Buildalytic vs PlanRadar for defects and inspections.
PlanRadar sells AI agents and AI-built forms inside its quality app. Brody works by call and text: he chases each sub until the fix comes back with photo proof, and writes the result to Procore and Forma.
A field and quality platform for defects, tasks and inspections on plans and BIM models, with AI agents, an AI assistant and AI-built forms inside the app.
Brody follows up every open defect, punch item and inspection by call and text in each person’s language, and writes the result to Procore and Forma.
Side by side. Agents in the app or on the phone.
Both bring AI to quality and defects. PlanRadar’s agents act on the data in its app. Brody takes each open item to the sub who owes the fix.
| Question | Brody by Buildalytic | PlanRadar |
|---|---|---|
| What it is | An AI teammate for construction that follows up defects, punch items and inspections by call and text, then writes each answer to your systems. | A field and quality platform for defects, tasks, inspections and handover, with each item connected to plans or BIM models. |
| Where the AI works | On your company number. Brody calls and texts the person who owes the answer, in their language, and says he is an AI on every call. | Inside PlanRadar, on your project data. Customers describe their work in their own words to create an AI Agent that watches the project and takes the actions they have allowed. |
| Forms and capture | QA/QC checklists and the inspection and test plan kept for each job. Crews text pre-cover photos and punch items, and each one is filed to its item and room. | AI turns a description or an uploaded document into a ready-to-use form. Voice input turns site observations into structured tickets. |
| Defects and punch | Items logged by photo or text from the walk, assigned by trade and followed up until the fix comes back with photo proof. | Defects captured as text notes, images, videos and audio recordings on plans or BIM models, and shared automatically with the relevant project partners. |
| Subcontractors | Trades and subs get their items by text with the photo and the room, and answer by text or call, free, with no app or login. | Subcontractors and watchers are unlimited and free on every plan, added to your PlanRadar account. |
| Procore and Forma | Punch items, inspection notes and photos written to Procore and Autodesk Forma (formerly Autodesk Construction Cloud). Teams with no punch tool keep the list in Buildalytic. | Open API access and Microsoft 365 document integration on the Pro plan. |
| Price | From $25 per office user a month, billed annually. Crews, trades and subs are free. | Basic is $32 for one user. Starter is $107 and Pro $159 per user a month. Enterprise is quoted. The AI Assistant is an add-on on Pro and Enterprise, and a 4% innovation fee applies from the second billing period. |
PlanRadar details from planradar.com and planradar.ai, its pricing, punch list, QA/QC and AI pages, checked November 28, 2026.
Where each one fits. Said plainly.
Both keep defects moving. Who does the chasing is different.
How teams use both. Defects in PlanRadar, the chase by Brody.
PlanRadar keeps the defects on the plan. Brody gets the late ones fixed and keeps the answers.
Punch list softwareDefects logged in PlanRadar
Your team records items on the plan with photos, video and voice notes.
The late ones go to Brody
The PM hands Brody the items a sub has not acted on.
Brody chases the sub
A text with the photo and the location, then a call, in the sub’s language.
The answer is kept
Each reply and after photo is kept on the Buildalytic list for the PM.
This week’s late defects. Chased and closed.
What Brody did on one job’s late defects in one afternoon, and what came back.
Inspection softwareLate defects · Harbor Clinic
Today · 7 items past due across 3 subs
- Fixed
Sealant gap, curtain wall bay 4
Westline Glazing · 5 days past due
Brody · texted the foreman the photo and plan location and got the after photo
- Booked
Fire caulk, level 2 corridor
Bayline Electric · by call, in Vietnamese
Brody · booked Tuesday’s visit and noted it for the PM in English
- Confirmed
Above-ceiling inspection, level 3
City inspector · Friday 9 AM
Brody · confirmed the booking after the last pre-cover photos came in
- To PM
Ceiling tile damage, lobby
Summit Interiors · no reply after two texts
Brody · called twice and sent the item to the PM for the morning
The fix comes to you. Then Brody keeps going.
