Skip to content
Buildalytic

Field notesBuying guides

Best construction inspection apps (2026)

Construction inspection apps compared: Fieldwire, Mitti, Procore, Forma Build, GoAudits, PlanRadar, FTQ360, Visibuild, InspectMind and Buildalytic. Follow-up, prices. November 2026.

By Buildalytic editorial team11 min read

A construction coordinator holding a tablet in a quiet unfinished room with visible framing and daylight.
On this page12 sections

The short answer

The best construction inspection app depends on what holds up your inspections: the checklist, or the people who owe photos, bookings and fixes. Buildalytic is construction inspection software that keeps QA/QC checklists and the inspection and test plan for each job, collects pre-cover photos by text, gets inspections booked and confirmed by call, and has Brody follow up each deficiency with its trade until the fix comes back with photo proof. Mitti (by SafetyCulture) and GoAudits run checklists and audits on any site, Fieldwire, Procore, Forma Build and PlanRadar run inspections inside construction field platforms, FTQ360 and Visibuild serve formal QA/QC programs, and InspectMind turns a spoken site walk into a written report.

What to take away

  • Decide what holds up your inspections: the checklist, the evidence, the booking or the fix.
  • A failed item is closed only when the fix is proven. Ask each vendor who chases the trade, and how.
  • Formal QA/QC programs need inspection and test plans with hold points and a named person who signs off.
  • Fieldwire, Mitti, GoAudits, PlanRadar, Novade and Buildalytic publish prices. Procore, Autodesk, FTQ360 and Visibuild did not on the pages we read.

Four kinds of construction inspection apps

Buyers split this category four ways. Checklist and audit apps run inspections on any kind of site. Mitti (by SafetyCulture) and GoAudits sit here, and InspectMind turns a spoken walk into a finished report.

Construction field platforms put inspections next to plans, tasks and punch lists. Fieldwire, Procore, Forma Build and PlanRadar sit here.

Formal QA/QC tools hold the quality plan for a job: inspection and test plans, hold and witness points, sign-offs and non-conformances. FTQ360 and Visibuild sit here, and Novade covers quality controls, test plans and handover.

The follow-up layer gets the evidence, the bookings and the fixes in from the people who owe them. This is where Buildalytic fits: crews text pre-cover photos, Brody gets inspections booked and confirmed by call, and each deficiency goes to its trade until the fix comes back with a photo.

Facts and prices below were copied from each vendor's own website, help center or announcement on November 28, 2026. The order groups tools by kind and is not a ranking. Buildalytic makes one of the options.

What to compare

Most inspection apps record a result well. Inspections stall before the inspector arrives and after an item fails. Compare tools on the points below.

  • Checklists: your own templates, a template library, or forms built from a PDF or a description?
  • Evidence: required photos, signatures and notes on each item, filed to the location and the hold point.
  • Inspection and test plans: hold and witness points, with the person who signs off each one.
  • Failed items: does a failure raise an action, an observation or an issue, and who follows it up?
  • Bookings: who books the city or third-party inspection and confirms the window and the site contact?
  • Field access: an app on every phone, an offline mode, or texts and calls with no app?
  • Reports: automatic PDF or Word reports, and where the record lives at turnover.
  • Pricing: per user, per seat, by construction volume, or free for trades?

Ten options at a glance

“Not stated” means the vendor's pages we read don't say; ask them.

