Skip to content
Buildalytic

AI construction estimating. Every number traced to its source.

Buildalytic is AI construction estimating software for general contractors and trades. Brody, its AI agent, does AI takeoff from your drawings, turns quantities into labor with your own production rates, runs AI estimate review for double counting, missed scope and alternates, levels sub bids against your scope and checks your price against past bids. He calls subs for what is missing. Your estimator sets the number.

Bid day review · Northgate Fire Station

Base bid and 3 alternates · Example

Needs action: 2 open items
Takeoff
214 quantities, each linked to its sheet
Carried twice
Firestopping, in drywall and in fire protection
Not found
Fire alarm, in one electrical bid
Alternates
3 kept apart from the base bid
Benchmark
In range of 5 past fire stations

Brody · texted the electrical sub to confirm the fire alarm scope

AI construction estimating. From takeoff to handoff.

AI takeoff measures the drawings. AI estimate review checks the whole bid. Brody does both, works from your own costs and production, and goes back to the subs for what is missing.

Measures
Quantities from drawings by scope and location, with scale, revision and the drawing reference saved
Builds up
Labor hours, crews and cost from comparable past work, with quantity and unit rate kept separate
Reviews
The estimate for double counting, missed scope and alternates, and each sub bid against your scope
Leaves to you
The productivity judgment, every unit rate, the number and the award

Seven jobs. From the drawings to the PM.

What Brody does on each estimating job, what he writes and where, and who makes the decision.

All preconstruction workflows
What Brody does on each estimating job, where he writes it and who approves
JobWhat Brody doesWhat he writes and whereWho approves
Takeoff and quantitiesConfirms scale and revision, then counts or measures by scope and location. Saves the drawing reference and assumption for each quantity and reconciles revisions before pricing.A quantity list by scope and location, each line linked to its sheet, handed to pricing.Your estimator checks the quantities.
Production rates and build-upChooses comparable historical production, adjusts for crew, site, access and schedule, and converts quantities into labor hours, crews and cost. Keeps quantity and unit rate separate.Labor and crew lines in the estimate, each rate shown with the past jobs it came from.Your estimator makes the productivity judgment.
Estimate reviewTraces each change to a quantity, unit rate, scope item or allowance. Flags scope carried twice, shows scope no bid prices as not found, checks totals and marks open assumptions.A review list on the estimate, each flag with its source line.Your estimator decides what to change.
Alternates and scenariosKeeps base bid and alternates apart, isolates mutually exclusive alternates so each is added once and reconciles changes by phase.Base and alternate totals side by side, with the exposure of each scenario.Your estimator and executives choose what to carry.
Bid leveling and scope gapsReads each sub quote, lines it up against your scope sheet, flags gaps, exclusions, qualifications, alternates and allowances with the source line, and asks the sub for what is missing.The leveling sheet by trade, with every clarification and reply.Your estimator accepts the clarifications and makes the award.
Bid history and benchmarksPulls past jobs and prices with the date, scope, unit, region and context intact, and adjusts for comparable conditions. Shows gaps instead of a guaranteed win rate.Answers with each figure linked to its invoice, commitment or past bid.Your estimator decides what a past price means for this bid.
Handoff to operationsFreezes the award scope and estimate, maps budget codes and hands over exclusions, assumptions, vendor quotes, quote validity, long leads, procurement owners and open RFIs.A handoff record for the PM and superintendent, with budget codes mapped.Your estimator and PM sign off on the handoff.

Brody does the measuring, tracing and asking. Your estimator sets every quantity, rate and price.

One bid. From the drawings to the handoff.

A fire station bid with three alternates. Brody’s steps carry the blue dot.

  1. Day 1

    Takeoff from the drawings

    Brody confirms the scale and Addendum 2, then measures partitions, ceilings, doors and slab by floor, with each sheet saved.

  2. Day 2

    Labor from past jobs

    Partition labor is built from three comparable jobs and their daily reports. Your estimator adjusts the crew for a tight site.

  3. Day 3

    Sub bids leveled

    Four drywall bids lined up on your scope sheet. One excludes firestopping. Brody texts the sub, who adds it back.

  4. Day 4

    Estimate review

    Firestopping is carried twice. Alternate 2 is kept apart. Fire alarm is not found in one electrical bid. Each flag cites its line.

  5. Bid day

    The estimator sets the number

    Cost per square foot sits in range of five past stations. Your estimator clears the flags and signs the bid.

  6. After award

    Handoff to the PM

    Exclusions, long-lead overhead doors, quote validity and two open RFIs go to the PM with budget codes mapped.

