Certified payroll / Field guide

American Samoa certified payroll and prevailing wage reporting.

American Samoa certified payroll: Davis-Bacon applies only through Related Acts, rates come from SAM.gov, and the construction industry minimum wage is $6.70.

Illustrative Buildalytic payroll review workspace showing received, missing and ready submissions.
Illustrative product scene · example records

Compliance at a glance

American Samoa prevailing wage and certified payroll rules.

Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.

American Samoa compliance summary
LawNo territorial prevailing wage law confirmed. FLSA industry minimum wages under the Fair Minimum Wage Act of 2007, as amended (29 CFR Part 697).
AgencyU.S. DOL Wage and Hour Division enforces the FLSA industry minimums and federal Related Acts labor standards.
Covered projectsFederally assisted construction is covered when a Related Act applies, such as the Territorial Highway Program under 23 U.S.C. 165.
How rates are setDOL wage determination AS20260001 on SAM.gov lists $6.30. The FLSA construction industry minimum is $6.70, so the higher rate controls.
Certified payrollWeekly, for each week covered work is done. Form WH-347 is optional; any format with the same data and a signed Statement of Compliance works.
Where to fileThe federal agency if it is a party to the contract; otherwise the applicant, sponsor, owner, or territorial agency named in the contract, which forwards it.
ApprenticesUnder federal rules, apprentice rates apply only to apprentices registered in a program recognized by the DOL Office of Apprenticeship or a State Apprenticeship Agency. No territorial rule confirmed.
Other requirementsPost the DOL American Samoa minimum wage poster. Industry minimum depends on the employer's industry, not the worker's job. Overtime after 40 hours a week.
Record retentionFederal rule: keep payrolls and basic records for at least 3 years after all work on the prime contract is completed.
PenaltiesFederal Related Acts and FLSA remedies, including back wages. No territorial penalty confirmed.
Recent changesConstruction industry minimum rose $0.40 to $6.70 on September 30, 2024. The next $0.40 increase is scheduled for September 30, 2027.
Federal overlayDOL says the Davis-Bacon Act applies only in the 50 states, DC, and the CNMI, so in American Samoa Davis-Bacon rates apply only through Related Acts on assisted projects.

01 / In practice

The Davis-Bacon Act itself does not reach American Samoa

The Davis-Bacon Act at 40 U.S.C. 3142 covers federal construction contracts over $2,000 located in a State or the District of Columbia. The U.S. Department of Labor says the Act applies only in the fifty states, the District of Columbia, and the Northern Mariana Islands, and not in other territories. It also says some Davis-Bacon Related Acts do apply to construction in the territories. So the funding program and the contract clauses decide whether Davis-Bacon rates and certified payroll apply.

02 / In practice

Related Acts and the territorial highway program

Many federal grant and loan programs carry Davis-Bacon labor standards. The Territorial Highway Program in 23 U.S.C. 165 helps American Samoa build and improve arterial and collector highways. Chapter 1 of title 23, which includes the section 113 prevailing wage rule, applies to those funds unless the Secretary of Transportation finds a provision inconsistent with the territories' needs. Each territory's agreement lists the sections that apply. Other assisted projects may carry the clauses too.

Where teams get burned

Most American Samoa payroll problems are found after the money is gone.

Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.

Sample of what Buildalytic flags in one week of subcontractor payroll
SubcontractorPayrollWhat was flaggedResult
Ridgeline ElectricWeek 6Electrician paid $46.10 base; determination is $48.20Short $84.00 for 40 hours
Valley ConcreteWeek 6Fringe credit $9.50/hr from a health plan, not annualizedCredit should be $6.00/hr
Summit DrywallWeek 5Payroll not receivedBrody called and texted the payroll contact twice
Summit DrywallWeek 6Three apprentices for one journeyworker; ratio is 1:1Two paid the journeyworker rate
Northside MechanicalWeek 6Worker classified as laborer, daily report shows pipefittingAsk for split classification hours

Sample exception report with illustrative subcontractors and rates.

03 / In practice

Find the American Samoa wage determination

The Department of Labor publishes an American Samoa wage determination on SAM.gov. General Decision AS20260001 covers building, heavy, highway, and residential construction territory-wide. Its listed rates are $6.30 an hour, based on an older survey. That is below the current construction industry minimum wage, so pay at least $6.70. Use the determination attached to your contract. Classify each worker by the work actually performed, and track hours by classification.

04 / In practice

Industry minimum wages under the FLSA

The federal Fair Labor Standards Act applies in American Samoa, but with industry rates instead of one minimum wage. The rate depends on the employer's industry, not the worker's job. The construction industry rate is $6.70 an hour as of September 30, 2024. It covers construction, renovation, and demolition of buildings, housing, highways, dams, and other structures. Under current law the rates rise $0.40 every three years on September 30, so the next increase is due in 2027. Overtime is due after 40 hours a week.

05 / In practice

Review weekly payroll, then submit it

Covered contractors and subcontractors submit certified payroll every week that covered work is done. If a federal agency is a party to the contract, payroll goes to that agency. If not, it goes to the applicant, sponsor, or owner that keeps the records, such as a territorial agency running a federal grant. Form WH-347 is optional, but each payroll needs a signed Statement of Compliance. Check rates, hours, and fringes internally first. Then submit to the recipient named in the contract. Keep payroll records for at least 3 years after all work on the prime contract is done.

Official sources

Start with the agency’s instructions.

Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.

Sources checked November 17, 2026.

FAQ

Questions people ask

Something else? Ask the team

Does the Davis-Bacon Act apply in American Samoa?

Not directly. The Department of Labor says the Davis-Bacon Act applies only in the fifty states, the District of Columbia, and the Northern Mariana Islands. Some Related Acts do apply in the territories, so federally assisted projects in American Samoa can still require Davis-Bacon rates and weekly certified payroll.

What is the construction minimum wage in American Samoa?

The U.S. Department of Labor lists the construction industry minimum wage at $6.70 an hour, effective September 30, 2024. Rates rise $0.40 every three years on September 30 until they reach the federal minimum wage. The next scheduled increase is September 30, 2027.

Which rate do I pay if the wage determination is lower?

Pay the higher rate. AS20260001 lists $6.30 an hour for its classifications. The construction industry minimum wage under the Fair Labor Standards Act is $6.70. Davis-Bacon rates are minimums, and they do not replace other wage laws that set a higher floor.

Where does certified payroll go in American Samoa?

Send it to the federal agency if that agency is a party to the contract. If not, send it to the American Samoa Government agency, applicant, or owner that keeps the records. That entity passes it to the funding agency. Submit it every week that covered work is done.