The short answer
The best AI estimating software depends on which step you want AI to take: measuring the drawings, building the price or checking the bid before it goes out. Buildalytic is AI construction estimating software: Brody does AI takeoff with the drawing reference saved for each quantity, builds labor from your own production rates, reviews the estimate for double counting, missed scope and alternates, levels sub bids and checks your price against past bids, and your estimator sets the number. Togal.AI, STACK and Kreo lead on AI takeoff, Beam AI returns QA-checked takeoffs as a service, Procore Estimating keeps takeoff and estimates in Procore, HCSS HeavyBid serves heavy civil, and Buildxact and Handoff serve residential builders.
What to take away
- Decide which step you want AI to take: the takeoff, the build-up or the review before bid day.
- AI takeoff is fastest on clean, repetitive drawings. Your estimator still checks scale, revision and every assumption.
- Test each tool on a recent bid where you already know the quantities and the final number.
- STACK, Togal.AI, Kreo, Beam AI and Buildalytic publish prices. The others here quote or show no price on the pages we read.
Three kinds of AI estimating software
Buyers split this category three ways. AI takeoff tools measure the drawings. Togal.AI, STACK, Kreo, Autodesk Takeoff and ConstructConnect's Takeoff BOOST detect, count and measure what is on the sheet, and Beam AI does the takeoff for you and checks it before delivery.
Estimating platforms build the price around those quantities. STACK and Procore Estimating carry takeoff into estimates and proposals, HCSS HeavyBid serves heavy civil bidding by pay item, and Buildxact and Handoff serve residential builders and remodelers.
Review and follow-up tools check the whole bid and go back to the subs. This is where Buildalytic fits: Brody measures quantities with the drawing reference saved, builds labor from your own production rates, reviews the assembled estimate for double counting, missed scope and alternates, levels sub bids and calls subs for what is missing.
Facts and prices below were copied from each vendor's own website, help center or announcement on November 28, 2026. The order groups tools by kind and is not a ranking. Buildalytic makes one of the options.
What to compare
A fast takeoff is only useful if the number it feeds is right. Compare tools on the points below.
- Takeoff: what does the AI detect and measure, on which plan types and trades, and can you check each quantity against its sheet?
- Scale and revisions: does it confirm scale on every sheet and show what changed between drawing sets?
- Pricing: does the estimate use your own unit costs and production rates, or a generic cost database?
- Review: does anything check the assembled estimate for scope carried twice, scope nobody priced and alternates mixed into the base bid?
- Sub bids: are quotes leveled against your scope, and who asks the sub for what is missing?
- History: can an estimator ask what you paid or bid on comparable jobs and see the source?
- Approval: does every AI value wait for your estimator, and is it marked as AI?
- Pricing model: per user, per trade, a managed service or per company.
Eleven options at a glance
“Not stated” means the vendor's pages we read don't say; ask them.
| Software | Kind | AI takeoff | Estimate build-up and review | Sub bids and follow-up | Published price |
|---|---|---|---|---|---|
| STACK | Cloud takeoff and estimating | Measures linear, area, count and volume, with AI auto-counting symbols and suggesting scope you might miss | Estimates from items and assemblies with regional cost data; AI “flags risk, gaps, and pricing drift before the final bid goes out”; STACK IQ lets ChatGPT, Claude or Copilot modify a takeoff or check an estimate | Not stated on the pages read | Takeoff & Estimate from $299 per user a month, with a free version; full platform from $348 per user a month |
| Togal.AI | AI takeoff | “Automatically detects, measures, counts, classifies and compares material quantities”; tracks what changed in a revised set; image search across every sheet; Togal.CHAT answers questions from your own drawings | Not stated on the pages read | Not stated on the pages read | Growth $299 per user a month, billed yearly, with unlimited automated takeoffs; Business custom for teams of 4 or more |
| Beam AI | AI takeoff and estimates, as software or done for you | AI extracts quantities, with “every takeoff QA-checked before delivery”; HVAC and mechanical, concrete, electrical, plumbing, steel, civil, utilities, roofing and more | QA-checked estimates as well as takeoffs, in 24 to 72 hours | Not stated on the pages read | Do It Yourself from $8K a year per trade; Done For You from $25K a year |
