Best subcontractor prequalification software (2026)

Subcontractor prequalification software compared: TradeTapp, COMPASS, Highwire, Billy, Procore, Contracts Connected and Buildalytic. Scoring, follow-up, prices. November 2026.

By Buildalytic editorial team8 min read

A contractor operations coordinator on a phone at an oak desk reviewing a plain subcontractor company folder, laptop at an oblique angle and neutral blue stationery, natural daylight
On this page12 sections

The short answer

The best subcontractor prequalification software depends on whether you need a risk score from a specialist, or current documents from every sub before award. Buildalytic keeps the prequalification questionnaire and the scoring itself, or works beside your prequalification platform, and Brody calls each sub once a year or on your schedule, confirms the right contact and follows up by call, text and email until the current documents are in for your team to review. Autodesk TradeTapp, COMPASS and Highwire score financial and safety risk, Billy and Contracts Connected pair prequalification with insurance and vendor compliance, and Procore has named COMPASS its preferred prequalification solution.

What to take away

  • Decide what you are buying: a risk score, a questionnaire, or the follow-up that gets documents back.
  • Procore Prequalification will sunset on March 31, 2027, and Procore now points customers to COMPASS.
  • A score is only as current as the documents behind it. Ask who chases renewals.
  • Contracts Connected and Buildalytic publish prices. TradeTapp, COMPASS, Highwire and Billy did not on the pages we read.

Three kinds of prequalification software

Buyers split this category three ways. Risk assessment platforms review each sub's finances, safety and capacity and score the result. Autodesk TradeTapp, COMPASS and Highwire sit here.

Compliance platforms put prequalification forms next to certificates of insurance, W-9s, licenses and bonds. Billy and Contracts Connected sit here, and Procore has had its own prequalification forms.

The follow-up layer gets the current documents and contacts back from each sub. This is where Buildalytic fits: it keeps the questionnaire and the scoring itself, or works beside a platform, and Brody calls each sub on your schedule until the packet is current.

Facts below were copied from each vendor's own website, help center or announcement on November 28, 2026. The order groups tools by kind and is not a ranking. Buildalytic makes one of the options.

What to compare

Most prequalification tools can send a form. Prequalification goes stale when nobody chases the renewal, or the form goes to someone who left the company. Compare tools on the points below.

  • Questionnaire: your own form, a shared standard form, or both?
  • Financial review: are financial statements read and turned into ratios, limits or a score?
  • Safety and insurance: EMR, incident history, coverage and endorsements checked against your requirements.
  • Who pays: the general contractor, the sub, or a fee waived for a time?
  • Renewals: who asks for updated documents, and how often?
  • Contacts: does anyone confirm the person receiving the request still works there?
  • Bidding: does qualification status reach your estimators?
  • Pricing: published, per vendor or quoted?

Seven options at a glance

“Not stated” means the vendor's pages we read don't say; ask them.

Seven options at a glance
SoftwareKindReview and scoringDocuments and renewalsBidding and platformsPublished price
Autodesk TradeTappSubcontractor qualification and risk analysisTailored questionnaires, limit calculations and financial ratio checks; AI Financial Data Extraction turns PDF financial statements into structured dataNot stated on the page readRisk data flows to estimating teams with BuildingConnected ProNot stated on the page read
COMPASS by Bespoke MetricsStandardized prequalification networkThe COMPASS Q Score, “the Construction Credit Score,” with recommended prequalification outcomes; scores sort from strongest (1.0) to weakest (7.9)Subs submit the standard 1Form; general contractors track submissions and request more informationProcore's preferred prequalification solution since October 15, 2026; more than 150,000 subcontractorsNot published; fees waived until 2028 for those who sign up by December 31, 2026, Procore says
HighwireContractor prequalification and risk managementAssesses company, finance, safety and insurance, including serious injury and fatality trackingContractors enroll and can benchmark against peers; covers more than 60,000 contractorsServes construction, data centers, health systems, universities and moreNot published; contractor subscriptions based on company headcount
BillyConstruction compliance platformYour own prequalification form built on your risk criteria; submissions reviewed and approvals routedAutomated COI collection and verification, W-9s and business licenses; free for subs with no accountNative Procore side panelCustom, based on vendor count
Procore PrequalificationPrequalification forms inside ProcoreCustomizable form questions; submissions approved or deniedPrequalifications Portal for vendorsApproved vendors invited to bid; Procore says the tool will sunset on March 31, 2027Not published; Procore prices by annual construction volume
Contracts ConnectedBack-office system for general contractorsSubcontractor prequalification for W-9, license, bonds and onboardingCOIs read against your requirements; bond renewals tracked; vendor portal with a free account for each vendorSubcontracts drafted, redlined and e-signed in the same systemFoundation from $416 a month with 500 documents a year; Core and Max quoted; 12-month agreement
BuildalyticPrequalification follow-up by call, text and emailKeeps the questionnaire and the scoring itself, or works beside TradeTapp, Highwire or COMPASS; your team reviews each packet and decidesBrody calls each sub once a year or on your schedule, confirms the right contact and follows up until current documents are in; COIs checked against the subcontractWorks with Procore, Autodesk, Vista, SharePoint and OneDriveOperator seat with Brody $69 a month ($59 billed annually) or Brody Starter $239 per company ($199); subs free

