The short answer
The best bid invitation software depends on whether you need a network of subs, a tool to send invitations from your own list, or an answer from every sub before bid day. BuildingConnected, ConstructConnect, PlanHub and Pantera Tools pair invitations with large sub networks. SmartBid, Procore Bid Management and PreconSuite send invitations from your own directory. Followup CRM tracks each bid as a sales pipeline. Buildalytic's Brody pulls the bid list from BuildingConnected or ConstructConnect, sends invitations and addenda by email and text after the estimator approves them, and calls each sub to confirm documents, intent to bid and scopes.
What to take away
- Separate the bid board, which sends and tracks invitations, from the follow-up, which gets an answer from every sub.
- Automatic reminders were confirmed only for PlanHub and SmartBid on the pages we read.
- Network size claims differ even on one vendor's page. Ask how many subs in your trades and region will see the invite.
- PlanHub lets GCs post free, Followup CRM and Buildalytic publish prices, and the rest quote.
Three kinds of bid invitation software
Network bid boards send invitations and bring their own pool of subs. BuildingConnected, ConstructConnect, PlanHub and Pantera Tools sit here.
Directory tools send invitations from the subs you already work with. SmartBid, Procore Bid Management and PreconSuite sit here, and most can add a network on top. Followup CRM is a preconstruction CRM that tracks each bid from first contact to close rather than sending invitations.
The follow-up layer gets an answer from every sub. This is where Buildalytic fits: Brody sends the invitations and addenda your estimator approves and calls each sub until you know who is bidding.
Facts and prices below were copied from each vendor's own website or help center on November 28, 2026. The order groups tools by kind and is not a ranking. Buildalytic makes one of the options.
What to compare
Most bid day surprises come from a sub who never confirmed an addendum or never said they were out. Compare each tool on the points below.
- Invite list: the vendor's network, your own directory, or both.
- Channels: email only, or email and text, and whose address the invite comes from.
- Reminders: automatic emails, a service you hand follow-ups to, or calls from your number.
- Addenda: does the tool confirm every sub received each one?
- Coverage: can you see which trades need more bidders before the due date?
- Integrations: Procore, Autodesk, HCSS or your CRM.
- Price: free to post, quoted, or published per user or per company.
Nine options at a glance
“Not stated” means the vendor's pages we read don't say; ask them.
| Software | Kind | Invite list | Reminders and follow-up | Coverage and integrations | Published price |
|---|---|---|---|---|---|
| BuildingConnected (Autodesk Forma) | Network bid board; BuildingConnected Pro for GCs | A network its page puts at over 1,000,000 construction professionals | Not stated on the page read | Bids compared side by side; Autodesk Docs, Build Cost Management and TradeTapp | Not published; in the Preconstruction bundle, quoted |
| ConstructConnect Bid Management | Network bid board with project leads and takeoff | A network of over 450,000 construction professionals, per its FAQ | Not stated on the page read | Bid goals and the trades that need more bidders; PlanSwift and On-Screen Takeoff | Not published |
| PlanHub | Bidding platform for GCs, subs and suppliers | 400,000+ subcontractors and 30,000+ suppliers in nearly 400 trades | One-click invitations with automatic follow-up reminders | Smart Bid Coverage shows which projects need bidders | GC Essentials plan free; Pro, Premier and Enterprise quoted |
| Pantera Tools | Bid management for GCs | Your private list plus 1.2 million subs in 560+ trades through the Blue Book Network | Not stated on the page read | Invitations branded to come from the GC | Not stated on the page read |
| SmartBid | Bid management for GCs, part of ConstructConnect | Your private sub database by trade, location and minority status | Automatic notifications for milestones and deadlines | Procore, Autodesk BIM 360, Dropbox and ConstructConnect | Not published |
| Procore Bid Management | Bidding inside Procore | Your company directory, plus the Procore Construction Network in the US and Canada | Not stated on the page read | Bid activity and coverage; side-by-side bid comparison | Not published |