| Kreo | Cloud AI takeoff | Auto Measure detects and measures rooms, walls, doors, windows and custom areas; Auto Count finds every matching object; Caddie, an AI agent, reads drawings and delivers quantities | Its Business plan is described as AI estimating for teams | Not stated on the page read | Pro, with AI takeoff, $175 per user a month billed annually, for 1 to 4 seats; Business $250 per user a month with 5 seats included; 7-day free trial |
| Autodesk Takeoff | Takeoff in Autodesk Forma | Automated Symbol Detection “automatically detects and counts all matching symbols on the drawing” | Not stated on the page read | Not stated on the page read | Not stated on the page read |
| ConstructConnect Takeoff BOOST | AI built into On-Screen Takeoff, PlanSwift and ConstructConnect Takeoff | Automated takeoff of areas, lengths and counts; auto count of objects, annotations and callouts; results “ready for review and fine-tuning” | Not stated on the page read; features vary by product | Not stated on the page read | Not stated on the page read |
| Procore Estimating | Takeoff, estimates and proposals inside Procore | AI detects floor plan areas and auto-counts repeated symbols | Takeoff data flows into the estimate; material prices, labor units and margins adjusted there; customer-facing proposals | Bid Leveling Agent compares sub bids in one matrix; Bid Analyst Agent checks bids against your scopes, drawings and specs | Not published |
| HCSS HeavyBid | Heavy civil estimating | Not stated on the page read | Estimate Builder Agent, in beta, builds a first-pass estimate from pay items or project documents using your HeavyBid history; every AI value flagged for review; general availability planned for February 2027 | Not stated on the page read | Not stated on the page read |
| Buildxact | Estimating and job management for residential builders | Blu's takeoff skill auto-scales and auto-measures uploaded plans | Estimate Generator drafts an editable estimate; Estimate Reviewer shows what you might have missed; the assembly skill prices items from your preferred supplier; “Blu suggests, and you decide” | Not stated on the page read | Takeoff and Estimate Reviewer included on Master and add-ons on Pro; plan prices not on the help page read |
| Handoff | AI estimates for residential construction | AI takeoff from blueprints, or a site walkthrough | A complete estimate from your scope, blueprints or photos, priced by ZIP code | Not stated on the page read | Not stated on the page read; 7-day free trial |
| Buildalytic | AI estimating: takeoff, build-up, review, leveling and bid history | Confirms scale and revision, measures by scope and location and saves the drawing reference and assumption for each quantity | Labor and crews from comparable past work and your daily reports; estimate review flags scope carried twice, scope no bid prices and open assumptions, keeps base bid and alternates apart and cites the source line for each flag | Each sub quote leveled against your scope sheet; Brody asks the sub by call, text or email for what is missing | Operator seat with Brody $69 a month ($59 billed annually) or Brody Starter $239 per company ($199); bid leveling on Brody Pro at $599 a month ($499); crews and subs free |
Sources: STACK: construction takeoff and estimating software (checked November 28, 2026); STACK: STACK IQ (checked November 28, 2026); STACK: pricing (checked November 28, 2026); Togal.AI: AI takeoff software (checked November 28, 2026); Togal.AI: takeoff software for general contractors, including Togal.CHAT (checked November 28, 2026); Togal.AI: pricing (checked November 28, 2026); Beam AI: AI takeoffs and estimates (checked November 28, 2026); Beam AI: pricing (checked November 28, 2026); Kreo: AI takeoff software and plans (checked November 28, 2026); Kreo: pricing (checked November 28, 2026); Autodesk Forma: AI in construction, including Autodesk Takeoff (checked November 28, 2026); ConstructConnect: On-Screen Takeoff and Takeoff BOOST (checked November 28, 2026); Procore: estimating (checked November 28, 2026); Procore: AI agents (checked November 28, 2026); HCSS: fall 2026 product release (checked November 28, 2026); Buildxact help center: what is Blu? (checked November 28, 2026); Handoff: AI estimating for residential construction (checked November 28, 2026); Buildalytic: AI construction estimating software; Buildalytic: bid leveling software for general contractors; Buildalytic: pricing and usage (checked November 28, 2026)
When an AI takeoff tool fits better
If takeoff is most of your week, start with a tool built for it. Togal.AI detects, measures, counts and compares quantities, tracks what changed when you load a revised set and searches every sheet for a fixture or pattern. Its Growth plan is $299 per user a month, billed yearly, with unlimited automated takeoffs. Kreo's Auto Measure and Auto Count do the same kind of work, and its Caddie agent reads drawings and delivers quantities. Kreo Pro, its first plan with AI takeoff, is $175 per user a month billed annually. STACK pairs takeoff with estimating and has a free version of Takeoff & Estimate.