Ten options at a glance
SoftwareKindChecklists and evidenceWhen an item failsField accessPublished price
Fieldwire by HiltiConstruction field management appCustom inspection checklists; the same pre-loaded checklists and templates across each project; custom forms on Business and Business PlusIssues tagged on the sheet with the right location and trade; PDF reports generated automaticallyMobile app for the field teamFree for up to 5 users and 3 projects; Pro $39, Business $64 and Business Plus $89 per user a month, billed annually
Mitti (by SafetyCulture)Inspection and operations platform, formerly SafetyCultureChecklists turned into mobile-first workflows, built in a drag-and-drop editor“Every response can kick off an action, an approval or an alert”; follow-up tasks assigned right awayMobile app with auto-save and offline syncingFree for small teams of up to 10; Premium $24 per seat a month billed annually ($29 month to month)
Procore InspectionsInspections inside ProcoreInspection checklists from templates on any smart device; recurring inspection schedules from a project templateObservations created when inspection items failProcore on any smart deviceNot published; an annual fee by product and annual construction volume
Forma Build (Autodesk Forma)Quality inspections inside Autodesk FormaDigital quality inspection checklists with notes, signatures and photos from any deviceIssues generated for non-conforming itemsAny deviceNot stated on the page read
GoAuditsInspection and audit appCustomizable checklists with photos, annotations and commentsReports emailed automatically to the right people; resolution tracked on an interactive dashboardWorks offlineStarter $10 per user a month billed annually ($12 month to month)
PlanRadarField and quality platformUpload or describe a checklist and AI builds the form; AI builds report templatesEach quality check pinned to its exact spot on the planSubcontractors brought in at no costBasic $32, Starter $107, Pro $159 per user a month billed annually; 4% innovation fee from the second billing period
FTQ360Construction QA/QC softwareProject-specific QA/QC plans; checklist inspections that completed work meets specificationsDeficiency and work-to-complete punch list reports, with QA/QC carried into startup, commissioning and turnoverNot stated on the page readNot published
VisibuildInspection and test plan softwareITP and ITC templates mapped to hold and witness pointsNon-conformances captured with photo evidence; hold points signed off inside the live ITP by named reviewersAny device, on or offlineNot published
InspectMind AIAI field report app for iPhone and iPadSpoken observations and photos turned into a written report; LiDAR room scans on supported devices; Word or PDF exportNot stated on the page readWorks offline and syncs when back online; web viewerInspection app price not published; drawing review priced separately
BuildalyticInspection software with booking calls and follow-up by text and callQA/QC checklists and the inspection and test plan for each job, with hold points, required evidence and the responsible trade; pre-cover photos by text, filed to each location and hold point; inspections booked and confirmed by callThe correction goes to the trade with the inspector's note, photo and location; Brody texts, then calls, until the fix comes back with an after photo, and gets the reinspection bookedAny phone, by text or call; no app for tradesPart of the Brody platform: Operator seat with Brody $69 a month ($59 billed annually) or Brody Starter $239 per company ($199); trades free

Sources: Fieldwire: construction inspection software (checked November 28, 2026); Fieldwire: pricing (checked November 28, 2026); Mitti: inspections and reports (checked November 28, 2026); Mitti: pricing (checked November 28, 2026); Procore: Quality & Safety (checked November 28, 2026); Procore support: create an inspection schedule (checked November 28, 2026); Procore: pricing (checked November 28, 2026); Autodesk Forma: construction quality management (checked November 28, 2026); GoAudits: construction inspection app (checked November 28, 2026); GoAudits: pricing (checked November 28, 2026); PlanRadar: QA/QC solutions (checked November 28, 2026); PlanRadar: pricing (checked November 28, 2026); FTQ360: construction QA/QC software (checked November 28, 2026); Visibuild (checked November 28, 2026); Visibuild: construction ITP software (checked November 28, 2026); InspectMind AI: inspection app (checked November 28, 2026); InspectMind AI: pricing (checked November 28, 2026); Buildalytic: construction inspection software; Buildalytic: pricing and usage (checked November 28, 2026)

When a checklist or audit app is the better choice

If inspections run across many sites and teams, and not only construction QA/QC, a checklist app is simple to roll out. Mitti, formerly SafetyCulture, turns checklists into mobile-first workflows, and every response can kick off an action, an approval or an alert. It is free for small teams of up to 10, and Premium is $24 per seat a month billed annually. GoAudits works offline, emails reports automatically and tracks follow-up on a dashboard, from $10 per user a month billed annually.

If the slow part is writing the report, InspectMind turns spoken observations and photos into a written report on iPhone or iPad, scans rooms with LiDAR on supported devices and exports Word or PDF. Teams that want to build their own forms can look at Clappia, which has a free plan for up to 100 users.