| PreconSuite | Bid management for GCs | Your directory, a Subcontractor Directory and a Find Me More Subs add-on | Not stated on the page read; invites sent from your own company email | Procore and HCSS | Not published; 14-day free trial |
| Followup CRM | Sales and preconstruction CRM | Tracks each bid from first contact to close; does not send bid invitations on the pages read | Follow-up reminders and a shared calendar | Foundation, Viewpoint, Sage and Outlook | Starter $99 per user a month billed annually; Professional $149; 5-user minimum; launch fee |
| Buildalytic | Bid solicitation and follow-up by call, text and email | Pulled from BuildingConnected or ConstructConnect, a CSV, or subs by trade from your list | Invitations and addenda by email and text after the estimator approves; Brody calls each sub to confirm documents, intent to bid and scopes | Bidding, needs plans, declined and unreachable by trade, with an alert when a scope is thin | Invites, reminders and follow-ups on an Operator seat with Brody, $69 a month ($59 billed annually), or Brody Starter, $239 per company ($199); bid coverage reports on Brody Pro, $599 per company ($499) |
Sources: Autodesk Forma: BuildingConnected (checked November 28, 2026); Autodesk Forma: pricing (checked November 28, 2026); ConstructConnect: Bid Management (checked November 28, 2026); PlanHub: general contractors (checked November 28, 2026); PlanHub: general contractor pricing (checked November 28, 2026); Pantera Tools: bid management for general contractors (checked November 28, 2026); SmartBid (checked November 28, 2026); ConstructConnect: SmartBid (checked November 28, 2026); Procore: bid management (checked November 28, 2026); PreconSuite (checked November 28, 2026); Followup CRM: features (checked November 28, 2026); Followup CRM: pricing (checked November 28, 2026); Buildalytic: subcontractor bid solicitation and follow-up; Buildalytic: pricing and usage (checked November 28, 2026)
When a network bid board is the better choice
If you need more subs than your own list holds, start with a network. BuildingConnected puts its network at over 1,000,000 construction professionals, compares bids side by side and connects to TradeTapp for sub qualification. ConstructConnect Bid Management lets you set bid goals and see which trades need more bidders.
If cost is the first filter, PlanHub lets general contractors post projects free on its Essentials plan, lists 400,000+ subcontractors and 30,000+ suppliers and sends one-click invitations with automatic follow-up reminders. Pantera Tools adds 1.2 million subs in 560+ trades through the Blue Book Network and brands each invitation as coming from your company.
Sources: Autodesk Forma: BuildingConnected (checked November 28, 2026); ConstructConnect: Bid Management (checked November 28, 2026); PlanHub: general contractors (checked November 28, 2026); PlanHub: general contractor pricing (checked November 28, 2026); Pantera Tools: bid management for general contractors (checked November 28, 2026)
When your own directory should drive invitations
If you invite the same subs job after job, a directory tool fits. SmartBid keeps a private sub database by trade, location and minority status, sends invitations from templates and sets automatic notifications for milestones and deadlines. It connects to Procore, Autodesk BIM 360 and Dropbox.
Procore Bid Management invites bidders from your Procore directory and the Procore Construction Network and shows bid activity and coverage. PreconSuite sends invitations from your own company email, lets vendors open files without registering and syncs with Procore and HCSS.
If you want a pipeline view of every bid you pursue, Followup CRM logs each one from first contact to close, with reminders and integrations to Foundation, Viewpoint and Sage.
Sources: SmartBid (checked November 28, 2026); ConstructConnect: SmartBid (checked November 28, 2026); Procore: bid management (checked November 28, 2026); PreconSuite (checked November 28, 2026); Followup CRM: features (checked November 28, 2026); Followup CRM: pricing (checked November 28, 2026)
When you need an answer from every sub
The invitations went out Monday. By Thursday, half the electrical subs haven't opened them, one concrete sub never saw Addendum 2 and nobody has said they are out.
