QA/QC checklist and inspection and test plan template.
An inspection and test plan with hold and witness points, acceptance criteria and sign-off, for concrete, steel, roofing or firestopping.
Fill in the rows. Download the ITP.
No sign-up. What you type stays in your browser.
Your plan
Inspection and test points
| # | Item | Reference | Acceptance criteria | Method | Frequency | Point | Performed by | Verified by | Record | Result | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | |||||||||||
| 2 | |||||||||||
| 3 | |||||||||||
| 4 | |||||||||||
| 5 | |||||||||||
| 6 | |||||||||||
| 7 | |||||||||||
| 8 |
The starting rows are a common pattern, not your contract. Replace every reference, criterion and frequency with the one in your specifications, quality plan and inspection schedule. The CSV adds blank Date and Initials columns for sign-off in the field.
How it works. The rules behind the numbers.
Every check, planned up front
An inspection and test plan lists each inspection and test for a scope of work, in order: what is checked, against which spec or drawing, the acceptance criteria, the method, how often, and the record it produces.
Hold, witness, review, surveillance
A hold point stops the work until the named party releases it. A witness point needs notice so the party can attend, but work may go on if they do not. Review points check documents. Surveillance is a spot check while work is under way.
Start from a work type, then make it yours
Pick concrete, structural steel, roofing or firestopping for starting rows, or begin blank. Replace each reference, criterion and frequency with the one in your specifications and quality plan, then download the CSV for sign-off.
Full guide: Before work is covered: organize hold-point evidence and the inspection record
More free tools. No sign-up either.
- Schedules, quality and closeout
3-week lookahead template
A Gantt-style lookahead by activity, crew, constraint and date, with float to the need-by date. Download as CSV.
- Schedules, quality and closeout
Construction transmittal template
A document transmittal with purpose, revision, copies and status for each item, ready as a CSV or an email.
- Payroll and prevailing wage
Prevailing wage calculator
Base, fringe, overtime and plan credits for one worker’s week, checked against the wage determination.
Common questions. Answered plainly.
Something else? Ask the team
What is an inspection and test plan in construction?
An ITP is a list of every inspection and test for a scope of work, with the acceptance criteria, the method, the frequency, who performs it, who verifies it and the record kept. It is agreed before work starts and signed off as the work goes.
What is the difference between a QA/QC checklist and an ITP?
The ITP plans which checks happen, when and who signs. A QA/QC checklist is the record filled in at each check. The template does both: the plan columns, plus result, date and initials columns for the field.
What is a hold point?
A point in the work that cannot be passed until the named inspector or party has inspected and released it, such as rebar before a pour or firestopping before a wall is closed.
Keep the lookahead, inspections and turnover moving.
Buildalytic confirms crews, deliveries and inspections by call and text, chases turnover documents until they are accepted, and files every answer to the job.