Sources: Mitti: inspections and reports (checked November 28, 2026); Mitti: pricing (checked November 28, 2026); Mitti: SafetyCulture becomes Mitti (August 11, 2026; checked November 28, 2026); GoAudits: construction inspection app (checked November 28, 2026); GoAudits: pricing (checked November 28, 2026); InspectMind AI: inspection app (checked November 28, 2026); Clappia: pricing (checked November 28, 2026)

When a construction field platform is the better choice

If your supers already work in a field platform, keep inspections there. Fieldwire sets custom inspection checklists, uses the same templates across projects and tags each issue on the sheet with its location and trade. It is free for up to 5 users and 3 projects, and custom forms come on Business and Business Plus. Procore builds inspection checklists from templates on any smart device, creates observations when items fail and can schedule inspections to recur from a project template.

Teams in Autodesk Forma can run digital quality checklists with notes, signatures and photos in Forma Build and generate issues for non-conforming items. PlanRadar pins every quality check to its spot on the plan, builds forms from an uploaded or described checklist and brings subcontractors in at no cost.

Sources: Fieldwire: construction inspection software (checked November 28, 2026); Fieldwire: pricing (checked November 28, 2026); Procore: Quality & Safety (checked November 28, 2026); Procore support: create an inspection schedule (checked November 28, 2026); Autodesk Forma: construction quality management (checked November 28, 2026); PlanRadar: QA/QC solutions (checked November 28, 2026); PlanRadar: pricing (checked November 28, 2026)

When a formal QA/QC tool is the better choice

If you run a company-wide quality program with inspection and test plans, look at FTQ360 and Visibuild. FTQ360 builds project-specific QA/QC plans, runs checklist inspections against the specifications and extends the QA/QC process into startup, commissioning and turnover. Visibuild maps ITP templates to hold and witness points, lets named reviewers sign off hold points inside the live plan and captures non-conformances with photo evidence, on or offline.

Novade digitizes quality controls, test plans, punch lists, rectifications and handover. It has a free plan for up to 5 users and 5 projects, and Standard starts from $39 per user a month.

Sources: FTQ360: construction QA/QC software (checked November 28, 2026); Visibuild (checked November 28, 2026); Visibuild: construction ITP software (checked November 28, 2026); Novade (checked November 28, 2026); Novade: pricing (checked November 28, 2026)

When the follow-up layer is the right choice

The plumbing inspection is Wednesday. Two units are missing pre-cover photos, nobody has confirmed the window with the third-party inspector, and last week's electrical correction is still open. The checklist is fine. Nobody is getting the photos, the booking or the fix back.

With Buildalytic, crews text pre-cover photos to your company number. Brody files each one to its location and hold point, asks for any photo still missing and tells your super when the set is complete. He watches each job for inspections the schedule needs but nobody booked, then calls or texts to get each one booked and confirmed with the window, the site contact and any open prerequisite. A requested slot stays unconfirmed until the inspection office or the third party confirms it.

When an item fails, the correction goes to the trade that owns it with the inspector's note, the photo and the location. Brody texts first, then calls, until the fix is reported with an after photo, and gets the reinspection booked where one is needed. Buildalytic also keeps a commissioning readiness register, and Brody collects the startup records each trade owes before the test window.

Your inspector, the authority having jurisdiction or your competent person decides pass or fail. Your super decides when work is covered, and your superintendent, QA/QC manager or the architect accepts each correction or sends it back.

Sources: Buildalytic: construction inspection software; Buildalytic: job photos by text

How Buildalytic works beside the others

Teams that run inspections in Procore, Forma or Fieldwire keep the checklists where they are. Brody reads the Procore schedule to confirm inspections ahead of time, follows up on the open items and writes inspection changes, notes and photos back to Procore or Forma. With Fieldwire, he reads tasks and punch lists and writes updates and photos back.

Teams with no inspection tool keep the QA/QC checklists and the inspection and test plan in Buildalytic. Trades reply by text or call with photos, with no app to install, and every request, photo, booking and result stays on the hold point for turnover.

Sources: Buildalytic: construction inspection software

How to choose

Bring one real hold point to each demo: a pre-cover inspection with a missing photo, a booking nobody has confirmed and one open correction. Ask each vendor to show where the evidence is filed, who books and confirms the inspection, what the trade receives when an item fails and who closes it. Then ask what happens when the trade does not answer.

Common questions

What is the best construction inspection app?