Buildalytic's Brody starts from a bid list pulled from BuildingConnected or ConstructConnect, a CSV or subs picked by trade from your list. After the estimator approves the invite list, wording and calling windows, Brody sends the invitation and every addendum by email and text, then calls each sub with your company name on caller ID. He opens every call by saying he is an AI assistant calling for your company.
On each call he confirms the sub has the plans and every addendum, asks if they intend to bid and on which scopes, and answers questions from the bid package with the document named. The coverage summary shows who is bidding, who needs plans, who declined and who is unreachable by trade. Your estimator decides price, scope and award. A sub who replies STOP is removed at once.
Sources: Buildalytic: subcontractor bid solicitation and follow-up
How Buildalytic works beside the others
Keep sending invitations from BuildingConnected, SmartBid, Procore or PlanHub. Brody pulls the list, makes the calls and sends the coverage summary. If every sub you invite already answers through your bid board, its own tracking may be enough.
Sources: Buildalytic: subcontractor bid solicitation and follow-up
How to choose
Rerun one recent bid in each tool. Invite the same subs, issue one addendum and count who confirmed it, who declined and who never answered by the due date. The tool that leaves you the fewest unknowns wins.
Common questions
What is the best bid invitation software for general contractors?
For a large network, compare BuildingConnected, ConstructConnect, PlanHub and Pantera Tools. For invitations from your own directory, compare SmartBid, Procore Bid Management and PreconSuite. For an answer from every sub, Buildalytic's Brody sends invitations and addenda by email and text and calls each sub to confirm documents, intent to bid and scopes.
Which bid invitation tools send automatic reminders?
On the pages we read, PlanHub lists automatic follow-up reminders and SmartBid lists automatic notifications for milestones and deadlines. Buildalytic's Brody follows up by call, text and email on the schedule your estimator sets.
Is there free bid invitation software?
PlanHub's Essentials plan lets general contractors post projects and manage bids free. PreconSuite offers a 14-day free trial. Most others quote.
Is Followup CRM a bid invitation tool?
Not on the pages we read. Followup CRM is a sales and preconstruction CRM that tracks each bid from first contact to close, with reminders and a shared calendar. It lists Starter at $99 per user a month billed annually and Professional at $149, with a five-user minimum and a launch fee.
Can Brody use our BuildingConnected bid list?
Yes. Brody pulls the invite list from BuildingConnected or ConstructConnect, or you upload a CSV or pick subs by trade from your list. Each row is matched to an existing sub record.
How much does bid invitation software cost?
PlanHub's GC Essentials plan is free. Followup CRM lists Starter at $99 per user a month billed annually. Buildalytic includes bid invites, reminders and follow-ups on an Operator seat with Brody at $69 a month ($59 billed annually) or Brody Starter at $239 per company ($199). BuildingConnected, ConstructConnect, SmartBid, Procore, PreconSuite and Pantera Tools did not show prices on the pages we read on November 28, 2026.
Sources and editorial notes
- Autodesk Forma: BuildingConnected (checked November 28, 2026)
- Autodesk Forma: pricing (checked November 28, 2026)
- ConstructConnect: Bid Management (checked November 28, 2026)
- PlanHub: general contractors (checked November 28, 2026)
- PlanHub: general contractor pricing (checked November 28, 2026)
- Pantera Tools: bid management for general contractors (checked November 28, 2026)
- SmartBid (checked November 28, 2026)
- ConstructConnect: SmartBid (checked November 28, 2026)
- Procore: bid management (checked November 28, 2026)
- PreconSuite (checked November 28, 2026)
- Followup CRM: features (checked November 28, 2026)
- Followup CRM: pricing (checked November 28, 2026)
- Buildalytic: subcontractor bid solicitation and follow-up
- Buildalytic: pricing and usage (checked November 28, 2026)
Prepared with AI assistance. Reference date: 2026-11-28. Worked scenarios use typical figures and are not customer results. Product details can change; confirm the current scope and terms before rollout.