The short answer
Autodesk's own AI in Forma Build works on the documents and data already in Forma, for people signed in: Autodesk Assistant works across Forma products, AutoSpecs finds potentially missing submittal items, Construction IQ flags and prioritizes risks, and Sheets and Specifications split drawing sets and spec books. Brody by Buildalytic works with the people who are not signed in. A super calls the company number and Brody writes the daily report to the right Forma Build project, crews text photos and he files each one with a caption, and he writes delays, inspection changes and commitments made on calls as project notes. He reads Forma projects, members and documents to answer field questions by text, with the sheet or spec section named. Your Forma admin picks the projects, answers follow Forma permissions, and a super or PM can approve a report before it posts.
What to take away
- Forma's own AI works on records already in Forma, for people who log in.
- Much of what belongs in Forma is said on a call or sent by text by people who never open it.
- Brody writes daily reports, photos, project notes and corrected contacts to Forma. Documents are read only.
- Your Forma admin authorizes the connection, picks the projects and decides what waits for approval.
- Autodesk Construction Cloud is now Autodesk Forma, and Autodesk Build is now Forma Build.
The short answer
Use Forma's own AI for work on the documents and data already in Forma: building the submittal log from the specs, splitting drawing sets, tagging photos and spotting risk. Add Brody for the work that starts outside Forma, on a phone call or a text from someone who will never log in.
Both keep a person in charge. Autodesk says its Assistant is designed to support professional judgment, with human oversight. Brody posts a daily report directly or waits for your super or PM to approve it, under the rule you set, and every entry links back to the call or text it came from.
Sources: Autodesk Forma: AI in construction, including Forma Build and Autodesk Takeoff (checked November 28, 2026); Autodesk: Autodesk advances agentic AI in its three industry clouds (September 15, 2026; checked November 28, 2026); Buildalytic: Autodesk Forma integration
What Forma's own AI does
These features come from Autodesk's own AI page, help center and announcements. Most sit in Forma Build, formerly Autodesk Build.
- Autodesk Assistant: works inside Forma products, including Build, Takeoff and Data Management, for people signed in.
- AutoSpecs: finds potentially missing submittal items before construction starts and builds the submittal log from the specs.
- Construction IQ: spots and prioritizes risks before they become costly problems.
- Sheets: “automatically extracts sheet numbers and titles from multi-page PDFs.”
- Specifications: breaks long spec books into sections.
- Autotags on photos: adds construction tags to project photos automatically.
- Automated Drawing Extraction in Forma Data Management: uses OCR to pull key attributes from drawings.
- Quick AI issue creation: creates an issue on iOS and Android from a photo and a short description.
- Autodesk Takeoff: detects and counts matching symbols on a drawing.
Sources: Autodesk Forma: AI in construction, including Forma Build and Autodesk Takeoff (checked November 28, 2026); Autodesk help: create issues in Forma Build (checked November 28, 2026)
What Autodesk says is coming
On September 15, 2026, Autodesk announced a next-generation Autodesk Assistant that connects project information across products and teams, and Assistant Builder, which lets customers connect their own AI agents, tools and partner services to Autodesk project context. Autodesk says the next-generation experience is not yet generally available, and that availability, rollout timing and subscription terms will be announced in 2027. Ask your Autodesk rep for the status in writing.
The work that starts outside Forma
A lot of what belongs in Forma Build is said out loud. The super gives the day's report in the truck at 4 PM. A foreman takes six photos of the firestopping. The inspector moves Thursday's inspection to Friday on a call. A sub's new PM gives his number on a voicemail.
Those people may never open Forma, and Forma's AI works for the people who do. Someone in the office ends up typing it in, or it never gets in at all.
Where Brody fits
Brody connects to Autodesk Forma and Forma Build through your own account. He reads what he needs to answer the field and writes back what he finished.
| Forma record | What Brody reads | What Brody writes | Approval step |
|---|---|---|---|
| Projects | Projects, so he knows which job a caller means | Notes on delays, inspection changes and commitments made on calls | Posts directly, or waits for a person under your rule |
| Members | Project members, member companies, phone numbers and emails | Corrected phone numbers and corrected emails | Posts directly, or waits for a person under your rule |
| Documents | Specifications, drawings and sheets, and other project documents, within each person's access | Read only; documents stay as they are | None needed |
| Daily reports | Nothing needed; Brody creates the record | New daily reports from the super's call, and details added later by text | Posts directly, or waits for the super or PM to approve |
| Photos | Nothing needed; Brody creates the record | Job photos texted to the company number, filed to the project with a caption | Posts directly, or waits with the daily report |
Field answers from Forma documents
A foreman texts a question, such as which firestopping goes around a 4 inch PVC pipe through a rated wall. Brody answers from the Forma documents that foreman can access, names the spec section and the detail sheet and can save the follow-up photo to the project and that day's report. Documents in SharePoint, OneDrive or your Brody knowledge base work the same way.
