Skip to content
Buildalytic

Field notesConstruction finance and procurement

Which states require notarized lien waivers? A state-by-state check (2026)

Which states require notarized lien waivers: Wyoming and Mississippi forms carry a notary block, Texas dropped it in 2022, Georgia uses a witness. Plus how Buildalytic collects waivers.

By Buildalytic editorial team8 min read

Lien waiver paperwork for lower-tier subcontractors on a desk
On this page13 sections

The short answer

Few states require a notarized lien waiver. Of the statutory-form states we checked, Wyoming and Mississippi print a notary block on the waiver itself. Georgia's waivers are signed under seal before a witness, and its affidavit of nonpayment is notarized. Texas removed notarization for original contracts entered into on or after January 1, 2022. Arizona, Nevada, Michigan, Utah, Missouri and Florida forms need only a signature. This is a summary from each statute, not legal advice. Buildalytic is retainage and lien waiver tracking software: Brody collects the right conditional or unconditional waiver from every tier by call and text before a payment goes out.

What to take away

  • Statutory form and notarized are two different rules. Most form states need only a signature.
  • Wyoming and Mississippi print a notary block on the waiver form itself.
  • Texas waivers no longer need a notary for original contracts entered into on or after January 1, 2022.
  • Georgia waivers need a witness, not a notary. Its affidavit of nonpayment needs both.
  • A notary step adds days. Send the form early so the waiver is ready when the money is.

Statutory form and notarized are different rules

A statutory form state tells you what the waiver must say. A notary rule tells you how it must be signed. Contractors often mix them up, and GCs often ask for a notary out of habit. In most form states the statute asks only for the claimant's signature, or its authorized agent's.

Not legal advice. This guide summarizes each state's statute as published on the official state site, checked November 28, 2026. Your contract, your lender or your title company can still ask for a notarized waiver where the statute does not. Confirm the rule for your job with your attorney before you sign or demand a waiver.

Notarized lien waiver requirements by state

"No notary requirement in the statute" means the waiver section and its forms say nothing about a notary. For the full form list, see our guide to statutory lien waiver forms by state.

Notarized lien waiver requirements by state
StateStatutory form required?Notarized?Other signing ruleStatute
WyomingYes, substantially the statutory formYes. The form ends with an acknowledgment before a notarial officerOne progress-style form that reserves retainage and unpaid amountsWyo. Stat. 29-10-101(b)
MississippiYes, substantially the statutory formsYes. Each waiver form has a "sworn to and subscribed before me" notary blockInterim and final waivers; deemed paid after 60 days unless an affidavit of nonpayment is filedMiss. Code 85-7-433
GeorgiaYes, substantially the statutory formsNo notary on the waiver. It is signed under seal with a witness. The affidavit of nonpayment is sworn before a witness and a notaryBinding after 90 days unless an affidavit of nonpayment is filedO.C.G.A. 44-14-366
TexasYes, must substantially complyNot for original contracts entered into on or after January 1, 2022. HB 2237 struck "and notarized" from the statuteSigned by the claimant or its agent; conditional waivers need evidence of paymentProp. Code 53.281 to 53.287
ArizonaYes, must follow substantiallyNo notary requirement in the statuteUnconditional forms carry a notice in large typeA.R.S. 33-1008
NevadaYes, unenforceable unless in the statutory formsNo notary requirement in the statute; signed by the claimant or its agentA waiver for a payment that bounces is voidNRS 108.2457
MichiganYes, substantially the statutory formatNo notary requirement in the statuteWaivers demanded before work starts are invalidMCL 570.1115
UtahNo, safe-harbor formsNo notary requirement; signed by the claimant or its agentEnforceable only once payment is receivedUtah Code 38-1a-802
MissouriResidential onlyNo notary block on the final waiver form. The notice of rights in the same section must be notarizedUnconditional final waiver on residential propertyRSMo 429.016
FloridaNo, optional formsNo notary block on the statutory formsNo one may require a lienor to sign a different formFla. Stat. 713.20
CaliforniaYes, substantially the statutory formsNot verified. The state's statute site blocked our checkFour forms: conditional and unconditional, progress and finalCiv. Code 8132 to 8138

