Safety follow-up, by text and call.
Buildalytic is construction safety software for contractors. Brody sends toolbox talks by text in each crew’s language and records each sign-off, takes incident and near-miss reports by call or text, and follows up on corrective actions until each one is closed with evidence. Crews use any phone, with no app and no login.

One near miss. From the call to closed.
A pallet slips off the forks at the Elm Street gate. Nobody is hurt. Here is what happens next.
- Tue 7:05 AM
Toolbox talk goes out
Forklift and laydown safety, sent by text to the Elm Street crews in English and Spanish.
- 7:30 AM
Crews sign off by reply
Each reply is logged on the job. Brody texts the two workers who have not answered.
- 10:40 AM
The foreman calls it in
A pallet of block slipped off the forks at the east gate. Nobody was hurt.
- 10:42 AM
Brody takes the report
Where it happened, who was there and two photos by text. The report goes to Dana, the safety lead.
- 11:30 AM
Dana assigns the fix
Level the laydown area and brief the forklift operators, owned by the site foreman.
- Wed 4:00 PM
Brody follows up
He asks the foreman for a photo of the leveled area and the briefing sign-offs.
- Thu 8:15 AM
Closed with evidence
Dana reviews the photo and closes the action. The daily log carries the safety note.
Corrective action 014 · Laydown leveled
Elm Street · East gate
- Source
- Near miss called in by the foreman, Tue 10:40 AM
- Owner
- Site foreman
- Evidence
- Photo of the leveled area and the briefing sign-offs
- Reviewer
- Dana, safety lead
- Record
- The job’s corrective actions and Thursday’s daily log
Brody · followed up by text, evidence filed to the job
Safety software. With someone doing the follow-up.
Most safety tools hold the form. Brody also reaches the person who owes the next step, by text or call, until it is done.
- Sends
- Toolbox talks, site rules and hazard alerts by text, in each person’s language, acknowledged by reply
- Takes
- Incident and near-miss reports and observations by call or text, with photos, routed to your safety lead
- Follows up
- JHA and SWPPP corrective actions with the person assigned, until each one is closed with evidence
- Keeps
- Worker certifications with their expiry dates, and the safety data sheets for each job
Every safety item. With an owner and a date.
Toolbox talks, reports, corrective actions, SDS and certifications, on the same company number and job record.
Toolbox talks by text
The topic goes to each crew in the language on each person’s card. Workers acknowledge by reply, and every reply is logged on the job.
Incidents and near misses
A foreman calls or texts the company number. Brody records the facts, the photos and the corrective owner, and routes the report to your safety lead.
Observations with photos
A photo texted from the field is filed to the right job, area and date, and lands in that day’s report.
Corrective actions to closure
JHA and SWPPP actions followed up with the person assigned until each one is closed with evidence. Items still open go to your reviewer.
SDS answers by text
A worker texts the product name. Brody sends the safety data sheet, pointed to the section they asked about, in their language.
Certifications and expirations
OSHA 10 and 30, first aid and equipment cards with their real expiry dates. Brody asks for the new card before one lapses.
Pre-cover photos
Crews text photos before work is covered. Brody files them and follows up with each trade for the documents and confirmations still missing.
Safety notes in the daily report
The daily report call covers safety and toolbox talks in your template’s order, and the notes go to the daily log.
Four steps. Every item reaches a person.
Routine reminders close on their own. Anything still open goes to the reviewer your rule names.
Send the talk
Toolbox topics, site rules and hazard alerts by text to the right crews, in each person’s language.
Take the report
Incidents, near misses and observations by call or text, with photos, routed to the safety lead.
Follow up
Corrective actions followed up with the person assigned, on the schedule your rule sets.
Close with evidence
Your reviewer checks the photo or signed record and closes the item. The job keeps the history.
Your people decide. Brody does the follow-up.
Brody gets the facts and the evidence to the right person fast. The decisions stay with your team.
Emergencies
People call emergency services and follow your emergency response procedure. Brody does not replace an emergency response procedure or a competent person’s judgment on site safety.
Site safety decisions
A competent person decides whether a hazard is controlled and when work can resume. Your inspector or super decides when work is covered.
Recordability and reporting
Your safety lead decides recordability and makes any report to OSHA. Brody makes sure they have the facts and photos quickly.
Construction safety software. Compared plainly.
From each vendor’s own website. Safety platforms hold the forms and the inspections. Brody does the follow-up by text and call, and works beside them.
