Buildalytic vs Consight for bid leveling.
Consight writes trade scopes from plans and specs and levels bids against them. Brody levels every quote against your scope sheet and asks each sub for what is missing by call and text.
AI preconstruction software for commercial GCs that writes trade scopes, invites bidders, levels bids and drafts revision emails.
Brody levels each quote against your scope sheet, flags gaps and exclusions with the source line and asks the sub for the missing scope by call, text or email.
Side by side. Scopes from the documents or answers from the subs.
Both level bids and flag gaps. Consight starts from the plans. Brody starts from your scope sheet and makes the calls.
| Question | Brody by Buildalytic | Consight |
|---|---|---|
| What it is | An AI teammate for construction that levels each sub’s quote against your scope sheet, flags what is missing and asks the sub for it by call, text or email. | AI preconstruction software that writes trade scopes from plans and specs, invites bidders, levels bids and drafts subcontracts. |
| Who it is built for | GC estimators and preconstruction teams leveling bids trade by trade. | Commercial general contractors from $50M to $5B+ in volume. |
| Where the scope comes from | Your scope sheet for the trade, or CSI divisions. | Reads plans, specs and addenda, groups the work into trade bid packages and drafts a scope for each one. |
| What it flags | Scope items a bid does not price, shown as not found. Exclusions, qualifications, alternates and allowances with the source line. Missing addendum acknowledgement, bond or unit prices. Changes between revisions. | Missing scope, exclusions, overlaps and pricing discrepancies, each linked to the source proposal. Scope lines checked against the spec book. |
| Getting the missing scope | Brody calls, texts or emails the sub for the missing price, addendum, bond or unit prices and tells the estimator what is still open. | Drafts bid revision emails for missing scope, exclusions and clarifications that you review, send and track. |
| Bid list and exports | Pulls the bid list from BuildingConnected or ConstructConnect, or works from a CSV. Reads quotes as files. Exports the leveled sheet to Excel or CSV. | Lists BuildingConnected, Procore and Excel. Builds a bidder list for each package and scores subs on past work, distance and job size. |
| Who decides | The estimator reviews the leveled sheet and makes the award. | Your team reviews drafted invites and revision emails before they go out. |
| Price | Included on Brody Pro at $599 per company a month ($499 billed annually), and on Brody Business. | Consight Pro is one plan quoted for your whole organization, never per seat, billed as an annual subscription with a monthly AI budget. 14-day free trial. |
Consight details from consight.ai and its pricing page, checked November 28, 2026.
Where each one fits. Said plainly.
Both save estimators from leveling by hand. Who goes back to the sub is different.
How teams use both. Scopes in one, follow-up in the other.
Consight writes the scope. Brody gets every bid complete against it.
Bid leveling softwareConsight writes the scope
Trade packages and scopes drafted from plans, specs and addenda.
Bids come in
Through BuildingConnected, email or your bid tool.
Brody chases the gaps
The missing price, addendum or bond asked for by call, text and email.
The estimator awards
A complete, leveled sheet. The decision stays with your team.
Two days before bid day. Every gap chased.
What Brody handled for one electrical package, and where each bid stands.
Bid solicitation and follow-upElectrical · 3 bids
Scope · 14 items from your scope sheet
- Complete
Ridge Electric
14 of 14 priced · excludes utility company fees
Brody · showed what moved since revision 1: switchgear price and one alternate
- Asked
Coastal Power
13 of 14 priced · fire alarm not found
Brody · texted the estimator at Coastal Power for a fire alarm price
- Waiting
Summit Electric
Lighting controls as an allowance · no unit prices
Brody · called and emailed for the Addendum 2 acknowledgement and unit prices
- Estimator
Award
Leveled sheet exported to Excel
Brody · sent the open items to the estimator, who makes the award
From the scope sheet. To a complete bid.
Where Brody fits for a bid desk that levels every trade.
All integrationsWho Brody is built for. Bid desk and preconstruction.