Sources: Autodesk: BuildingConnected and TradeTapp (checked November 28, 2026); Procore: Procore names COMPASS its preferred subcontractor prequalification solution (October 15, 2026; checked November 28, 2026); COMPASS help center: qualification management (checked November 28, 2026); Highwire (checked November 28, 2026); Highwire: pricing (checked November 28, 2026); Billy: vendor prequalification software for general contractors (checked November 28, 2026); Billy (checked November 28, 2026); Procore: prequalification (checked November 28, 2026); Procore: pricing (checked November 28, 2026); Contracts Connected (checked November 28, 2026); Contracts Connected: pricing (checked November 28, 2026); Buildalytic: preconstruction software for general contractors; Buildalytic: pricing and usage (checked November 28, 2026)

When a risk assessment platform is the better choice

If you need a specialist view of each sub's financial health, start here. TradeTapp builds tailored questionnaires, calculates limits, checks financial ratios and turns PDF financial statements into structured data. With BuildingConnected Pro, its risk data reaches your estimators while they bid.

COMPASS uses one standard form, the 1Form, and scores each sub with its Q Score. On October 15, 2026, Procore named COMPASS its preferred subcontractor prequalification solution and launched Prequal for All for general contractors and subs working in Procore. Highwire assesses company, finance, safety and insurance across more than 60,000 contractors and serves owners in data centers, health systems and universities as well as construction.

Sources: Autodesk: BuildingConnected and TradeTapp (checked November 28, 2026); Procore: Procore names COMPASS its preferred subcontractor prequalification solution (October 15, 2026; checked November 28, 2026); COMPASS help center: qualification management (checked November 28, 2026); Highwire (checked November 28, 2026)

When a compliance platform is the better choice

If insurance tracking is the bigger daily job, a compliance platform fits. Billy lets you build your own prequalification form, embeds it on your website, collects and verifies COIs, W-9s and licenses, and shows status in a Procore side panel. Subs pay nothing and need no account.

Contracts Connected covers prequalification for W-9s, licenses, bonds and onboarding, reads COIs against your requirements and keeps subcontracts in the same system. Its Foundation plan starts at $416 a month with 500 documents a year.

Sources: Billy: vendor prequalification software for general contractors (checked November 28, 2026); Billy (checked November 28, 2026); Contracts Connected (checked November 28, 2026); Contracts Connected: pricing (checked November 28, 2026)

If you use Procore Prequalification today

Procore says it will not keep enhancing Procore Prequalification and the tool will sunset on March 31, 2027. Procore also says that if you sign up with COMPASS by December 31, 2026, COMPASS will waive fees until 2028. Subs control which general contractors see their COMPASS profile. Ask both vendors to confirm the terms in writing before you plan the move.

Sources: Procore: Procore names COMPASS its preferred subcontractor prequalification solution (October 15, 2026; checked November 28, 2026); Procore: prequalification (checked November 28, 2026)

When the follow-up layer is the right choice

Forty subs are due for renewal. Twelve haven't opened the email, three contacts left their companies, and two certificates expire before mobilization. The questionnaire is fine. Nobody is chasing the answers.

