Every inspection ready. Every deficiency fixed.
Buildalytic is construction inspection software for general contractors and trades. It keeps the QA/QC checklists and the inspection and test plan for each job, collects pre-cover photos by text and gets each inspection booked and confirmed. Brody, its AI agent, follows up every deficiency with its trade until the fix comes back with photo proof, and writes results to Procore or Autodesk Forma (formerly Autodesk Construction Cloud).
Hold points by trade
Harbor Medical Office · Level 3 · 18 hold points · Example
| Trade | Pre-cover photos | Readiness | Inspection | Corrections |
|---|---|---|---|---|
| Plumbing | Accepted | Accepted | Accepted | In review |
| Electrical | Accepted | Accepted | In review | Owed |
| Framing | Accepted | Accepted | Owed | Not required |
| Fire protection | In review | Owed | Owed | Not required |
| Mechanical | Owed | Owed | Owed | Not required |
| Firestopping | Accepted | Accepted | Accepted | Not required |
Brody · confirmed the city framing inspection for Thursday, 9 to 11 AM
Construction inspection software. With someone doing the follow-up.
Inspection software holds the checklist and the result. Buildalytic keeps those for every job, and Brody gets the photos, the bookings and the fixes in from the people who owe them.
- Keeps
- QA/QC checklists and the inspection and test plan for each job, with hold points, required evidence and the responsible trade
- Collects
- Pre-cover photos and readiness confirmations by text, each filed to its location and hold point
- Confirms
- Third-party and city inspections by call, with the window, the site contact and any open prerequisite
- Closes out
- Each deficiency with its trade, followed up until the fix comes back with a photo for your reviewer
This week’s inspections. Each with its next step.
An example week. Each row has its trade, the inspection source, the window and Brody’s next step.
How inspection confirmation calls workInspections · This week
Harbor Medical Office · 9 scheduled · 2 corrections open · Example
- Level 3 framingCity building inspector · Hold point F-3Status: On track: Booked and confirmed, contact LuisWhen: Thu 9 to 11 AMOpen: 0
Brody · confirmed the window with the city and texted Luis
- In-wall plumbing, units 301 to 306Plumbing · Pre-cover · Third-party inspectorStatus: Needs action: Two units missing pre-cover photosWhen: Wed 10 AMOpen: 2
Brody · texted the plumbing foreman for photos of units 304 and 305
- Sprinkler hydrostatic testFire protection · Witness point · Fire marshalStatus: Waiting: Requested, awaiting confirmationWhen: Fri 1 PMOpen: 1
Brody · called the fire marshal’s office to confirm the booking
- Electrical rough-in, level 3Electrical · City inspectionStatus: Waiting: Two corrections with the electricianWhen: Reinspect ThuOpen: 2
Brody · sent each correction to the electrician with the photo and location
- Roof deck fasteningRoofing · Special inspectorStatus: On track: Passed by the inspector, record filedWhen: Passed Tue
Brody · wrote the result and photos to Procore
One hold point. From photos to a closed wall.
In-wall plumbing in unit 305, from the foreman’s first photos to the wall released for drywall.
- Mon 2:10 PM
Foreman texts pre-cover photos
Units 301 to 306, with the test gauge in frame. Two units are missing.
- 2:11 PM
Photos filed to the hold point
Brody files each photo to its unit and asks the foreman for units 304 and 305.
- Tue 7:30 AM
Booking confirmed by call
Wednesday, 10 AM to noon. Site contact Luis. No open prerequisite.
- Wed 11:20 AM
The inspector records one correction
Unit 305 needs a strap at the stack. The inspector passes the other five units.
- 11:30 AM
The correction goes to the plumber
With the inspector’s note, the photo and the location. Brody asks for a date.
- Thu 9:15 AM
Fix comes back with a photo
Brody files the after photo and gets the reinspection booked.
- Thu 2:40 PM
Inspector passes it. Wall released.