Labor line · Interior partitions

Northgate Fire Station · Example

On track: Reviewed
Quantity
18,400 SF, from A-101 to A-103, Addendum 2
Rate basis
3 comparable jobs and their daily reports
Adjusted for
Tight site and second-floor access
Kept apart
Quantity and unit rate, on separate lines
Decided by
Your estimator

Brody · linked each past job to the rate it supports

A spreadsheet shows the gap. Brody asks the sub.

Scope questions by call, text and email, from your company number, before bid day.

Text thread · Electrical bidder

Northgate Fire Station · from your company number

  1. Brody · Day 4, 9:10 AM

    Hi Dana, this is Brody, the AI assistant for Harbor Builders. Your electrical bid for Northgate Fire Station does not mention the fire alarm system in spec 28 31 00. Is it included, excluded or priced separately?

  2. Dana, Summit Electric · 9:40 AM

    Included. I will send a revised proposal that lists it.

  3. Brody · 9:41 AM

    Thanks. I noted it as included and told Priya, our estimator. I will add your revised proposal to the leveling when it arrives.

Questions that reach bidders

Brody calls, texts and emails each bidder in their language. He says he is an AI assistant for your company. He never pretends to be a person.

  • One clear question per gap, with the spec section
  • No app or login for anyone who answers
  • Every answer recorded on the leveling sheet
  • Your estimator sees each reply before bid day

Four steps. The estimator decides.

Start with one bid: the drawings, your estimate and the sub quotes you already have.

  1. Give Brody the bid

    The drawings and addenda, your estimate or estimating export, the sub quotes and where your past jobs live.

  2. Brody measures and checks

    Quantities by scope and location, labor from past production, alternates kept apart and scope carried twice flagged.

  3. Brody asks for what is missing

    A call, text or email to the sub, or to your own people, for the missing scope or record.

  4. You review and decide

    Check each quantity and flag against its source. The number and the award are your decisions.

AI estimating tools. Compared fairly.

What each tool is known for, when it is the better fit, and how Brody works with it. Brody adds the review, the leveling and the calls to subs.

AI construction estimating and takeoff software compared
ToolKnown forThe better fit whenHow Brody works with it
BuildalyticAI takeoff, production rates from your own jobs, estimate review, bid leveling and bid history in one assistant. Brody calls and texts subs for what is missing.You want the estimate checked end to end against your own records, and someone to go back to the subs.Runs these jobs itself, or works beside your estimating software and checks what it produces.
STACKTakeoff and estimating. AI Takeoff detects walls, rooms, doors and windows for counts, lengths and areas the user reviews. STACK IQ connects Claude, ChatGPT or Copilot to edit takeoffs and check estimates.You want cloud takeoff and estimating in one tool, with AI takeoff on floor plans.Measure in STACK. Brody levels sub bids, reviews the assembled estimate and calls subs for missing scope.
Togal.AIAI takeoff that reads drawings and returns quantities, drawing comparison that shows what moved or changed, AI search and Togal.CHAT for questions about your drawings.You bid many plan sets and want automated takeoff for GC and finish trades.Togal does the takeoff. Brody reviews the estimate and follows up with subs.
Beam AIAI takeoff and estimating, with every takeoff reviewed by its quality assurance team. Covers HVAC, plumbing, electrical, concrete, civil, roofing and more.You would rather send plans out and get a reviewed takeoff back than run software yourself.Beam returns the quantities. Brody builds labor from your rates and reviews the estimate.
KreoCloud AI takeoff with Auto Measure and Auto Count, and Caddie, an AI agent that reads drawings and produces quantities. Built for quantity surveyors, estimators and contractors.You want AI measurement and an AI takeoff agent in a cloud tool.Kreo measures. Brody levels the sub bids and checks the estimate before bid day.
BuildxactEstimating and job management for residential builders. Its AI, Blu, covers takeoff, estimate review for missing costs and risks, supplier assemblies and a chat assistant. Changes wait for your approval.You build or remodel homes and want estimating tied to supplier pricing and the job.Brody texts trades and suppliers for the quotes and answers the estimate still needs.
HCSS HeavyBidHeavy civil estimating for self-performing contractors. Estimate Builder, an AI agent in beta, drafts a first estimate from project documents or pay items using your HeavyBid history, with AI values flagged for review.You self-perform civil or infrastructure work and bid by pay item.Brody levels sub and supplier quotes and asks for what is missing.
Procore EstimatingTakeoffs, estimates and proposals in one product, with AI that detects floor plan areas and auto-counts symbols. Procore also lists Bid Leveling and Bid Analyst agents.Your projects run in Procore and you want estimating in the same system.Brody calls subs about the gaps a leveling shows and reviews the assembled estimate.
HandoffAI estimates for residential work from a typed scope, a photo or a floor plan, priced with local costs by ZIP code. For remodelers, home builders and trade contractors.You price remodels and residential jobs from a short scope.Brody follows up on each sent quote by call and text until the customer answers.