It depends on what holds up your inspections. Mitti (by SafetyCulture) and GoAudits run checklists on any site, Fieldwire, Procore, Forma Build and PlanRadar run inspections inside construction field platforms, and FTQ360 and Visibuild serve formal QA/QC programs. Buildalytic keeps the checklists and the inspection and test plan for each job and adds the follow-up: pre-cover photos by text, inspections booked and confirmed by call, and deficiencies followed up with each trade until the fix comes back with photo proof.

What is the best free construction inspection app?

Fieldwire's Basic plan is free for up to 5 users and 3 projects. Mitti is free for small teams of up to 10. Novade has a free plan for up to 5 users and 5 projects, and Clappia's free plan covers up to 100 users. PlanRadar brings subcontractors in at no cost, and with Buildalytic trades answer by text or call with no seat.

Is SafetyCulture now called Mitti?

Yes. SafetyCulture rebranded as Mitti on August 11, 2026, and its site now calls the product Mitti (by SafetyCulture). The free plan covers small teams of up to 10, and Premium is $24 per seat a month billed annually.

What is an inspection and test plan?

An inspection and test plan lists the checks for each activity, the hold and witness points, the evidence each check needs and who signs it off. Visibuild maps ITP templates to hold and witness points, and FTQ360 builds project-specific QA/QC plans. Buildalytic keeps the inspection and test plan for each job, and Brody collects the photos and confirmations each hold point needs. Your QA/QC manager sets the plan and decides what is accepted.

Can AI help with construction inspections?

Yes, in different places. PlanRadar builds a form from an uploaded or described checklist. InspectMind turns spoken observations and photos into a written report. Brody files pre-cover photos texted from the field, confirms inspection bookings by call and follows up each correction until the fix comes back with a photo. A person still decides pass or fail.

Who decides whether an item passes inspection?

Your inspector, the authority having jurisdiction, the special inspector or your competent person. Software records the evidence and the result. With Buildalytic, your superintendent, QA/QC manager or the architect accepts each correction or sends it back with a comment.

How much do construction inspection apps cost?

GoAudits lists $10 per user a month billed annually. Mitti lists $24 per seat a month billed annually. Fieldwire lists a free plan and paid plans from $39 per user a month billed annually. PlanRadar lists $32 to $159 per user a month. Buildalytic's inspection follow-up is part of the Brody platform, from an Operator seat with Brody at $69 a month ($59 billed annually). Procore, Autodesk, FTQ360 and Visibuild did not show prices on the pages we read on November 28, 2026.

Sources and editorial notes

  1. Fieldwire: construction inspection software (checked November 28, 2026)
  2. Fieldwire: pricing (checked November 28, 2026)
  3. Mitti: inspections and reports (checked November 28, 2026)
  4. Mitti: pricing (checked November 28, 2026)
  5. Mitti: SafetyCulture becomes Mitti (August 11, 2026; checked November 28, 2026)
  6. Procore: Quality & Safety (checked November 28, 2026)
  7. Procore support: create an inspection schedule (checked November 28, 2026)
  8. Procore: pricing (checked November 28, 2026)
  9. Autodesk Forma: construction quality management (checked November 28, 2026)
  10. GoAudits: construction inspection app (checked November 28, 2026)
  11. GoAudits: pricing (checked November 28, 2026)
  12. PlanRadar: QA/QC solutions (checked November 28, 2026)
  13. PlanRadar: pricing (checked November 28, 2026)
  14. FTQ360: construction QA/QC software (checked November 28, 2026)
  15. Visibuild (checked November 28, 2026)
  16. Visibuild: construction ITP software (checked November 28, 2026)
  17. InspectMind AI: inspection app (checked November 28, 2026)
  18. InspectMind AI: pricing (checked November 28, 2026)
  19. Novade (checked November 28, 2026)
  20. Novade: pricing (checked November 28, 2026)
  21. Clappia: pricing (checked November 28, 2026)
  22. Buildalytic: construction inspection software
  23. Buildalytic: job photos by text
  24. Buildalytic: pricing and usage (checked November 28, 2026)

Prepared with AI assistance. Reference date: 2026-11-28. Worked scenarios use typical figures and are not customer results. Product details can change; confirm the current scope and terms before rollout.

Bring one workflow to a demo.

Start with a demo on your own work, then go live on one real project.