With Buildalytic, Brody calls each sub once a year, or on the schedule you set. He confirms the right contact, asks for the current documents and follows up by call, text or email until the packet is in. He requests COIs from subs and brokers, checks endorsements against the subcontract and warns before coverage lapses. Brody says he is an AI assistant on every call.

The refreshed packet goes to your team. Your team reviews it, handles exceptions before award and decides who is qualified.

Sources: Buildalytic: preconstruction software for general contractors; Buildalytic: subcontractor prequalification refresh calls; Buildalytic: Brody vs Contracts Connected

How Buildalytic works beside the others

Teams with a prequalification platform keep it. Brody calls the subs who have not finished their renewal in TradeTapp, Highwire or COMPASS, confirms the right contact and follows up on the documents the assessment still needs. Teams without one keep the questionnaire and the scoring in Buildalytic, and Brody runs the rest of the sub follow-up from the same number: bids, COIs and closeout.

Sources: Buildalytic: preconstruction software for general contractors

How to choose

Bring ten real subs to each demo: some current, some expired, one whose contact left. Ask each vendor to show what the sub receives, who follows up when nothing comes back, how a renewal is triggered and where your team makes the decision.

Common questions

What is the best subcontractor prequalification software?

It depends on the risk you care about most. Autodesk TradeTapp, COMPASS and Highwire score financial and safety risk. Billy and Contracts Connected pair prequalification with insurance and vendor compliance. Buildalytic keeps the questionnaire and scoring itself or works beside those platforms, and Brody follows up with each sub until the current documents are in.

Is Procore Prequalification going away?

Procore says it will not continue to enhance Procore Prequalification and the tool will sunset on March 31, 2027. On October 15, 2026, it named COMPASS its preferred subcontractor prequalification solution. Procore says COMPASS will waive fees until 2028 for those who sign up by December 31, 2026.

What is the COMPASS Q Score?

Procore calls it “the Construction Credit Score,” produced by COMPASS with recommended prequalification outcomes. COMPASS's help center sorts scores from strongest (1.0) to weakest (7.9). Subs submit one standard form, the 1Form, and control which general contractors see their profile.

Do subcontractors pay for prequalification?

It depends on the platform. Billy says it is always free for subs. Highwire says contractor subscriptions are based on company headcount. With Buildalytic, subs answer by call, text or email at no cost.

How often should we refresh subcontractor prequalification?

At least once a year, and before award on any project with its own requirements. Brody calls each sub on the schedule you set, confirms the right contact and follows up on the current documents. Your team reviews the refreshed packet and decides.

How much does subcontractor prequalification software cost?

Contracts Connected lists Foundation from $416 a month with 500 documents a year. Billy prices by vendor count. Buildalytic lists an Operator seat with Brody at $69 a month ($59 billed annually) or Brody Starter at $239 per company ($199). TradeTapp, COMPASS, Highwire and Procore did not show prices on the pages we read on November 28, 2026.

Sources and editorial notes

  1. Autodesk: BuildingConnected and TradeTapp (checked November 28, 2026)
  2. Procore: Procore names COMPASS its preferred subcontractor prequalification solution (October 15, 2026; checked November 28, 2026)
  3. COMPASS help center: qualification management (checked November 28, 2026)
  4. Highwire (checked November 28, 2026)
  5. Highwire: pricing (checked November 28, 2026)
  6. Billy: vendor prequalification software for general contractors (checked November 28, 2026)
  7. Billy (checked November 28, 2026)
  8. Procore: prequalification (checked November 28, 2026)
  9. Procore: pricing (checked November 28, 2026)
  10. Contracts Connected (checked November 28, 2026)
  11. Contracts Connected: pricing (checked November 28, 2026)
  12. Buildalytic: preconstruction software for general contractors
  13. Buildalytic: subcontractor prequalification refresh calls
  14. Buildalytic: Brody vs Contracts Connected
  15. Buildalytic: pricing and usage (checked November 28, 2026)

Prepared with AI assistance. Reference date: 2026-11-28. Worked scenarios use typical figures and are not customer results. Product details can change; confirm the current scope and terms before rollout.