Where Brody fits for a construction company.
All integrationsWho Brody is built for. Office and field.
Teams that need every defect closed with proof, without a super chasing it by phone.
- Covered: Quality managers who need every defect closed with proof
- Covered: Supers who would rather not chase subs by phone
- Covered: Subs who will answer a text faster than an app notice
- Covered: PMs who need open items closed before handover
- Covered: General contractors whose lists live in Procore or Forma
- Covered: Foremen who work best in their own language
AI agents, two ways. In the app or on the job.
PlanRadar’s agents watch the project data and act inside PlanRadar. Brody runs one agent for each job and reaches the people the work waits on.
AI agentsMore comparisons. And next steps.
- Punch list softwareEach fix followed up to photo proof
- Inspection softwareQA/QC checklists and bookings by call
- AI agentsOne agent for each job
- Best AI agents comparedAgents in apps and on the phone
- Best punch list softwareField apps and follow-up, with prices
- Best inspection appsChecklists and follow-up compared
- Brody vs FieldwireField Intelligence inside an app
- All comparisonsBrody against every option
Questions people ask. Answered plainly.
Something else? Ask the team
What is the difference between Brody and PlanRadar?
PlanRadar is a field and quality platform where teams record defects, tasks and inspections on plans and BIM models. Its AI Agents and AI assistant work on the project data inside PlanRadar. Brody by Buildalytic is an AI teammate on your company number. He calls and texts the sub who owns each open defect, punch item or inspection deficiency, in their language, until the fix comes back with photo proof, and writes the result to Procore, Autodesk Forma or Buildalytic.
What are PlanRadar AI Agents?
PlanRadar’s AI site says customers describe their work in their own words to create an agent, which watches the project and takes the actions they have allowed. It also lists an AI assistant that takes tasks in natural language on your project data, forms built by AI from a description or an uploaded document, voice input that turns observations into tickets and AI status overviews. The pricing page lists the AI Assistant as an add-on on Pro and Enterprise (checked November 28, 2026).
Can subcontractors use PlanRadar for free?
Yes. PlanRadar’s pricing page says subcontractors can be added to your account free of charge, and subcontractors and watchers are unlimited on every plan. With Brody, subs get their items by text from your company number and answer by text or call, also with no seat.
Can we use PlanRadar and Brody together?
Yes. Defects and quality checks stay in PlanRadar. Brody calls and texts the subs who have not acted on an item, collects the after photo and keeps each answer on the Buildalytic list for the PM.
When is PlanRadar the better choice?
When your team runs quality, defects and handover in one app on plans and BIM models, wants subs in the same app at no cost and wants to describe AI agents that act on that data. Brody fits better when the hold-up is getting subs to act, and when you also want follow-up on daily reports, RFIs, COIs and pay apps.
Does Brody write to Procore and Autodesk Forma?
Yes. Brody writes punch items, inspection changes, notes and photos to Procore and Autodesk Forma. Teams with no punch tool keep the list in Buildalytic, where each item is logged by photo or text and followed up by trade.
How do the prices compare?
Buildalytic is priced per seat with usage pooled across the company: $25 per office user a month for phones, texting and job chat, or $59 for an Operator who also runs Brody, billed annually ($30 and $69 month to month). Companies that keep their phone system can run Brody from $199 per company a month. Crews, subs, suppliers and clients are free, and there is no setup fee. PlanRadar publishes Basic at $32 for one user, Starter at $107 and Pro at $159 per user a month, with Enterprise quoted and a 4% innovation fee from the second billing period (checked November 28, 2026).
Is Brody a person?
No. Brody is an AI assistant. On every call he says who he works for and that he is an AI, with a recording notice where the law requires one. Your data is never sold or used to train models for other companies.
Close every late defect.
Put Brody on one real project. Keep defects where your team logs them, and get each fix back with photo proof.
