The short answer
The easiest way to get incident and near-miss reports from the field is to let crews call or text one company number, then route each report to your safety lead with the facts, photos and next step. OSHA requires an employer to report a work-related fatality within 8 hours, and an in-patient hospitalization, amputation or loss of an eye within 24 hours. Buildalytic is construction safety software: Brody, its AI assistant, takes incident and near-miss reports by call or text, routes them to your safety lead and follows up on each corrective action until it is closed with evidence. Your safety lead decides recordability and makes any report.
What to take away
- Emergencies first: people call 911 and follow your emergency response procedure before anything else.
- OSHA: a fatality within 8 hours, an in-patient hospitalization, amputation or eye loss within 24 hours.
- A voicemail, fax or email to a closed OSHA area office does not count as a report.
- Near misses are the cheapest lessons you will get. Make them as easy to report as a phone call.
- A report is not closed until the corrective action is done and someone has checked the evidence.
Why phone and text get more reports
Most near misses never reach the office. The form is in an app nobody opened, or in a binder in the trailer, and the foreman means to fill it in tonight. A phone call or a text is something every worker already does, in their own language, from wherever they are standing.
OSHA's recordkeeping rule requires employers to set up a reasonable procedure for employees to report work-related injuries and illnesses promptly and accurately, to tell each employee how to report, and not to retaliate against anyone who does. A procedure that would deter a reasonable employee from reporting does not count as reasonable.
Sources: OSHA 29 CFR 1904.35, employee involvement (checked November 28, 2026)
Emergencies come first
A phone report line is not an emergency line. When someone is hurt, people call emergency services and follow your emergency response procedure. The report comes after the scene is safe. A competent person decides whether a hazard is controlled and when work can resume.
What to capture in an incident or near-miss report
Ask for facts, not blame. OSHA's incident investigation guidance encourages employers to investigate near misses as well as injuries, and to focus on root causes rather than fault.
- Who is reporting, their company and a callback number.
- The job, the exact location on site and the time it happened.
- What happened, in the reporter's own words, and whether anyone was hurt.
- Who was there and who saw it.
- Photos of the area, the equipment and any damage, taken once it is safe.
- What was done right away, such as stopping work or barricading the area.
- The likely cause, and who owns the corrective action.
Sources: OSHA: incident investigation (checked November 28, 2026)
OSHA's 8-hour and 24-hour reporting rules
Under 29 CFR 1904.39, an employer must report a work-related fatality to OSHA within 8 hours, and a work-related in-patient hospitalization, amputation or loss of an eye within 24 hours. A fatality is reportable if it happens within 30 days of the incident. A hospitalization, amputation or eye loss is reportable if it happens within 24 hours of the incident. If you learn of a reportable event later, the clock starts when you or your agent learn of it.
You can report by phone or in person to the nearest OSHA area office, by calling 1-800-321-OSHA (1-800-321-6742), or online. If the area office is closed, use the 800 number or the online form; a voicemail, fax or email does not count. OSHA asks for the business name, the names of the employees affected, the location and time, a brief description and a contact person with a phone number.
Emergency room treatment alone, and hospitalization only for observation or diagnostic testing, are not reportable hospitalizations. Motor vehicle accidents on public roads are not reportable unless they happen in a construction work zone. States with their own OSHA-approved plans may set different rules.
Separately, a recordable injury or illness goes on the OSHA 300 log and 301 incident report within 7 calendar days of receiving the information.
This is a summary, not legal advice. Your safety lead decides recordability and makes any report. Confirm the rules for your company with OSHA or your safety professional.
