The short answer
There is no single best software for subcontractors. Most specialty contractors pick by job: Siteline or Knowify for pay apps, Foundation, Miter or Payroll4Construction for payroll and certified payroll, Clearstory for T&M and change orders, Raken or Fieldwire for daily reports, Billy or TrustLayer for COIs, Followup CRM for bids and a phone system such as RingCentral or Quo. Buildalytic covers several of these jobs on one company number: Brody takes daily reports by phone, captures T&M tickets by text, builds pay apps, runs payroll with certified payroll, tracks COIs and follows up on bids, with your team approving what matters.
What to take away
- List the jobs where you lose time or money first. Buy for those, not for a feature list.
- All-in-one suites such as Knowify, Foundation and Procore cover many jobs; specialist tools go deeper on one.
- Your GCs choose some of your software for you: their pay app portal and their Procore projects.
- Most field crews will not open an app. Check how each tool gets information from the field.
- Raken, Fieldwire, Knowify, Clearstory, Followup CRM and Buildalytic publish prices. Many others quote.
Pick by job, not by category
Specialty subcontractors live between their GCs' systems and their own crews. The software question is really seven questions: how you bill, how you pay people, how you get paid for extra work, how the field reports, how insurance is tracked, how you win bids and how calls get answered.
Facts and prices below were copied from each vendor's own website in November 2026. The order follows the jobs and is not a ranking. Buildalytic makes one of the options and is named only where its pages claim the job.
Seven jobs at a glance
“Not stated” means the vendor's pages we read don't say; ask them.
| Job | Leading tools | What to check | Where Buildalytic fits |
|---|---|---|---|
| Billing and pay apps | Siteline, Knowify, GCPay, Foundation | G702 and G703 output, retainage by line and lien waivers across many GCs | Builds G702 and G703 pay apps from the schedule of values and field progress, and tracks each across GCs |
| Payroll and certified payroll | Foundation, Miter, eBacon, Lumber, Payroll4Construction, Points North | Union and prevailing wage rates, job costing and the state file your agency accepts | Runs payroll with the WH-347 and state files from the same run |
| Change orders and T&M | Clearstory, Siteline, Procore, Fieldwire | How a field ticket gets signed and reaches a priced change order | Foreman calls or texts the T&M ticket; Brody asks for missing details and drafts the change order request |
| Field reports | Raken, Fieldwire, Procore Daily Log, busybusy | Whether foremen will actually use it, and where the report lands | Daily reports by phone call or text, written to your template and into a GC's Procore when given access |
| COIs | Billy, TrustLayer, BCS | Endorsement checks, renewal requests and answering GC requests | Collects your lower tiers' certificates and sends your current certificate on file when a GC asks |
| Bids | Followup CRM, HubSpot | Follow-up on every submitted bid and won-job handoff | Follows up on bids you sent to GCs by call and email until a yes, a no or an award |
| Phones | RingCentral, Quo, Nextiva | Shared texting, routing and what happens to an after-hours call | One company number for office and field, with Brody answering and texting back missed calls |
Sources: Siteline: AIA billing software (checked November 2026); Knowify: AIA billing (checked November 2026); GCPay: AIA form for subcontractor payment application (checked November 2026); Foundation Software: construction payroll (checked November 2026); Miter: certified payroll (checked November 2026); Lumber (checked November 28, 2026); Payroll4Construction (checked November 2026); Points North (checked November 28, 2026); Clearstory (checked November 2026); Raken: pricing (checked November 2026); Fieldwire: pricing (checked November 2026); Billy (checked November 2026); TrustLayer (checked November 2026); BCS: pricing (checked November 2026); Followup CRM: pricing (checked November 28, 2026); RingCentral: plans and pricing (checked November 2026); Quo: pricing (checked November 2026); Buildalytic: for subcontractors
Billing and pay applications
Siteline is built for subcontractors billing GCs, with G702, G703 and custom pay app forms, retention by line or period and lien waivers. It quotes custom pricing with unlimited users. Knowify serves trade contractors with G702 and G703 pay apps and retainage by phase, from $99 a month. GCPay is used by GCs who require subs to submit through it, with official AIA forms and conditional waivers exchanged with each pay app. If you run Foundation accounting, progress billing and retainage sit there.
Buildalytic builds G702 and G703 pay apps from the schedule of values and field progress, with approved change orders and stored materials, and tracks each one's status across GCs. Retainage is applied by project and period, waivers are prepared, and Brody follows up by call, text and email until the payment posts to your ERP. Finance is quoted with the platform.
