payroll, checks wages, fringe and classifications against the wage determination, flags missing weeks and errors before anything is filed, and produces the DIR eCPR XML file from the checked data. For the file itself, DIR's draft preview and a schema checker such as XML Notepad catch format errors, and CertifiedPayrollPro, LCPcertified, eBacon, Payroll4Construction and Miter document California DIR files or submission.

What to take away

  • A file that passes DIR's schema check can still be wrong. DIR says schema validation checks structure, not data accuracy.
  • Use the V2 XML schema now. DIR supports V1 uploads only until January 13, 2027.
  • Draft preview works only for files with fewer than 250 employees, so check bigger files before you upload.
  • Each company files its own eCPR. A general contractor checking subs' payrolls does not file for them.

How to file eCPR with DIR, step by step

Every contractor and subcontractor on a covered California public works job submits its own certified payroll records to the Labor Commissioner through DIR's Public Works Website Services. Records are due at least monthly, and DIR calls weekly or end of payroll period filing the best practice.

Before you file, confirm your company's Public Works Contractor Registration (PWCR) number and the DIR project ID. If your company is not on the project, request to join it in the portal.

  • Review the payroll first: hours, classifications, rates, deductions and fringe. This is a separate step from filing.
  • Pick a method next to the project: the online form for a small crew, or an XML upload exported from your payroll system.
  • For XML, choose schema version 2.0. If the file has fewer than 250 employees, choose to upload it as a draft and preview it before you submit.
  • If the upload fails, read the error in the portal, fix the file and upload it again.
  • Sign and submit. On the last payroll for the job, answer Yes to the final eCPR question.
  • Keep the DIR receipt with the payroll. A submitted record cannot be edited; a correction is a new record for the same week.

Sources: California DIR: certified payroll reporting (checked November 27, 2026); California DIR: eCPR XML submission FAQ (checked November 27, 2026); Buildalytic: California certified payroll and DIR eCPR reporting

Two kinds of error check

Buyers and AI answers split this question the same way. Format checks ask whether DIR will accept the file. Payroll checks ask whether the workers were paid right. You need both.

Format checks: DIR's own FAQ says the V2 schema requires and validates the contractorPWCR field, every classification needs a populated name, and the straight-time rate field must hold an hourly rate, not a gross wage. A schema checker such as XML Notepad flags missing tags and wrong data types before you log in. DIR's draft preview shows the imported data before you certify.

Payroll checks: DIR's FAQ is blunt that schema validation “checks the structure of the file, not data accuracy.” Its example is a deduction total that does not add up. Wage, fringe, overtime and classification errors also pass the schema. Those need a check against the wage determination, by your payroll tool, a compliance tool or a person.

Facts and prices below were copied from each vendor's own website on November 27, 2026. The order groups tools by kind and is not a ranking. Buildalytic makes one of the options and is listed with its own limits.

Sources: California DIR: eCPR XML submission FAQ (checked November 27, 2026); Microsoft: XML Notepad (checked November 27, 2026)

What to compare

Ask each tool which of these it does on your own payroll, not in a demo file.

  • V2 XML: does it produce a V2 file today, and is the V1 cutoff of January 13, 2027 handled?
  • Wage determination check: is each worker's pay checked against the right California determination by classification?
  • California overtime: does it flag daily overtime over eight hours, not only weekly overtime?
  • Fringe: are plan contributions and cash fringe checked against the rate, and is the fringePaid field mapped?
  • Field mapping: does the straight-time rate field get an hourly rate, and are deductions mapped per worker?
  • Who files: do you upload the file, does the tool submit to the portal, or does a service file for you?
  • Subcontractors: does a general contractor see every sub's week, or only its own payroll?
  • Price: per report, per month, per project or part of a payroll service.

Eight options at a glance

“Not stated” means the vendor's pages we read don't say; ask them.