If you would rather not run the software at all, Beam AI extracts quantities with AI and QA-checks every takeoff before delivery, in 24 to 72 hours. Its self-service plan starts at $8K a year per trade and its done-for-you service at $25K a year. Beam AI reports 99%+ accuracy, a vendor figure with no method given. Teams already on On-Screen Takeoff or PlanSwift can use Takeoff BOOST, and Autodesk Forma users have symbol detection in Autodesk Takeoff.
Sources: Togal.AI: AI takeoff software (checked November 28, 2026); Togal.AI: pricing (checked November 28, 2026); Kreo: AI takeoff software and plans (checked November 28, 2026); STACK: pricing (checked November 28, 2026); Beam AI: AI takeoffs and estimates (checked November 28, 2026); Beam AI: pricing (checked November 28, 2026); ConstructConnect: On-Screen Takeoff and Takeoff BOOST (checked November 28, 2026); Autodesk Forma: AI in construction, including Autodesk Takeoff (checked November 28, 2026)
When an estimating platform fits better
If your projects run in Procore, Procore Estimating keeps takeoff, estimates and proposals in the same system and uses AI to detect floor plan areas and count repeated symbols. Its Bid Leveling and Bid Analyst agents check sub bids against your scopes, drawings and specs. Heavy civil contractors who self-perform and bid by pay item belong in HCSS HeavyBid. Its Estimate Builder Agent, in beta, drafts a first-pass estimate from your HeavyBid history and flags every AI value for review, with general availability planned for February 2027.
Residential builders and remodelers look at Buildxact and Handoff. Buildxact's Blu takes off uploaded plans, drafts and reviews estimates and prices assemblies from your preferred supplier, and Buildxact says Blu suggests and you decide. Handoff builds a residential estimate from your scope, blueprints or photos, priced by ZIP code.
Sources: Procore: estimating (checked November 28, 2026); Procore: AI agents (checked November 28, 2026); HCSS: fall 2026 product release (checked November 28, 2026); Buildxact help center: what is Blu? (checked November 28, 2026); Handoff: AI estimating for residential construction (checked November 28, 2026)
When the review and follow-up layer is the right choice
Many bid-day problems sit between the takeoff and the number: firestopping carried in two trades, a fire alarm system nobody priced, an alternate added into the base bid, a sub quote that leaves out part of the scope.
Brody confirms scale and revision, measures by scope and location and saves the drawing reference and assumption for each quantity. He converts quantities into labor hours, crews and cost from comparable past work and your daily reports, and keeps quantity and unit rate on separate lines. Before bid day he traces each change to a quantity, unit rate, scope item or allowance, flags scope carried twice, shows scope no bid prices as not found, keeps base bid and alternates apart, checks totals and marks open assumptions. Each flag cites its source line.
When a sub bid is missing scope, Brody calls, texts or emails the bidder from your company number. He says he is an AI assistant for your company, asks one clear question with the spec section and records the answer on the leveling sheet. Your estimator checks every quantity, makes the productivity judgment, sets every unit rate and the final number, and makes the award.
Sources: Buildalytic: AI construction estimating software; Buildalytic: preconstruction software; Buildalytic: bid leveling software for general contractors
How Buildalytic works beside the others
Many estimators keep one tool for takeoff and add Brody for review and follow-up. Measure in STACK, Togal.AI or Kreo, or take Beam AI's quantities, then give Brody the drawings, your estimate or estimating export and the sub quotes. Brody builds labor from your own rates, levels the bids, reviews the assembled estimate and answers past cost questions from your invoices, commitments and past bids, with each figure linked to its document. After award he hands the PM the scope, exclusions, long leads, quote validity and open RFIs, with budget codes mapped.