Sources: Siteline: AIA billing software (checked November 2026); Siteline: pricing (checked November 2026); Knowify: AIA billing (checked November 2026); GCPay: AIA form for subcontractor payment application (checked November 2026); Buildalytic: billing for subcontractors
Payroll and certified payroll
Foundation's payroll module handles multi-union, multi-trade and multi-state timecards and print or electronic certified reports inside its accounting. Miter and eBacon are construction payroll platforms with certified payroll; Miter lists portal submission in 11 states. Lumber handles certified payroll, prevailing wages, union reporting and tax filing. Payroll4Construction runs construction payroll as a service. Points North builds certified reports from the payroll you already use, with more than 100 formats. None publishes a payroll price on the pages we read.
Buildalytic runs construction payroll with hours by job and cost code, union and prevailing wage rates and fringe, and pay across states. Your team approves each run, and the WH-347 and state files come from the same run for your signer to certify. Payroll is quoted after a look at your crews, states and projects.
Sources: Foundation Software: construction payroll (checked November 2026); Miter: certified payroll (checked November 2026); Lumber (checked November 28, 2026); Payroll4Construction (checked November 2026); Points North (checked November 28, 2026); Buildalytic: construction payroll software
Change orders and T&M
Clearstory offers digital T&M tags with photos and signatures, a rates library and a shared change order log, with a free basic tier and paid tiers by user and project. Siteline treats T&M as a billing type with rate tables. Procore and Fieldwire track changes inside their platforms when your GC runs them.
With Buildalytic, the foreman calls or texts the T&M ticket: the work, who directed it, labor, materials, equipment and photos. Brody asks for anything missing, sends the ticket to the GC's rep to acknowledge and drafts a change order request with the ticket attached for your PM to price. Unsigned tickets and pending requests get followed up.
Sources: Clearstory (checked November 2026); Clearstory: pricing (checked November 2026); Siteline: AIA billing software (checked November 2026); Buildalytic: extra work documentation
Field reports
Raken is a daily report app with voice-to-text, at $23 or $59 per user a month billed annually with a three-user minimum. Fieldwire is free for up to five users and three projects, with reports from Pro at $39 per user a month billed annually. Procore's Daily Log works inside Procore projects, and busybusy pairs daily reports with time tracking.
Buildalytic takes the daily report by a phone call on the way to the truck. Brody asks your template's questions about manpower, hours, work done, delays and safety, files crew photos to the job and sends the report to each GC in the format it expects, or writes it into the GC's Procore project when the GC gives access. Foremen need no app or login.
Sources: Raken: pricing (checked November 2026); Fieldwire: pricing (checked November 2026); Buildalytic: for subcontractors; Buildalytic: daily reports by phone
COIs
Subs sit on both sides of insurance: GCs ask for your certificate, and you need certificates from your own lower tiers. Billy is built for builders, with an AI review assistant and no-login uploads for subs and brokers. TrustLayer reads each COI against your standards with reminder emails. BCS is free up to 25 vendors, then $0.95 per vendor a month on Self-Service.
Buildalytic collects certificates from your lower tiers and their brokers by call, text and email, checks endorsements against your subcontract and asks for renewals before coverage lapses. When a GC asks for your COI, Brody answers from your records and sends your current certificate on file.
Sources: Billy (checked November 2026); TrustLayer (checked November 2026); BCS: pricing (checked November 2026); Buildalytic: COI tracking; Buildalytic: for subcontractors
Bids
Followup CRM is built for subcontractors and GCs who bid commercial work. It replaces the bid spreadsheet, aims to follow up on every bid and sends won jobs to Sage, Foundation or Viewpoint, from $99 per user a month billed annually with a five-user minimum. HubSpot offers a free general CRM for up to 2 users and 1,000 contacts, with a deal pipeline and lead capture forms.
Buildalytic follows up on the bids your estimator approves. Brody calls or emails the GC estimator, asks whether the bid arrived, whether scope questions remain and when the award is expected, and stops at a yes, a no or an award. Price and scope questions go to your estimator word for word.
Sources: Followup CRM (checked November 28, 2026); Followup CRM: pricing (checked November 28, 2026); HubSpot: CRM pricing (checked November 28, 2026); Buildalytic: quote follow-up
Phones
RingCentral suits companies with several offices and complex routing, from $20 per user a month billed annually. Quo suits a small office that wants a shared number and shared texting, from $15 billed annually. Nextiva starts at $15 billed annually with business texts included.