| Tool | What it covers | How crews take part | Pricing model | The better choice when |
|---|---|---|---|---|
| Buildalytic | Toolbox talks by text with sign-off by reply, incident and near-miss reports by call or text, corrective actions followed to closure, SDS by text and certification recalls | Any phone, by call or text, in their own language, with no app and no login | Per seat or per company. An Operator seat with Brody is $69 a month ($59 billed annually). Crews and subs are free | Safety items stall waiting on people in the field, or your crews speak several languages |
| Procore Quality & Safety | Incidents, including near misses and illnesses; inspection checklists from templates; observations with corrective actions. Safety Hub, in open beta since May 2026, brings them together, and its Site Safety Agent finds hazards in site photos, videos and drawings | Procore on any smart device, with push and email notifications for assigned work | Not published. An annual fee by product and annual construction volume, with unlimited users | Your projects already run in Procore and your field team works in its app |
| HeavyJob Safety (HCSS) | Toolbox talks from hundreds of templates, JHAs, inspections, incidents, near misses and observations, with training checked before a worker is assigned | Crew members tap their name and sign on the foreman’s device; observations from any device with no login; works with no signal | Not published. Licensed separately from HeavyJob | You are a heavy civil contractor on HeavyJob, with sites that lose signal |
| Mitti (by SafetyCulture) | Inspections as connected workflows, incident reporting, issues captured from photos or voice notes, training, assets and contractor management | The Mitti app for frontline teams | Published per seat plans, a free plan for small teams, and location-based pricing on request | Safety is one part of inspections and operations across many sites |
| HammerTech | Orientations, safety meetings with digital sign-offs and QR check-in, observations, incidents and injuries, inspections, permits, SDS and subcontractor management | QR check-in on site; subcontractors use it free through the GC | Not published. Based on annual construction volume and active job sites, with no per-seat fees | You want one platform for orientations, permits and sub safety across many sites |
| Contractor Foreman | All-in-one project software with safety meetings from 800+ toolbox topics, many in both English and Spanish, and incidents with automatic OSHA 300 log entries | Attendance, photos and notes tied to each meeting | Published plans by number of users, with a 30-day free trial | A small contractor wants safety meetings inside all-in-one project software |
| Raken | Daily reports with 150+ toolbox talks and a starter pack in English and Spanish, bulk scheduled from the office, plus incidents, observations and checklists | Signatures on a shared device, or a paper sheet photographed and attached | Not published on the page we read | Your supers already file daily reports in Raken. Brody can turn a super’s call into a Raken daily report |
Vendor details from each vendor’s own website, checked November 28, 2026.
Related workflows. Works with the rest of Brody.
Common questions. Answered plainly.
Something else? Ask the team
What is construction safety software?
Construction safety software records toolbox talks, observations, inspections, incidents and corrective actions, so a hazard found on site gets fixed and the fix is on record. Buildalytic is construction safety software that works by text and phone call. Brody sends each toolbox talk to the crews in their language and records each sign-off by reply, takes incident and near-miss reports, and follows up on every corrective action until it is closed with evidence. Your safety lead reviews and decides.
What is the best construction safety software?
It depends on where the work stalls. Procore Quality & Safety, HeavyJob Safety, HammerTech and Mitti (by SafetyCulture) run inspections, incidents and observations inside their own apps, and Contractor Foreman and Raken add toolbox talks to project or daily report software. Buildalytic adds the follow-up by text and call: toolbox talks in each crew’s language with sign-off by reply, incident reports by phone and corrective actions followed up to closure. A team can keep its safety platform and add Brody for the follow-up.
Is there a toolbox talk app that works by text?
Yes. Brody sends the toolbox topic by text from your company number to each crew, in the language on each person’s card. Workers acknowledge by reply on any phone, with no app to install, and every reply is logged on the job. Formal safety training should still use your own reviewed materials.
How do workers report an incident or near miss?
They call or text the company number. Brody records the facts, the photos and the corrective owner, and routes the report to your safety lead. Sensitive details go only to the people your rule names. Under OSHA’s rules, an employer reports a work-related fatality within 8 hours, and an in-patient hospitalization, amputation or loss of an eye within 24 hours. Your safety lead decides recordability and makes any report.
Can Brody follow up on corrective actions?
Yes. Brody follows up on JHA and SWPPP corrective actions until each one is closed with evidence. He asks the person assigned for the response and the proof, such as a photo or a signed record, on the schedule your rule sets. Items still open go to the safety or project reviewer your rule names. Your reviewer decides whether a hazard is controlled or a permit condition is met.
Can crews get a safety data sheet by text?
Yes. A worker texts the product name to the company number and Brody sends the safety data sheet, pointed to the section they asked about, such as handling or first aid. A question in Spanish gets the answer in Spanish. Keep the library, binder or QR code posters your hazard communication program calls for.
Does Brody track worker certifications?
Yes. Each workforce profile holds training records such as OSHA 10 and OSHA 30 and certificates with their actual expiry dates. Before one lapses, Brody texts or calls the worker about the renewal and asks for a photo of the new card. The new date goes on the profile and into your HR record, and the safety team sees anything still open.
Do workers need an app or a login?
No. Crews, foremen and subs work with Brody by call and text on any phone, in their own language. Office and safety staff use the Buildalytic browser workspace. Free participants for crews, subs and clients. Their calls, messages and AI work use the company pool.
Who stays responsible for site safety?
Your people. A competent person decides whether a hazard is controlled and when work can resume, and your safety lead decides recordability and makes any report. Brody does not replace an emergency response procedure or a competent person’s judgment on site safety. He does the follow-up, so your safety team spends more time in the field.
What does it cost?
Buildalytic is priced by seat, with usage pooled across your company. A Communications seat is $25 per person per month billed annually ($30 month to month) for phones, texting and job chat. An Operator seat, which adds Brody, is $59 billed annually ($69 month to month). Companies that keep their own phone system can use Brody plans from $199 per company per month. Crews, subs, suppliers and clients are free, there is no setup fee, and Enterprise is quoted in writing.
Bring one open corrective action.
Share a toolbox topic and one open item. See Brody send the talk in each crew’s language and follow up until the item is closed with evidence.