Sources: OSHA: Report a fatality or severe injury (checked November 28, 2026); OSHA 29 CFR 1904.39, reporting fatalities, hospitalizations, amputations and losses of an eye (checked November 28, 2026); OSHA 29 CFR 1904.29, forms (checked November 28, 2026)
From the call to closure
Most incident programs fail at the last three rows. The report is filed, the action is assigned, and nobody asks again.
| Step | Who | Record |
|---|---|---|
| Make the scene safe and call emergency services if anyone is hurt | Crew and foreman | Your emergency response procedure |
| Call or text the report line | Anyone on site | Facts, location, time and photos |
| Route the report to the safety lead, and sensitive details only to the people your rule names | Report line | Time received and who was told |
| Decide whether OSHA must be notified and whether the case is recordable | Safety lead | The decision and any report confirmation |
| Assign the corrective action | Safety lead | Owner and due date |
| Follow up until the fix is done | Owner of the action | Photo or signed record |
| Review the evidence and close the action | Safety lead | Closed date and the job history |
Example: a near miss at the gate
A pallet of block slips off the forks at the east gate. Nobody is hurt. The foreman texts the company number with two photos. The report goes to the safety lead with the location, who was there and the photos. The corrective action, level the laydown area and brief the forklift operators, goes to the site foreman. Brody asks him for a photo of the leveled area and the briefing sign-offs. The safety lead reviews the photo and closes the action, and the daily log carries the safety note.
How Buildalytic takes reports by phone and follows them to closure
Buildalytic is construction safety software that works by text and phone call. A foreman or worker calls or texts the company number. Brody records the facts, the photos and the corrective owner, and routes the report to your safety lead. Sensitive details go only to the people your rule names. Crews use any phone, in their own language, with no app and no login.
Brody follows up on corrective actions with the person assigned until each one is closed with evidence, such as a photo or a signed record, on the schedule your rule sets. Items still open go to the reviewer your rule names.
Brody is an AI assistant. He does not replace an emergency response procedure or a competent person's judgment on site safety. Your safety lead decides recordability and makes any report to OSHA. Brody makes sure they have the facts and photos quickly.
An Operator seat with Brody is $69 a month ($59 billed annually), and Brody Starter is $239 per company ($199 billed annually). Crews are free.
Sources: Buildalytic: construction safety software; Buildalytic: pricing and usage (checked November 28, 2026)
Common questions
How soon must a construction employer report an injury to OSHA?
A work-related fatality within 8 hours. A work-related in-patient hospitalization, amputation or loss of an eye within 24 hours. Recordable cases go on the OSHA 300 log within 7 calendar days. State plans may differ.
Can I report to OSHA by leaving a voicemail?
No. If the area office is closed, OSHA says to call 1-800-321-6742 or use its online form. Voicemail, fax and email do not count.
Does OSHA require near misses to be reported?
OSHA's reporting rule covers fatalities and severe injuries. OSHA encourages employers to investigate near misses too, and to look for root causes rather than blame. Making near misses easy to report is how you find hazards before someone is hurt.
Can workers report an incident by text?
Yes. With Buildalytic, a worker or foreman calls or texts the company number. Brody records the facts, the photos and the corrective owner and routes the report to your safety lead.
Who reports an incident to OSHA?
Your safety lead decides recordability and makes any report to OSHA. Brody gets the facts and photos to them quickly and follows up on the corrective action until it is closed with evidence.
What happens if someone is hurt?
People call emergency services and follow your emergency response procedure first. Brody does not replace an emergency response procedure or a competent person's judgment on site safety.
Sources and editorial notes
- OSHA: Report a fatality or severe injury (checked November 28, 2026)
- OSHA 29 CFR 1904.39, reporting fatalities, hospitalizations, amputations and losses of an eye (checked November 28, 2026)
- OSHA 29 CFR 1904.29, forms (checked November 28, 2026)
- OSHA 29 CFR 1904.35, employee involvement (checked November 28, 2026)
- OSHA: incident investigation (checked November 28, 2026)
- Buildalytic: construction safety software
- Buildalytic: pricing and usage (checked November 28, 2026)
Prepared with AI assistance. Reference date: 2026-11-28. Worked scenarios use typical figures and are not customer results. Product details can change; confirm the current scope and terms before rollout.