Your super releases the wall for drywall. Brody writes the result and photos to Procore.
Hold point P-305 · In-wall plumbing
Harbor Medical Office · Unit 305 · Example
- Trade
- Plumbing, Bayline Mechanical
- Evidence
- Pre-cover photos with the test gauge
- Inspection
- Third-party, Wednesday 10 AM to noon
- Correction
- Strap at the stack, fixed Thursday with a photo
- Decided by
- The inspector. Your super released the wall
- Record to
- The Buildalytic plan and Procore
Brody · filed every photo and wrote the result to Procore
Every inspection. With an owner and a date.
Checklists, plans, photos, bookings, readiness and corrections, on the same company number and job record.
QA/QC checklists
Checklists by scope and location, from your own templates. Each item has its evidence, its trade and the person who signs it off.
Inspection and test plans
Hold and witness points by activity, with the inspection source, the evidence each one needs and the person who decides.
Pre-cover photos by text
Crews text photos before work is covered. Brody files each one to its location and hold point and asks for what is still missing.
Booking and confirmation calls
Brody watches for inspections the schedule needs but nobody booked, then calls or texts to get each one booked and confirmed.
Commissioning readiness
Startup records and readiness confirmations collected from each trade, asset by asset, before the test window.
Deficiencies to the trade
Each failed item goes to the trade that owns it, with the note, the photo and the location, until the fix comes back with a photo.
Written to Procore and Forma
Inspection changes, notes and photos written to Procore or Forma, and deficiencies written as punch items with photos.
Every reply on the record
Each request, photo, booking and result stays on the hold point, ready for turnover and the closeout package.
Booked means confirmed. With the window and the contact.
A requested slot, a confirmed booking and a finished inspection are three different events. Brody keeps them apart.
Proactive alertsInspection booking · Level 3 framing
Harbor Medical Office · City building inspector · Example
- Requested
- Monday, through the city portal by your super
- Confirmed
- Tuesday by call, with the booking reference
- Window
- Thursday, 9 to 11 AM
- Site contact
- Luis Ortega, superintendent
- Open prerequisite
- None. Fire blocking photos filed Tuesday
Brody · confirmed the window and texted Luis the details
Requested, booked and done. Kept apart.
Brody records each step with its source. A booking stays unconfirmed until the inspection office or the third party confirms it. If the window moves, the old window, the new one and who changed it stay on the record.
- The project, the inspection and the location on every booking
- The window, the site contact and any open prerequisite
- Moved bookings kept with the old and new window
- No answer means the booking stays unconfirmed
Photos before cover. Then the inspector decides.
Follow-up by text and call, from your company number, until each photo and each fix comes back.
Text thread · Plumbing foreman
Harbor Medical Office · from your company number
Thanks Dave, this is Brody, the AI assistant for Harbor Builders. Photos for units 301, 302, 303 and 306 are filed. Can you send 304 and 305 with the gauge in frame?
Here you go. Both at 100 psi.
Got them, all six units are filed. The inspection is Wednesday, 10 AM to noon. Luis is your site contact.
The inspector asked for a strap at the stack in unit 305. Photo and note attached. When can your crew fix it?
First thing tomorrow.
Photo proof on every step
Photos support the record. They sit with the hold point, the inspection and the correction they belong to. Your inspector, the authority having jurisdiction or your competent person decides pass or fail, and your super decides when work is covered.
- One location, one hold point and one photo set at a time
- Each trade asked in its own language
- Corrections sent with the inspector’s note and photo
- Every reply kept on the hold point
Four steps. From the plan to a closed item.
Brody collects, confirms and follows up. Your people decide.
Set the plan
QA/QC checklists and the inspection and test plan for the job, with the evidence and the decider for each hold point.
Collect the evidence
Pre-cover photos and readiness confirmations by text, filed to each location and hold point.