Sources: Wyoming Statutes Title 29, 29-10-101(b), lien waiver form (checked November 28, 2026); Mississippi SB 2622 (2014), Miss. Code 85-7-433 forms (checked November 28, 2026); Georgia SB 315 (2020), O.C.G.A. 44-14-366 forms (checked November 28, 2026); Texas HB 2237 (87th Legislature), enrolled text, amending Property Code 53.282 (checked November 28, 2026); Arizona Revised Statutes 33-1008 (checked November 28, 2026); Nevada Revised Statutes Chapter 108 (108.2457) (checked November 28, 2026); Michigan Compiled Laws 570.1115 (checked November 28, 2026); Utah Code 38-1a-802 (checked November 28, 2026); Missouri Revised Statutes 429.016 (checked November 28, 2026); Florida Statutes 713.20 (checked November 28, 2026)

Wyoming: the waiver form is notarized

Wyoming's waiver must be completed in substantially the statutory form. The form reserves retainage and any amount still unpaid, and it ends with an acknowledgment taken before a notarial officer, with the officer's seal and commission date. Plan for the notary step every time you request one.

Sources: Wyoming Statutes Title 29, 29-10-101(b), lien waiver form (checked November 28, 2026)

Mississippi: notary block on every form

Mississippi's interim and final waiver forms, and its affidavit of nonpayment, each end with "sworn to and subscribed before me" and a line for a notary public. A signed waiver is deemed paid after 60 days unless the claimant files an affidavit of nonpayment, so the notary step matters at both ends.

Sources: Mississippi SB 2622 (2014), Miss. Code 85-7-433 forms (checked November 28, 2026)

Georgia: a witness on the waiver, a notary on the affidavit

Georgia's interim and final waiver forms are given under hand and seal, with a line for a witness and the witness's address. They do not carry a notary block. The affidavit of nonpayment is different: it is sworn and executed in the presence of a witness and a notary public. If you sign a waiver and are not paid, that affidavit must be filed within 90 days.

Sources: Georgia SB 315 (2020), O.C.G.A. 44-14-366 forms (checked November 28, 2026)

Texas: notarization removed in 2022

Texas waivers must substantially comply with one of four statutory forms. HB 2237 struck the words "and notarized" from the signing requirement, so a waiver is effective if it is signed by the claimant or its authorized agent and, for a conditional release, there is evidence of payment. The change applies to original contracts entered into on or after January 1, 2022. Older contracts follow the prior law, so check the contract date before you drop the notary.

Sources: Texas HB 2237 (87th Legislature), enrolled text, amending Property Code 53.282 (checked November 28, 2026)

States where a signature is enough

Arizona, Nevada and Michigan require their statutory forms but say nothing about a notary. Nevada's statute asks for a waiver signed by the lien claimant or its authorized agent in the statutory form. Utah's forms are a safe harbor, enforceable once signed and paid. Missouri's residential final waiver form has no notary block, although the notice of rights in the same section must be notarized. Florida's optional forms end with a date and a signature line.

Sources: Arizona Revised Statutes 33-1008 (checked November 28, 2026); Nevada Revised Statutes Chapter 108 (108.2457) (checked November 28, 2026); Michigan Compiled Laws 570.1115 (checked November 28, 2026); Utah Code 38-1a-802 (checked November 28, 2026); Missouri Revised Statutes 429.016 (checked November 28, 2026); Florida Statutes 713.20 (checked November 28, 2026)

California and states we did not check

California requires its four statutory forms, but the state's statute site blocked our check on November 28, 2026, so we did not confirm its signature block. States without statutory forms leave signing rules to the contract. Read the statute on the official site or ask counsel before you rely on any of them.

Collecting notarized waivers without holding payments

Most held payments come down to one missing waiver from one supplier. A notary step makes that more likely, so start the request the day the pay app goes out.