Buildalytic gives office and field one company number with lines, texting and voicemail. Brody answers when your team cannot, says he is an AI assistant, books the visit, handles GC requests and texts you what happened. An Operator seat with Brody is $69 a month ($59 billed annually), or Brody Starter is $239 per company ($199 billed annually) beside the phones you keep. Crews and subs are free.
Sources: RingCentral: plans and pricing (checked November 2026); Quo: pricing (checked November 2026); Nextiva: pricing (checked November 2026); Buildalytic: construction phone system; Buildalytic: pricing and usage (checked November 28, 2026)
When an all-in-one suite fits better
If you want estimating, job costing, billing and scheduling in one system, look at suites. Knowify is built for trade contractors. Foundation is construction accounting with payroll. Procore is where many GCs already run your projects. Contractor Foreman is a low-cost all-in-one, from $49 a month billed annually for one user.
Buildalytic works beside a suite. Brody makes the calls and texts with foremen, GCs and lower tiers, and writes what he hears into the systems you keep.
Sources: Knowify: AIA billing (checked November 2026); Foundation Software: construction payroll (checked November 2026); Contractor Foreman: pricing (checked November 2026); Buildalytic: for subcontractors
How to choose
Bring last month's problems to each demo: a pay app that came back, a T&M ticket nobody signed, a daily that never got sent and a bid with no answer. Ask each vendor what its software does with each one, who in the field has to touch it and what your GC sees.
Common questions
What is the best software for specialty subcontractors?
Most subs combine tools by job: Siteline or Knowify for billing, Foundation, Miter or Payroll4Construction for payroll, Clearstory for T&M, Raken or Fieldwire for daily reports and Followup CRM for bids. Buildalytic covers daily reports, T&M, pay apps, payroll and certified payroll, COIs, bid follow-up and phones on one company number.
What software do electrical and mechanical subcontractors use?
Common picks are an accounting suite such as Foundation, a billing tool such as Siteline, a field app such as Raken or Fieldwire, and the GC's Procore project. Trades on public work add certified payroll. Brody by Buildalytic works beside these by phone and text.
Is there one app that does everything for a subcontractor?
Suites such as Knowify, Foundation and Contractor Foreman cover many jobs in one system. Buildalytic covers field reports, T&M, billing, payroll, COIs, bids and phones, with the field working by call and text instead of an app.
Does Buildalytic run payroll for subcontractors?
Yes. Buildalytic runs payroll with your team approving each run, and produces the WH-347 and state certified payroll files from the same run. Payroll is quoted separately from Brody's plans.
Can Brody file our daily reports to a GC's Procore?
Yes, when the GC gives you access. Brody asks the questions on your template and sends the report to the GC by email or writes it into their Procore project.
Sources and editorial notes
- Siteline: AIA billing software (checked November 2026)
- Siteline: pricing (checked November 2026)
- Knowify: AIA billing (checked November 2026)
- GCPay: AIA form for subcontractor payment application (checked November 2026)
- Foundation Software: construction payroll (checked November 2026)
- Miter: certified payroll (checked November 2026)
- Lumber (checked November 28, 2026)
- Payroll4Construction (checked November 2026)
- Points North (checked November 28, 2026)
- Clearstory (checked November 2026)
- Clearstory: pricing (checked November 2026)
- Raken: pricing (checked November 2026)
- Fieldwire: pricing (checked November 2026)
- Billy (checked November 2026)
- TrustLayer (checked November 2026)
- BCS: pricing (checked November 2026)
- Followup CRM (checked November 28, 2026)
- Followup CRM: pricing (checked November 28, 2026)
- HubSpot: CRM pricing (checked November 28, 2026)
- RingCentral: plans and pricing (checked November 2026)
- Quo: pricing (checked November 2026)
- Nextiva: pricing (checked November 2026)
- Contractor Foreman: pricing (checked November 2026)
- Buildalytic: for subcontractors
- Buildalytic: billing for subcontractors
- Buildalytic: construction payroll software
- Buildalytic: extra work documentation
- Buildalytic: daily reports by phone
- Buildalytic: COI tracking
- Buildalytic: quote follow-up
- Buildalytic: construction phone system
- Buildalytic: pricing and usage (checked November 28, 2026)
Prepared with AI assistance. Reference date: 2026-11-28. Worked scenarios use typical figures and are not customer results. Product details can change; confirm the current scope and terms before rollout.