Book and confirm
Each inspection booked and confirmed by call, with the window, the site contact and any open prerequisite.
Close each correction
Deficiencies followed up with the trade until the fix comes back with a photo, then accepted by your reviewer.
Your people decide. Brody does the follow-up.
Brody gets the evidence, the bookings and the fixes to the right person. The decisions stay with your team and the inspectors.
Pass or fail
Your inspector, the authority having jurisdiction, the special inspector or your competent person decides pass or fail, and your super decides when work can be covered.
Acceptance
Your superintendent, QA/QC manager or the architect accepts each correction or sends it back with a comment.
Commissioning
Your commissioning authority and the qualified project team decide readiness and run the tests. Brody collects what each trade owes before the window.
Construction inspection software. Compared fairly.
What each tool is known for, when it is the better fit, and how Brody works with it. Inspection apps hold the checklists. Brody adds the texts and calls that get photos, bookings and fixes back.
| Tool | Known for | The better fit when | How Brody works with it |
|---|---|---|---|
| Buildalytic | Keeps QA/QC checklists and the inspection and test plan for each job. Pre-cover photos by text, inspections booked and confirmed by call, and deficiencies followed up with each trade until the fix comes back with a photo. | Inspections wait on trades, photos and bookings, and your super is the one making the calls. | Brody is part of Buildalytic. He keeps the plan current and writes results, photos and deficiencies to Procore or Forma when your team works there. |
| Fieldwire by Hilti | Custom inspection checklists, with pre-loaded building inspection checklists and templates shared across projects. Issues are tagged on the sheet with a location and trade, and PDF reports are generated automatically. Custom forms come on Business and Business Plus. | Your supers want inspections, plans and tasks on every phone, on a free or per-user plan. | Keep the checklists in Fieldwire. Brody reads tasks and punch lists, follows up with the trades and writes updates and photos back. |
| Mitti (by SafetyCulture) | Digital checklists and templates on mobile or web. An action is raised when an item fails and tracked until someone closes it. Free for teams of up to 10, and Premium is $24 per seat a month billed annually. | Inspections run across many sites and teams, beyond construction QA/QC. | Brody follows up by text and call on the actions that stay open and confirms the inspection bookings. |
| Procore Inspections | Inspection checklists from templates on any smart device. Failed items can create observations for follow-up, and inspections can be scheduled to recur from a project template. | Your projects already run in Procore and your field team works in its app. | Keep inspections in Procore. Brody reads the schedule to confirm inspections ahead of time and writes inspection changes, notes and photos back. |
| Forma Build | Digital quality inspection checklists with notes, photos and signatures from any device. Issues are created for non-conforming items and tracked in one list. | Your drawings, models and issues already live in Autodesk Forma. | Keep inspections and issues in Forma. Brody follows up with each assigned company and writes notes, photos and status back. |
| GoAudits | Customizable inspection checklists that work offline, with photos and annotations. Reports go out by email automatically, and follow-up tasks are tracked on a dashboard. Starter is $10 per user a month billed annually. | You want simple audits and fast PDF reports at a low price per user. | Brody follows up with the trades on each open task by text and call and keeps each answer on the job. |
| PlanRadar | Custom checklists, forms and reports, with tickets attached to areas on plans and BIM models for real-time defect tracking. Subcontractors are added free. | You want defects pinned to plans or models, with subs working in the same app. | Brody calls and texts the subs who have not acted on a ticket and keeps each answer on the Buildalytic record. |
| FTQ360 | Project-specific QA/QC plans, checklist inspections against the specs, deficiency and punch reports, and engineering tests that carry into startup, commissioning and turnover. | You run a formal, company-wide QA/QC program. | Brody collects the photos, confirmations and fixes each trade owes, by text and call. |
| Visibuild | Inspection and test plans mapped to hold and witness points, signed off by consultants inside the live plan, on or offline. Non-conformances are captured with photos and a closeout workflow. | You need formal ITPs with consultant sign-off at every hold point. | Brody follows up with the trades and consultants who owe a sign-off, a photo or a fix. |
Vendor details from each vendor’s own website, help center or pricing page, checked November 28, 2026. Products change, so confirm with the vendor.