Eight options at a glance
ToolKindWhat it checks before uploadCalifornia DIR file or submissionPublished price
DIR draft previewBuilt into DIR's portalLets you review and edit an uploaded file before final submission; clear error messages when an upload failsIt is the filing systemFree; draft review only for files with fewer than 250 employees
XML NotepadXML editor from Microsoft“Instant XML schema validation” against an XSD such as DIR's V2 schema; structure onlyNone; you upload the file yourselfNot stated; source code published on GitHub
CertifiedPayrollProCertified payroll reporting toolReadiness check of registration, license and worker details; pay checked against the project's determination by classification; California daily overtime over eight hours flaggedXML “in the format the DIR's schema (CPR.xsd) defines”; California A-1-131From $49 a month; 3 free reports to start
LCPcertified (LCPtracker)Certified payroll reporting tool“Over 50 powerful validation checks, including state-specific wage determinations”XML format option for DIR's website upload$12 a report
eBaconConstruction payroll with certified reportingNot stated on the page readGenerates both V1 and V2 DIR XML files for jobs set up for DIR reportingNot stated on the page read
Payroll4ConstructionConstruction payroll serviceTracks wage determinations; a specific pre-filing check not statedReports “generated and submitted directly to the DIR's system”Not stated on the page read
MiterConstruction payroll and HRAn authorized signer reviews and signs; automated wage checks not statedDIR XML export and direct submission to the California portalNot stated on the page read
BuildalyticSubcontractor payroll collection and review, for general contractorsEach sub's weekly payroll checked for classification, base rate, fringe, overtime and apprentices against the wage determination; missing weeks flaggedProduces the DIR eCPR XML file from the checked data; your team reviews, certifies and submits to DIRCertified payroll quoted per project; Brody's published communications price does not cover it

Sources: California DIR: eCPR XML submission FAQ (checked November 27, 2026); Microsoft: XML Notepad (checked November 27, 2026); CertifiedPayrollPro: California certified payroll (checked November 27, 2026); CertifiedPayrollPro: pricing (checked November 27, 2026); LCPtracker: LCPcertified (checked November 27, 2026); eBacon: DIR eCPR XML V2 update for California contractors (checked November 27, 2026); Payroll4Construction: handling DIR filing (checked November 27, 2026); Miter: certified payroll (checked November 27, 2026); Buildalytic: certified payroll software; Buildalytic: California certified payroll and DIR eCPR reporting

When a reporting or payroll tool is the better choice

If you are a subcontractor filing your own payroll, you need a tool that builds the file from the payroll you run. CertifiedPayrollPro documents the most California checks on its own page: a readiness check modeled on the A-1-131 form, pay checked against the linked determination and daily overtime flagged, from $49 a month with 3 free reports. LCPcertified lists over 50 validation checks and a DIR XML option at $12 a report.

If you want payroll and reporting in one place, eBacon says it generates V1 and V2 DIR XML for jobs set up for DIR reporting, Miter documents direct submission to the California portal, and Payroll4Construction says it generates and submits reports to DIR for you. For your own crew's payroll, these are the tools to compare.

Sources: CertifiedPayrollPro: California certified payroll (checked November 27, 2026); CertifiedPayrollPro: pricing (checked November 27, 2026); LCPtracker: LCPcertified (checked November 27, 2026); eBacon: DIR eCPR XML V2 update for California contractors (checked November 27, 2026); Miter: certified payroll (checked November 27, 2026); Payroll4Construction: handling DIR filing (checked November 27, 2026)

When free checks are enough

If your payroll system already exports V2 XML and your crew is small, DIR's draft preview plus a schema check in XML Notepad will catch most format problems at no software cost. They will not tell you that a worker was paid below the determination or that a deduction total is wrong. Check those by hand against the determination before you sign.

Sources: California DIR: eCPR XML submission FAQ (checked November 27, 2026); Microsoft: XML Notepad (checked November 27, 2026)

When you are the general contractor checking every sub

Each sub files its own eCPR, but a general contractor still carries the risk when a sub's payroll is late or wrong. Miter says plainly that it “is not a portal for collecting reports from subcontractors.” Tools for this job collect and check every sub's week.

