Skip to content
Buildalytic

Field notesBuying guides

Best construction safety software (2026), including AI monitoring

Construction safety software compared: HammerTech, Procore, HeavyJob Safety, Mitti, SiteDocs, Safesite, Contractor Foreman, Intenseye, viAct and Buildalytic. AI monitoring and prices.

By Buildalytic editorial team12 min read

A safety coordinator and foreman review a plain checklist in a quiet site office.
On this page12 sections

The short answer

The best construction safety software depends on where safety work stalls: in the records, on the cameras or with the people who owe the next step. Buildalytic is construction safety software that works by text and phone call: Brody sends toolbox talks in each crew's language with sign-off by reply, takes incident and near-miss reports by call or text, and follows up on corrective actions until each one is closed with evidence. HammerTech, Procore Quality & Safety, HeavyJob Safety, Mitti (by SafetyCulture), SiteDocs, Safesite and Contractor Foreman run safety programs in their own apps, and Intenseye and viAct watch site cameras with computer vision.

What to take away

  • Decide what you need first: a safety program, camera monitoring or follow-up with crews. Many contractors pair two.
  • A corrective action is closed only when someone proves the fix. Ask who chases it, and how.
  • Crew adoption decides most rollouts. Check what a worker without the app has to do.
  • Mitti, Safesite, Contractor Foreman and Buildalytic publish prices. HammerTech, Procore, HCSS, SiteDocs, Intenseye and viAct did not on the pages we read.

Three kinds of construction safety software

Safety platforms hold the program: orientations, toolbox talks, inspections, observations, incidents, permits and corrective actions. HammerTech, Procore Quality & Safety, HeavyJob Safety, Mitti (by SafetyCulture), SiteDocs, Safesite and Contractor Foreman sit here. Raken and SALUS add safety to daily reports and crew apps.

AI monitoring tools watch the site. Intenseye and viAct run computer vision on cameras a site already has and send alerts on hazards such as missing PPE or a person in a danger zone. Several platforms now add AI of their own, such as Procore's Site Safety Agent and HammerTech Intelligence.

The follow-up layer reaches the people who owe the next step. This is where Buildalytic fits: Brody sends toolbox talks by text, takes incident and near-miss reports by call or text, and follows up on corrective actions with the person assigned until each one is closed with evidence.

Facts and prices below were copied from each vendor's own website, help center or announcement on November 28, 2026. The order groups tools by kind and is not a ranking. Buildalytic makes one of the options.

What to compare

Most safety software records a form well. Safety work stalls when a crew never signs, a near miss is never reported or a fix is assigned and never proven. Compare tools on the points below.

  • Program coverage: orientations, toolbox talks, JHAs, inspections, observations, incidents, permits and safety data sheets.
  • Crew access: an app and a login, a shared foreman device, on-site check-in, or a text on any phone?
  • Language: are talks and forms available in the languages your crews speak?
  • Corrective actions: who follows up, on what schedule, and what proof closes the item?
  • OSHA records: does an incident flow to the OSHA 300 log, and who decides recordability?
  • AI: hazards found in photos or video, forms read by AI, or follow-up by text and call?
  • Pricing: per seat, per site, by construction volume, per camera or free for subs?

Ten options at a glance

“Not stated” means the vendor's pages we read don't say; ask them.