Related workflows. Works with the rest of Brody.
Common questions. Answered plainly.
Something else? Ask the team
What is construction inspection software?
Construction inspection software records what has to be checked on a job, when, by whom and with what evidence, then tracks each failed item until it is corrected and accepted. Buildalytic keeps the QA/QC checklists and the inspection and test plan for each job. Crews send pre-cover photos by text, Brody gets third-party and city inspections booked and confirmed by call, and each deficiency goes to its trade until the fix comes back with photo proof. Your inspector, the authority having jurisdiction or your competent person decides pass or fail.
What is the best construction inspection app?
It depends on what holds up your inspections. Mitti (by SafetyCulture), Fieldwire, Procore and GoAudits run checklists and inspections in their own apps. PlanRadar and Forma Build tie defects to plans and models, and FTQ360 and Visibuild serve formal QA/QC programs. Buildalytic is construction inspection software that adds the follow-up: pre-cover photos by text, inspections booked and confirmed by call, and deficiencies followed up with each trade until the fix comes back with photo proof.
What is QA/QC software for construction?
QA/QC software holds the quality plan for a job: the checklists, the inspection and test plan with its hold and witness points, the evidence each check needs and the deficiencies found. Buildalytic keeps these for each job, and Brody collects the evidence and follows up each correction by text and call. Your QA/QC manager sets the plan and decides what is accepted.
Can Brody book and confirm third-party and city inspections?
Yes. Brody watches every job for inspections the schedule needs but nobody booked. He calls, texts or emails the right person to get each one booked, then confirms the project, the inspection, the window, the site contact and any open prerequisite. A requested slot stays unconfirmed until the inspection office or the third party confirms it. If a booking moves, Brody records the old window and the new one and tells your super.
How do pre-cover photos work?
Crews text photos to your company number before work is covered. Brody files each one to its location and hold point, asks for any photo or readiness confirmation still missing and tells your super when the set is complete. Photos support the record. The required inspection and the decision to cover the work stay with your inspector and your super.
What happens when an item fails inspection?
The correction goes to the trade that owns it, with the inspector’s note, the photo and the location. Brody texts first, then calls, until the fix is reported with an after photo, and gets the reinspection booked where one is needed. Your inspector or reviewer decides whether it passes.
We already run inspections in Procore, Forma or Fieldwire. Does that change?
Keep the checklists and inspections where they are. Brody reads the Procore schedule to confirm inspections ahead of time, follows up on the open items and writes inspection changes, notes and photos back to Procore or Forma. With Fieldwire, he reads tasks and punch lists and writes updates and photos back.
Does it cover commissioning readiness?
Yes. Buildalytic keeps a readiness register by asset or system. Brody collects the startup records and readiness confirmations each trade owes before the test window, and follows up by call, text and email until each one is in. Your commissioning authority and the qualified project team decide readiness and run the tests.
Will trades and inspectors know they are dealing with an AI?
Yes. Brody says he is an AI assistant for your company on every call and text and never pretends to be a person. Anyone can ask for someone on your team. Trades reply by text or call with photos, with no app to install. Free participants for crews, subs and clients. Their calls, messages and AI work use the company pool. Your photos and records are never sold and never used to train models for other companies.
How is it priced?
Inspection follow-up is part of the Brody platform. An Operator seat with Brody is $59 a month billed annually ($69 month to month), or Brody Starter is $199 per company a month billed annually, beside the phones you already have. Trades answer by text or call with no seat. See pricing for plans.
Bring one open hold point.
Share one floor of inspections, with a missing photo set and an open correction. See Brody get the photos, confirm the booking and follow up the fix until it comes back with proof.