Buildalytic is built for that job. It collects each subcontractor's weekly payroll, checks wages, fringe and classifications against the wage determination, and flags missing weeks and errors before anything is filed. Findings go to your reviewer with the source payroll attached. From the checked data it produces the DIR eCPR XML file for the upload. Brody, Buildalytic's AI assistant, calls or texts the sub's payroll contact for the exact missing or corrected week, and the original, the correction and the reviewer's decision stay on one record.

The limits are plain. Payroll review in Buildalytic is not the DIR submission. Buildalytic produces the XML file, and your team, or each sub, certifies and submits it to DIR. The DIR receipt is kept with the period. Certified payroll is quoted per project.

Sources: Miter: certified payroll (checked November 27, 2026); Buildalytic: certified payroll software; Buildalytic: California certified payroll and DIR eCPR reporting

How to choose

Bring one real week to each demo: a worker with daily overtime over eight hours, a worker in two classifications and a deduction total you changed by a dollar. Ask each vendor to show the V2 file, which errors it flags and who submits to DIR. Then upload the file to DIR as a draft and compare.

Common questions

How do I submit certified payroll to California DIR?

Log in to DIR's Public Works Website Services, find the project, and choose Submit with the online form or an XML upload. For XML, pick schema version 2.0 and, if the file has fewer than 250 employees, upload it as a draft to preview it. Sign, submit and keep the receipt. Mark the last payroll for the job as final.

What tools catch eCPR errors before upload?

For format errors, DIR's draft preview and a schema checker such as XML Notepad. For payroll errors, a tool that checks pay against the wage determination: CertifiedPayrollPro and LCPcertified document these checks for your own payroll, and Buildalytic checks every subcontractor's weekly payroll for a general contractor before anything is filed.

Does passing DIR's XML validation mean my payroll is right?

No. DIR's FAQ says schema validation checks the structure of the file, not data accuracy. A wrong deduction total, an underpaid rate or a wrong classification can all pass. Check the figures against the payroll record and the determination.

When does DIR stop accepting V1 XML files?

DIR says V1 submissions are supported until January 13, 2027. eBacon says it retires its own V1 reports on December 18, 2026. Switch your export to V2 now and test it as a draft.

Can I preview every XML upload before it is submitted?

No. DIR's FAQ limits draft review to files with fewer than 250 employees. A larger file is submitted instead of saved as a draft, so verify it before you upload.

Does Buildalytic file eCPR with DIR for us?

Your team, or each sub, certifies and submits to DIR. Payroll review in Buildalytic is not the agency submission. Buildalytic collects and checks each subcontractor's payroll and produces the DIR eCPR XML file from the checked data, and the DIR receipt is kept with the period.

How much does eCPR software cost?

DIR's portal and draft preview are free. CertifiedPayrollPro starts at $49 a month with 3 free reports, and LCPcertified lists $12 a report. eBacon, Miter and Payroll4Construction did not publish a price on the pages we read on November 27, 2026. Buildalytic quotes certified payroll per project.

Sources and editorial notes

  1. California DIR: certified payroll reporting (checked November 27, 2026)
  2. California DIR: eCPR XML submission FAQ (checked November 27, 2026)
  3. Microsoft: XML Notepad (checked November 27, 2026)
  4. CertifiedPayrollPro: California certified payroll (checked November 27, 2026)
  5. CertifiedPayrollPro: pricing (checked November 27, 2026)
  6. LCPtracker: LCPcertified (checked November 27, 2026)
  7. eBacon: DIR eCPR XML V2 update for California contractors (checked November 27, 2026)
  8. Payroll4Construction: handling DIR filing (checked November 27, 2026)
  9. Miter: certified payroll (checked November 27, 2026)
  10. Buildalytic: certified payroll software
  11. Buildalytic: California certified payroll and DIR eCPR reporting

Prepared with AI assistance. Reference date: 2026-11-27. Worked scenarios use typical figures and are not customer results. Product details can change; confirm the current scope and terms before rollout.

Bring one workflow to a demo.

Start with a demo on your own work, then go live on one real project.