Ten options at a glance
SoftwareKindSafety recordsAIHow crews take partPublished price
HammerTechConstruction safety platformOrientations, safety meetings, observations, incidents and injuries, inspections, permits, SDS and subcontractor managementHammerTech Intelligence turns pre-task plans into structured data, recognizes observation photos and autofills SDS by reading labelsTouchless, time-stamped attendance on site and one-click acknowledgments; free for subcontractorsNot published; based on annual construction volume and active job sites, with no per-user pricing
Procore Quality & SafetySafety inside ProcoreIncidents including near misses and illnesses, inspection checklists and observations; Safety Hub, in open beta since spring 2026, brings them into one spaceSite Safety Agent identifies hazards from site photos, videos and drawings; included in the Pro and Enterprise AI plansProcore on any smart device; no charge for adding usersNot published; an annual fee based on annual construction volume
HeavyJob Safety (HCSS)Safety for heavy civil, formerly HCSS SafetyToolbox talks from over 1,000 templates, JHAs, inspections, near misses and observations; skills verified before crew members are assignedHCSS lists a Field Agent that fills in the safety meeting for the entire crewSignatures and crew photos on the foreman's device; observations from anyone on any device; works offlineNot published; licensed separately from HeavyJob
Mitti (by SafetyCulture)Inspection and operations platform, formerly SafetyCultureInspections, training, incident reporting and asset managementAI Issue Capture turns photos or voice notes into issuesThe Mitti appFree for small teams of up to 10; Premium $24 per seat a month billed annually ($29 month to month); location-based pricing available
SiteDocsSafety forms and complianceForms and toolbox talks scheduled to repeat; worker certifications and trainingNot stated on the pages readWorks offline and uploads when back onlineNot published; annual subscription based on company size
SafesiteSafety management appInspections, hazards, safety meetings and toolbox talks, and incidents added to the OSHA logNot stated on the pages readUnlimited members on the free planFree plan with reporting limited to the last 30 days; Premium $16 per member a month, 20% off billed annually
Contractor ForemanAll-in-one project software with safetySafety meetings from 800+ topics in English and Spanish; incidents entered to the OSHA 300 logNot stated on the pages readNot stated on the pages readFrom $49 a month for 1 user to $332 for unlimited users, billed annually; 30-day free trial on annual plans
IntenseyeAI camera monitoringAlerts on 50+ types of high-risk hazards, such as no hard hat, a worker beneath a lifted load or a person at an open edgeComputer vision on the cameras you already have; anonymized, with no facial recognitionWorks with about 90% of IP cameras across 200+ brandsNot published; one subscription per camera
viActAI camera monitoring for constructionPPE and danger zone monitoring on existing CCTV, with real-time alertsComputer vision; viAct reports PPE non-compliances fell 41.7% and danger zone violations 46.3% at one Alliad construction siteUses existing camera infrastructureNot stated on the pages read
BuildalyticSafety follow-up by text and callToolbox talks by text with sign-off by reply, incident and near-miss reports by call or text, JHA and SWPPP corrective actions followed to closure, SDS by text and certification recallsBrody routes each report to your safety lead and follows up with the person assigned until the fix is closed with evidenceAny phone, by call or text, in each person's language, with no app and no loginPart of the Brody platform: Operator seat with Brody $69 a month ($59 billed annually) or Brody Starter $239 per company ($199); crews free

Sources: HammerTech: construction safety platform (checked November 28, 2026); HammerTech: safety meetings (checked November 28, 2026); HammerTech: pricing (checked November 28, 2026); HammerTech: HammerTech Intelligence (checked November 28, 2026); Procore: Quality & Safety (checked November 28, 2026); Procore: introducing Safety Hub, now in open beta (May 4, 2026; checked November 28, 2026); Procore: AI agents (checked November 28, 2026); Procore support: which agents are included in my Procore AI plan (checked November 28, 2026); Procore: pricing (checked November 28, 2026); HCSS: HeavyJob Safety, formerly HCSS Safety (checked November 28, 2026); HCSS: safety training and certification tracking (checked November 28, 2026); HCSS: safety toolbox talks (checked November 28, 2026); HCSS: AI (checked November 28, 2026); Mitti (by SafetyCulture) (checked November 28, 2026); Mitti: pricing (checked November 28, 2026); SiteDocs: safety management software (checked November 28, 2026); SiteDocs: pricing (checked November 28, 2026); Safesite: safety management app (checked November 28, 2026); Safesite: pricing (checked November 28, 2026); Contractor Foreman: safety meetings (checked November 28, 2026); Contractor Foreman knowledge base: adding a new incident (checked November 28, 2026); Contractor Foreman: pricing (checked November 28, 2026); Intenseye: safety (checked November 28, 2026); Intenseye: FAQ (checked November 28, 2026); viAct: AI monitoring for construction sites (checked November 28, 2026); viAct: measurable safety gains for Alliad (August 28, 2026; checked November 28, 2026); Buildalytic: construction safety software; Buildalytic: pricing and usage (checked November 28, 2026)

AI safety monitoring, explained

AI shows up in construction safety in three places. Computer vision watches cameras. Intenseye runs on the cameras a site already has and lists 50+ types of high-risk hazards, and viAct combines AI monitoring of site CCTV with real-time alerts for PPE and danger zones. viAct reports that at one Alliad construction site, PPE non-compliances dropped by 41.7% and danger zone violations fell by 46.3%. Those are the vendor's own figures.

AI inside safety platforms reads what crews already capture. Procore's Site Safety Agent identifies hazards from site photos, videos and drawings. HammerTech Intelligence recognizes observation photos and autofills safety data sheets by reading labels. Mitti's AI Issue Capture turns photos or voice notes into issues. Oracle's Advisor for Safety ranks projects by their risk of a safety incident in the coming week.

AI follow-up works with people. Brody sends the talk, takes the report and follows up on the fix by text and call. None of these tools decides whether a hazard is controlled. A competent person does.