Vendor details from each vendor’s own website, help center or announcement, checked November 28, 2026. Products change, so confirm with the vendor.

When another tool fits better. A fair read.

Many estimators keep one of these for takeoff or pricing and add Brody for review and follow-up.

  • Takeoff is most of your week

    Togal.AI, STACK and Kreo are built around high-volume AI measuring. Brody can level the bids and review the estimate after.

  • You want takeoffs done for you

    Beam AI returns takeoffs reviewed by its own team. Brody builds the labor and checks the estimate.

  • You self-perform heavy civil

    HCSS HeavyBid is built for pay-item bidding and self-performed work.

  • You build or remodel homes

    Buildxact and Handoff are built for residential estimates and supplier pricing.

  • You run everything in Procore

    Procore Estimating and its bid agents keep takeoff, estimates and leveling inside Procore.

  • You keep your estimating suite

    Stay in it. Brody reviews the exported estimate, levels quotes and answers past cost questions beside it.

Common questions. Answered plainly.

Something else? Ask the team

What is the best AI construction estimating software?

It depends on the step you want AI to take. Togal.AI, STACK and Kreo focus on AI takeoff. Beam AI returns reviewed takeoffs as a service. Buildxact and Handoff serve residential builders, HCSS HeavyBid serves heavy civil, and Procore Estimating keeps estimates in Procore. Buildalytic is AI construction estimating software that measures quantities, builds labor from your own production rates, reviews the estimate for double counting and missed scope, levels sub bids and benchmarks against your bid history, with Brody calling subs for what is missing.

Can AI or ChatGPT do construction estimates?

AI can measure, price and check an estimate, but it needs your drawings, unit costs and production rates to be useful, and an estimator still sets the bid. A general chatbot does not know your costs unless you give them. STACK IQ and JobTread’s AI Connector link Claude or ChatGPT to estimating data. Brody works from your own invoices, commitments, past bids and daily reports and shows the source for each number.

Can AI do construction takeoffs?

Yes, with review. Togal.AI, STACK, Kreo and Procore detect rooms, walls, doors and symbols from drawings, and Beam AI has its team review each takeoff. Brody confirms scale and revision, measures by scope and location and saves the drawing reference for every quantity, so your estimator can check each line against its sheet.

What is the best software for construction takeoffs?

For AI takeoff, contractors look at Togal.AI, STACK, Kreo and Beam AI, and Procore users can take off inside Procore Estimating. Pick by trade and plan type, and test on a recent bid where you already know the quantities. Brody adds review, leveling and sub follow-up on top of whichever takeoff you trust.

What is the most popular construction estimating software?

The names that come up most in AI answers and review sites are STACK, PlanSwift, On-Screen Takeoff and Bluebeam for takeoff, Sage Estimating and Procore for commercial estimating, HCSS HeavyBid for heavy civil and Buildxact for residential builders. Many estimators pair a takeoff tool with a pricing tool or spreadsheet. Brody works beside either and reviews the result.

What is AI estimate review?

A check of the assembled estimate before the bid goes out. Brody traces each change to a quantity, unit rate, scope item or allowance, keeps base bid and alternates apart, flags scope carried in two trades, shows scope no bid prices as not found, checks totals and marks open assumptions. Each flag cites its source line, and your estimator decides what to change.

Will AI replace our estimator?

Your estimator stays in charge. Brody does the measuring, tracing, leveling and asking. Your estimator checks the quantities, makes the productivity judgment, sets every unit rate and the final number, and your executives decide what to bid.

Can it use our own historical costs and production rates?

Yes. Ask what you paid or bid on comparable jobs and Brody answers from your invoices, commitments and past bids, with each figure linked to its document. Production rates come from comparable past work and your daily reports. Where a record is missing a quantity or scope, Brody asks the person who owns it.

What happens to our estimates and cost data?

They stay your data. Your estimates, unit costs and bid history are never sold and never used to train models for other companies. Brody works within the permissions your admin sets.

How is it priced?

From $25 per office user per month, billed annually. Crews and subs are free. No setup fee. Start with a demo on your own bid list, daily report template or main line. Then go live on one real project, with no setup fee. Paid use stays off until an administrator sets a spending limit.

Bring one bid and its drawings.

Share the drawings, your estimate and two or three sub quotes. See the quantities with their sheets, the alternates kept apart and every gap flagged with its source.