Brody also runs work on your company number that never touches Forma: daily reports by email to your PM and owner list, crew dispatch, bid coverage, insurance compliance and the AI receptionist.
Sources: Buildalytic: Autodesk Forma integration; Buildalytic: spec, drawing and SDS answers by text
Which tool does which job
Most teams use both. This table shows who covers each job, from Autodesk's pages and Buildalytic's Forma integration page.
| Job | Forma's own AI | Brody | Who decides |
|---|---|---|---|
| Daily reports | Entered in Forma Build by people signed in | Written to the right Forma Build project from the super's call, with details added by text | Your super or PM approves before it posts, if your rule asks |
| Photos | Autotags added to photos already uploaded | Texted by crews, filed to the project with a caption | Your super reviews |
| Issues | Quick AI issue creation from a photo and a short description in the mobile app | Delays, inspection changes and commitments written as project notes | Your PM or super owns each issue |
| Field questions | Autodesk Assistant for people signed in | Answered by text or call from Forma documents, with the sheet or spec section named | The design team answers what the documents leave open |
Sources: Autodesk Forma: AI in construction, including Forma Build and Autodesk Takeoff (checked November 28, 2026); Autodesk help: create issues in Forma Build (checked November 28, 2026); Buildalytic: Autodesk Forma integration
How the connection is set up
Your Forma admin connects Brody and can disconnect him at any time.
- Name your products, such as Forma Build.
- A Forma admin authorizes the connection and picks the projects Brody can read and write.
- Set approval rules: which entries post directly and which wait for the super or PM.
- Start on one project. Supers call in and crews text photos.
- Check the log. Every entry links to the call or text it came from.
How to test it on one project
Pick one active Forma Build project and one week. Have the super call in each day's report and the crews text their photos to the company number. At the end of the week, compare what landed in Forma with what the super would have typed: the report, the photos with captions, the notes on delays and inspections. Count the entries your PM had to fix, and check that each one traces back to its call or text.
What it costs
Autodesk did not show a price for its AI features on the pages we read on November 28, 2026; Forma Data Management starts at $45 a month in the US. Buildalytic lists an Operator seat with Brody at $69 a month ($59 billed annually) or Brody Starter at $239 per company ($199), with crews and subs free. Released standard connectors, Forma included, are part of the price.
Sources: Autodesk: Forma Data Management (checked November 28, 2026); Buildalytic: pricing and usage (checked November 28, 2026)
Common questions
Does Autodesk Forma Build have AI?
Yes. Autodesk Assistant works inside Forma products, AutoSpecs builds the submittal log and flags potentially missing items, Construction IQ flags risks, Sheets and Specifications split drawing sets and spec books, photos get tags automatically, and Quick AI issue creation makes an issue from a photo and a short description.
Which AI assistants file daily reports into Autodesk Forma?
Brody by Buildalytic does. A super calls the company number and Brody writes the daily report to the right Forma Build project. Crews text photos and he files each one with a caption. A super or PM can approve a report before it posts.
Is Autodesk Forma the same as Autodesk Construction Cloud?
Yes. Autodesk renamed Autodesk Construction Cloud to Autodesk Forma on March 24, 2026. Autodesk Build is now Forma Build, and Autodesk Docs is now Forma Data Management. Brody works with your projects under either name.
What does Brody read and write in Forma?
He reads projects, members and documents. He writes daily reports, photos, project notes on delays, inspection changes and commitments, and corrected member phone numbers and emails. Documents are read only.
Does Brody replace Forma's own AI?
No. Forma stays your system of record, and its AI keeps working for the people signed in. Brody gets the updates from calls, texts and email that would otherwise need typing and puts them in the right Forma project.
Who approves what Brody writes to Forma?
You do. Your Forma admin picks the projects, answers follow the permissions your Forma users already have, and a super or PM can approve each entry before it posts, or let it post directly.
Is Brody an AI, and do crews know?
Yes. Brody says he is an AI assistant for your company on every call. Crews call or text from any phone, with no app and no login.
Sources and editorial notes
- Autodesk Forma: AI in construction, including Forma Build and Autodesk Takeoff (checked November 28, 2026)
- Autodesk: Autodesk advances agentic AI in its three industry clouds (September 15, 2026; checked November 28, 2026)
- Autodesk help: create issues in Forma Build (checked November 28, 2026)
- Autodesk: Forma Data Management (checked November 28, 2026)
- Buildalytic: Autodesk Forma integration
- Buildalytic: spec, drawing and SDS answers by text
- Buildalytic: pricing and usage (checked November 28, 2026)
Prepared with AI assistance. Reference date: 2026-11-28. Worked scenarios use typical figures and are not customer results. Product details can change; confirm the current scope and terms before rollout.