Teams that need every bid complete before they award.
- Covered: Estimators leveling five bids per trade the night before bid day
- Covered: Preconstruction managers who need every gap closed before award
- Covered: Teams whose bids arrive as PDFs, emails and spreadsheets
- Covered: GCs who already keep a scope sheet for each trade
- Covered: Bid desks that track coverage by trade
- Covered: Teams that run BuildingConnected or ConstructConnect
More comparisons. And next steps.
- Bid leveling softwareEvery quote leveled against your scope
- Best bid leveling softwareSeven options compared
- Bid solicitation and follow-upInvitations, calls and coverage by trade
- Bid leveling templateCompare scope as well as price
- Bids with different exclusionsHow to compare them fairly
- Preconstruction softwareBids, scopes and follow-up
- Vs Trunk ToolsAI for drawings, specs and TrunkText
- All comparisonsBrody against every option
Questions people ask. Answered plainly.
Something else? Ask the team
What is the difference between Brody and Consight?
Consight is AI preconstruction software for commercial general contractors. Its site says it reads plans, specs and addenda, drafts trade scopes, builds bidder lists, levels bids with each line linked to the proposal and drafts revision emails you review and send. Brody by Buildalytic is an AI teammate on your company number. He levels each quote against your scope sheet, flags gaps and exclusions with the source line and asks the sub for what is missing by call, text or email.
What is the best bid leveling software for general contractors?
It depends on where your scope comes from and who goes back to the sub. Consight, Piper and MeltPlan write trade scopes from plans and specs and level bids against them. TrunkBid from Trunk Tools maps each bid line to your scope. BuildingConnected Pro and Procore level bids inside their own platforms. Brody levels each quote against your scope sheet and asks the sub for the missing scope by call, text or email.
How does TrunkBid compare?
TrunkBid from Trunk Tools maps each line item in a sub’s bid to your scope requirements, flags what each bidder excludes, prices as an alternate or leaves unaddressed, suggests follow-up questions for each bidder and exports to Excel. Trunk Tools prices on construction volume and number of projects (checked November 28, 2026). It fits teams that already work with Trunk Tools. Brody asks the sub those follow-up questions himself, by call, text or email.
What does Brody flag in a bid?
Scope items the bid does not price, shown as not found against your scope sheet or CSI divisions. Exclusions, qualifications, alternates and allowances the sub states, each with the source line. A missing addendum acknowledgement, bond or unit prices you asked for. Changes between revisions of the same bid.
Do both work with BuildingConnected?
Yes. Consight lists BuildingConnected, Procore and Excel. Brody pulls the bid list straight from BuildingConnected or ConstructConnect, or works from a CSV, reads quotes as files and exports the leveled sheet to Excel or CSV.
When is Consight the better choice?
When your estimators need trade scopes written from plans, specs and addenda, and want invitations, leveling, subcontracts and prequalification in one preconstruction platform priced for the whole organization. Brody fits better when the scope exists and the hard part is getting every sub to fill the gaps before bid day.
Can we use Consight and Brody together?
Yes. Consight writes the scopes and levels the bids. Brody calls and texts the subs who still owe a price, an addendum acknowledgement, a bond or unit prices, and tells the estimator what is still open before award.
How do the prices compare?
Buildalytic includes bid leveling on Brody Pro at $599 per company a month ($499 billed annually), and on Brody Business. Subs are free. Consight Pro is one plan quoted for your whole organization, never per seat, as an annual subscription billed monthly with a monthly AI budget and a 14-day free trial (checked November 28, 2026).
Is Brody a person?
No. Brody is an AI assistant. On every call he says who he works for and that he is an AI, with a recording notice where the law requires one. Your estimator reviews the leveled sheet and makes every award, and your data is never sold or used to train models for other companies.
Get every bid complete before award.
Share your scope sheet and two or three quotes. See them leveled, with every gap flagged and the questions already on their way to the sub.