How to choose
Bring one recent bid to each demo: the drawings and addenda, your final quantities, your estimate and two or three sub quotes, one of them missing scope. Ask each vendor to take off one floor, show the sheet behind each quantity and say what changed in the last addendum. Then ask what flags the scope carried twice, who finds the gap in the sub quote and who calls the sub.
Common questions
What is the best AI construction estimating software?
It depends on the step. Togal.AI, STACK and Kreo focus on AI takeoff, and Beam AI returns QA-checked takeoffs as a service. Procore Estimating keeps estimates in Procore, HCSS HeavyBid serves heavy civil, and Buildxact and Handoff serve residential builders. Buildalytic is AI construction estimating software that measures quantities, builds labor from your own production rates, reviews the estimate for double counting and missed scope, levels sub bids and checks your price against past bids, with Brody calling subs for what is missing.
What is the best AI takeoff software?
For AI takeoff, contractors look at Togal.AI, STACK, Kreo and Beam AI, and teams already on Procore, Autodesk Forma, On-Screen Takeoff or PlanSwift can use the AI takeoff inside them. Pick by trade and plan type, and test on a recent bid where you already know the quantities. Brody adds estimate review, leveling and sub follow-up on top of whichever takeoff you trust.
Can ChatGPT do construction estimates?
A general chatbot does not know your unit costs, production rates or current drawings unless you give them, so treat its numbers as a draft. STACK IQ connects ChatGPT, Claude or Copilot to STACK, and JobTread connects ChatGPT or Claude through its MCP server. Brody works from your own invoices, commitments, past bids and daily reports and shows the source for each number.
Is there free construction takeoff software?
STACK offers a free version of Takeoff & Estimate. Kreo and Handoff offer 7-day free trials. Most AI takeoff tools are paid, from $175 per user a month for Kreo Pro and $299 for STACK and Togal.AI, according to their own websites on November 28, 2026.
How much does AI estimating software cost?
Togal.AI's Growth plan is $299 per user a month billed yearly. STACK's Takeoff & Estimate starts at $299 per user a month. Kreo Pro is $175 per user a month billed annually. Beam AI starts at $8K a year per trade self-service and $25K a year done for you. Buildalytic's estimating runs on the Brody platform, from an Operator seat with Brody at $69 a month ($59 billed annually), with bid leveling on Brody Pro at $599 a month ($499 billed annually). Procore, Autodesk, HCSS, Buildxact and Handoff did not show a price on the pages we read on November 28, 2026.
Will AI replace our estimator?
Your estimator stays in charge. Brody does the measuring, tracing, leveling and asking. Your estimator checks the quantities, makes the productivity judgment, sets every unit rate and the final number, and your executives decide what to bid.
Sources and editorial notes
- STACK: construction takeoff and estimating software (checked November 28, 2026)
- STACK: STACK IQ (checked November 28, 2026)
- STACK: pricing (checked November 28, 2026)
- Togal.AI: AI takeoff software (checked November 28, 2026)
- Togal.AI: takeoff software for general contractors, including Togal.CHAT (checked November 28, 2026)
- Togal.AI: pricing (checked November 28, 2026)
- Beam AI: AI takeoffs and estimates (checked November 28, 2026)
- Beam AI: pricing (checked November 28, 2026)
- Kreo: AI takeoff software and plans (checked November 28, 2026)
- Kreo: pricing (checked November 28, 2026)
- Autodesk Forma: AI in construction, including Autodesk Takeoff (checked November 28, 2026)
- ConstructConnect: On-Screen Takeoff and Takeoff BOOST (checked November 28, 2026)
- Procore: estimating (checked November 28, 2026)
- Procore: AI agents (checked November 28, 2026)
- HCSS: fall 2026 product release (checked November 28, 2026)
- Buildxact help center: what is Blu? (checked November 28, 2026)
- Handoff: AI estimating for residential construction (checked November 28, 2026)
- JobTread: AI tools (checked November 28, 2026)
- Buildalytic: AI construction estimating software
- Buildalytic: preconstruction software
- Buildalytic: bid leveling software for general contractors
- Buildalytic: pricing and usage (checked November 28, 2026)
Prepared with AI assistance. Reference date: 2026-11-28. Worked scenarios use typical figures and are not customer results. Product details can change; confirm the current scope and terms before rollout.