  • Note on each job which waiver each tier owes and whether the state or the contract needs a notary.
  • Send the form with the amount, the through date and the job filled in, so the signer only has to sign.
  • In notary states, send it early. A sub needs time to get to a notary, and an online notary may be an option where your state allows it.
  • Send conditional waivers with the pay app. Send unconditional waivers only after the payment clears.
  • Check the signature, the seal and the dates when the waiver comes back, before you release the check.

How Buildalytic collects the right waiver from every tier

Buildalytic is retainage and lien waiver tracking software for general contractors and subcontractors. It generates all four waiver types, conditional or unconditional, progress or final, with the right amount, date and format. Brody, its AI assistant, collects lower-tier waivers by call and text, and no check goes out ahead of the waiver it needs.

Subs and suppliers reply by text or email with no account, and they are free on every plan. If you pay through GCPay, Textura, Procore Pay or Trimble Pay, the waiver exchange stays in the portal and Brody follows up with whoever has not signed. Your team decides which form a job needs and when a payment is released.

An Operator seat with Brody is $69 a month ($59 billed annually), and Brody Starter is $239 per company ($199 billed annually). Subs and crews are free.

Sources: Buildalytic: retainage and lien waiver tracking software; Buildalytic: pricing and usage (checked November 28, 2026)

Common questions

Which states require notarized lien waivers?

Of the statutory-form states we checked on November 28, 2026, Wyoming and Mississippi print a notary block on the waiver form. Georgia requires a witness, not a notary, on the waiver, and a notary on the affidavit of nonpayment. Texas removed notarization for original contracts entered into on or after January 1, 2022.

Do Texas lien waivers need to be notarized?

Not for original contracts entered into on or after January 1, 2022. HB 2237 removed the notarization requirement. The waiver must still substantially comply with a statutory form and be signed by the claimant or its authorized agent.

Does a Georgia lien waiver need a notary?

The statutory waiver forms are signed under seal with a witness, not a notary. The affidavit of nonpayment, which you file if you signed a waiver and were not paid, is sworn before a witness and a notary public.

Can a GC require a notarized waiver when the state does not?

A contract can add signing steps in many states, but some statutes limit what a payer may demand. Florida, for example, bars requiring a waiver that differs from its statutory forms. Ask your attorney before you sign or push back.

Is an unnotarized waiver valid in Wyoming or Mississippi?

Both statutes require a waiver in substantially the statutory form, and both forms include a notary block. Whether a waiver without it holds up is a legal question. Use the full form and ask counsel about any exception.

Can Buildalytic collect waivers that need a notary?

Brody requests the waiver each payment needs from every tier by call and text, with the right amount, date and format, and follows up until it arrives. The signer arranges the notary. Your team checks the waiver and releases the payment.

Sources and editorial notes

  1. Wyoming Statutes Title 29, 29-10-101(b), lien waiver form (checked November 28, 2026)
  2. Mississippi SB 2622 (2014), Miss. Code 85-7-433 forms (checked November 28, 2026)
  3. Georgia SB 315 (2020), O.C.G.A. 44-14-366 forms (checked November 28, 2026)
  4. Texas HB 2237 (87th Legislature), enrolled text, amending Property Code 53.282 (checked November 28, 2026)
  5. Arizona Revised Statutes 33-1008 (checked November 28, 2026)
  6. Nevada Revised Statutes Chapter 108 (108.2457) (checked November 28, 2026)
  7. Michigan Compiled Laws 570.1115 (checked November 28, 2026)
  8. Utah Code 38-1a-802 (checked November 28, 2026)
  9. Missouri Revised Statutes 429.016 (checked November 28, 2026)
  10. Florida Statutes 713.20 (checked November 28, 2026)
  11. Buildalytic: retainage and lien waiver tracking software
  12. Buildalytic: pricing and usage (checked November 28, 2026)

Prepared with AI assistance. Reference date: 2026-11-28. Worked scenarios use typical figures and are not customer results. Product details can change; confirm the current scope and terms before rollout.

Bring one workflow to a demo.

Start with a demo on your own work, then go live on one real project.