Sources: Intenseye: safety (checked November 28, 2026); viAct: AI monitoring for construction sites (checked November 28, 2026); viAct: measurable safety gains for Alliad (August 28, 2026; checked November 28, 2026); Procore: AI agents (checked November 28, 2026); HammerTech: HammerTech Intelligence (checked November 28, 2026); Mitti (by SafetyCulture) (checked November 28, 2026); Oracle: Advisor for Safety risk forecast dashboards (checked November 28, 2026); Buildalytic: construction safety software

When a safety platform is the better choice

If you are a general contractor running orientations, permits and sub safety across many sites, HammerTech is built for it. Subcontractors use it free, and pricing is based on annual construction volume and active job sites rather than users. If your projects already run in Procore, its Quality & Safety tools keep incidents, inspections and observations next to the rest of the job, with no charge for adding users.

Heavy civil contractors on HeavyJob can add HeavyJob Safety, with toolbox talks from over 1,000 templates, JHAs and an offline mode for sites without signal. Mitti suits companies where safety is one part of inspections across many sites. Small contractors can start with Safesite's free plan or Contractor Foreman, which includes 800+ safety meeting topics in English and Spanish. SiteDocs schedules forms and toolbox talks to repeat and tracks worker certifications.

Supers who already file daily reports in Raken get 150+ toolbox talks in English and Spanish with digital signatures. SALUS is built for crews, and its two-way Procore connection creates Procore Tasks for SALUS forms that need review.

Sources: HammerTech: construction safety platform (checked November 28, 2026); HammerTech: pricing (checked November 28, 2026); Procore: Quality & Safety (checked November 28, 2026); Procore: pricing (checked November 28, 2026); HCSS: HeavyJob Safety, formerly HCSS Safety (checked November 28, 2026); Mitti (by SafetyCulture) (checked November 28, 2026); Safesite: pricing (checked November 28, 2026); Contractor Foreman: safety meetings (checked November 28, 2026); SiteDocs: safety management software (checked November 28, 2026); Raken: toolbox talks (checked November 28, 2026); SALUS: SALUS Safety for Procore (checked November 28, 2026)

When AI camera monitoring is the better choice

If you run large sites with fixed camera coverage and repeat hazards such as missing PPE or people under lifted loads, computer vision can watch all day. Intenseye works with about 90% of IP cameras across 200+ brands and prices by camera. viAct runs on existing site CCTV with real-time alerts. Before you buy, run a pilot on one site and agree who answers each alert.

Sources: Intenseye: safety (checked November 28, 2026); Intenseye: FAQ (checked November 28, 2026); viAct: AI monitoring for construction sites (checked November 28, 2026); viAct: measurable safety gains for Alliad (August 28, 2026; checked November 28, 2026)

When the follow-up layer is the right choice

The toolbox talk went out, but two crews never signed. The near miss at the gate was mentioned at lunch and never written down. The laydown fix was assigned on Tuesday, and nobody has sent proof. The program is fine. Nobody is doing the follow-up.

With Buildalytic, Brody sends each toolbox talk by text from your company number, in the language on each person's card, and logs each sign-off by reply. A foreman calls or texts in an incident or near miss, and Brody records the facts, the photos and the corrective owner and routes the report to your safety lead. Sensitive details go only to the people your rule names.

Brody follows up on JHA and SWPPP corrective actions with the person assigned until each one is closed with evidence, such as a photo or a signed record. A worker can text a product name and get the safety data sheet, pointed to the section they asked about. Certifications such as OSHA 10 and OSHA 30 are kept with their real expiry dates, and Brody asks for the new card before one lapses.

Your people decide. A competent person decides whether a hazard is controlled and when work can resume, and your safety lead decides recordability and makes any report to OSHA. OSHA says a fatality must be reported within 8 hours, and an in-patient hospitalization, amputation or eye loss within 24 hours. Brody does not replace an emergency response procedure or a competent person's judgment on site safety.

Sources: Buildalytic: construction safety software; OSHA: report a fatality or severe injury (checked November 28, 2026)

How Buildalytic works beside the others

A team can keep its safety platform and add Brody for the follow-up. The platform keeps the forms and the dashboards. Brody reaches crews by text and call, collects the sign-offs, the reports and the proof, and sends anything still open to the reviewer your rule names. The daily report call also covers safety and toolbox talks in your template's order, and the notes go to the daily log.

Sources: Buildalytic: construction safety software; Buildalytic: daily reports by phone

How to choose

Bring one real week to each demo: a toolbox talk with missing sign-offs, a near miss and a corrective action with no proof. Ask each vendor what a worker without the app has to do, in which languages, who follows up the fix and what closes it. Ask camera vendors who answers an alert at 6 AM.

Common questions

What is the best construction safety software?

It depends on where the work stalls. HammerTech, Procore Quality & Safety, HeavyJob Safety and Mitti (by SafetyCulture) run inspections, incidents and observations in their own apps, and SiteDocs, Safesite and Contractor Foreman suit smaller teams. Buildalytic adds the follow-up by text and call: toolbox talks in each crew's language with sign-off by reply, incident reports by phone and corrective actions followed up to closure.

What is the best AI construction safety software?

It depends on the problem. Intenseye and viAct watch site cameras with computer vision. Procore's Site Safety Agent finds hazards in photos, videos and drawings, and HammerTech Intelligence reads pre-task plans, observation photos and SDS labels. Brody is an AI agent for the follow-up by text and call: toolbox talks, incident reports and corrective actions.

Can AI replace a safety manager or competent person?

No. AI can spot a missing hard hat, read a form or chase a fix. A competent person still decides whether a hazard is controlled and when work can resume, and your safety lead decides recordability. Brody does not replace an emergency response procedure or a competent person's judgment on site safety.

Is there a free construction safety app?

Safesite has a free plan with unlimited members, with reporting limited to the last 30 days. Mitti is free for small teams of up to 10. HammerTech is free for subcontractors. With Buildalytic, crews take part by text or call at no cost.

Do workers need an app for toolbox talks?

It depends on the tool. HeavyJob Safety captures signatures on the foreman's device, HammerTech tracks time-stamped attendance on site and Raken collects digital signatures. With Brody, the talk goes out by text in each worker's language and they acknowledge by reply on any phone, with no app and no login.

When must a serious injury be reported to OSHA?

OSHA says a fatality must be reported within 8 hours, and an in-patient hospitalization, amputation or eye loss within 24 hours. Your safety lead decides recordability and makes any report. Brody makes sure they have the facts and photos quickly.

How much does construction safety software cost?

Mitti lists Premium at $24 per seat a month billed annually, Safesite lists Premium at $16 per member a month, and Contractor Foreman lists plans from $49 a month billed annually. HammerTech and Procore price by annual construction volume, Intenseye per camera and SiteDocs by company size, without published figures. Buildalytic's safety follow-up is part of the Brody platform, from an Operator seat with Brody at $69 a month ($59 billed annually).

Sources and editorial notes

  1. HammerTech: construction safety platform (checked November 28, 2026)
  2. HammerTech: safety meetings (checked November 28, 2026)
  3. HammerTech: pricing (checked November 28, 2026)
  4. HammerTech: HammerTech Intelligence (checked November 28, 2026)
  5. Procore: Quality & Safety (checked November 28, 2026)
  6. Procore: introducing Safety Hub, now in open beta (May 4, 2026; checked November 28, 2026)
  7. Procore: AI agents (checked November 28, 2026)
  8. Procore support: which agents are included in my Procore AI plan (checked November 28, 2026)
  9. Procore: pricing (checked November 28, 2026)
  10. HCSS: HeavyJob Safety, formerly HCSS Safety (checked November 28, 2026)
  11. HCSS: safety training and certification tracking (checked November 28, 2026)
  12. HCSS: safety toolbox talks (checked November 28, 2026)
  13. HCSS: AI (checked November 28, 2026)
  14. Mitti (by SafetyCulture) (checked November 28, 2026)
  15. Mitti: pricing (checked November 28, 2026)
  16. SiteDocs: safety management software (checked November 28, 2026)
  17. SiteDocs: pricing (checked November 28, 2026)
  18. Safesite: safety management app (checked November 28, 2026)
  19. Safesite: pricing (checked November 28, 2026)
  20. Contractor Foreman: safety meetings (checked November 28, 2026)
  21. Contractor Foreman knowledge base: adding a new incident (checked November 28, 2026)
  22. Contractor Foreman: pricing (checked November 28, 2026)
  23. Raken: toolbox talks (checked November 28, 2026)
  24. SALUS: SALUS Safety for Procore (checked November 28, 2026)
  25. Intenseye: safety (checked November 28, 2026)
  26. Intenseye: FAQ (checked November 28, 2026)
  27. viAct: AI monitoring for construction sites (checked November 28, 2026)
  28. viAct: measurable safety gains for Alliad (August 28, 2026; checked November 28, 2026)
  29. Oracle: Advisor for Safety risk forecast dashboards (checked November 28, 2026)
  30. OSHA: report a fatality or severe injury (checked November 28, 2026)
  31. Buildalytic: construction safety software
  32. Buildalytic: daily reports by phone
  33. Buildalytic: pricing and usage (checked November 28, 2026)

Prepared with AI assistance. Reference date: 2026-11-28. Worked scenarios use typical figures and are not customer results. Product details can change; confirm the current scope and terms before rollout.

Bring one workflow to a demo.

Start with a demo on your own work, then go live on one real project.