Certified payroll / Field guide
Oklahoma certified payroll and prevailing wage reporting.
Oklahoma prevailing wage was struck down in 1995 and its statute repealed in 2015. Federal Davis-Bacon certified payroll still applies over $2,000 in federal work.

Compliance at a glance
Oklahoma prevailing wage and certified payroll rules.
Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.
| Law | None. The Minimum Wages on Public Works law, 40 O.S. 196.1 to 196.14, was invalidated in 1995 and repealed by HB 1375 effective November 1, 2015. |
| Agency | None at the state level. The U.S. Department of Labor Wage and Hour Division enforces Davis-Bacon on federally funded work. |
| Covered projects | No state coverage. Only federally funded or assisted construction over $2,000 needs prevailing wages under Davis-Bacon. |
| How rates are set | No state rates. Davis-Bacon wage determinations are posted on SAM.gov and included in the contract. |
| Certified payroll | Not required by the state. On Davis-Bacon work, submit certified payroll weekly with a signed Statement of Compliance. Form WH-347 is optional. |
| Where to file | On Davis-Bacon work, payrolls go to the federal agency if it is a party to the contract, otherwise to the applicant, sponsor or owner that keeps the records. |
| Contractor registration | None for prevailing wage purposes. |
| Apprentices | No state rule. On Davis-Bacon work, apprentices get a lower rate only if registered in an approved program and within its ratio. |
| Other requirements | No state prevailing wage posting or affidavit. Follow any payroll terms the owner writes into the contract. |
| Record retention | No state rule. Under 29 CFR 5.5, contractors keep payrolls and basic records for at least 3 years after all work on the prime contract is complete. |
| Penalties | No state prevailing wage penalties. Davis-Bacon violations can bring withholding, back wages and debarment. Falsifying a Statement of Compliance can lead to civil or criminal prosecution. |
| Recent changes | None found. |
| Federal overlay | Davis-Bacon applies to federally funded or assisted construction over $2,000. With no state law, it is the only prevailing wage rule on most projects. |
01 / In practice
Oklahoma no longer has a prevailing wage law
Oklahoma once had a Minimum Wages on Public Works law at Title 40, sections 196.1 to 196.14. The U.S. Department of Labor notes it was invalidated by a 1995 court decision. In 2015 the Legislature passed House Bill 1375, which repealed all of those sections effective November 1, 2015. Today, projects paid only with state or local money carry no state prevailing wage rates and no state certified payroll filing.
02 / In practice
Federal Davis-Bacon rules still apply
The federal Davis-Bacon and Related Acts cover contractors and subcontractors on federally funded or assisted construction, alteration, or repair contracts over $2,000 in Oklahoma. Workers must get at least the wage and fringe rates in the federal wage determination. Contracting officers and contractors find those determinations on SAM.gov. The applicable determination is included in the contract. Classify each worker by the work actually performed, and pay at least the listed rate and fringe for every hour in that classification.
Where teams get burned
Most Oklahoma payroll problems are found after the money is gone.
Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.
| Subcontractor | Payroll | What was flagged | Result |
|---|---|---|---|
| Ridgeline Electric | Week 6 | Electrician paid $46.10 base; determination is $48.20 | Short $84.00 for 40 hours |
| Valley Concrete | Week 6 | Fringe credit $9.50/hr from a health plan, not annualized | Credit should be $6.00/hr |
| Summit Drywall | Week 5 | Payroll not received | Brody called and texted the payroll contact twice |
| Summit Drywall | Week 6 | Three apprentices for one journeyworker; ratio is 1:1 | Two paid the journeyworker rate |
| Northside Mechanical | Week 6 | Worker classified as laborer, daily report shows pipefitting | Ask for split classification hours |
Sample exception report with illustrative subcontractors and rates.
03 / In practice
File weekly certified payroll with the contracting agency
On Davis-Bacon work, each contractor submits a weekly payroll for the prior week, within 7 days after the regular pay date. On direct federal contracts, the prime sends all payrolls, including subcontractors', to the contracting agency. On federally assisted projects, payrolls go to the state or local agency the funding agency names. Form WH-347 is optional, but any substitute must carry identical Statement of Compliance wording. Review each payroll internally first, then submit it.
04 / In practice
Check the contract for owner requirements
Without a state law, the public owner and the funding source decide what you report. When federal money is involved, the contract should include Davis-Bacon clauses and a wage determination, even if a state agency, county, or city signs it. Some owners also require payroll reports by contract when no federal money is used. Read the bid documents, confirm the recipient and format at the preconstruction meeting, and keep a record of what you sent.
05 / In practice
Keep records and pay apprentices correctly
Federal rules require each contractor and subcontractor to keep payrolls and basic records for at least 3 years after all work on the prime contract is complete. Keep your own copies at least as long. Apprentices can be paid below the journeyworker rate only if they are individually registered in an approved apprenticeship program, and only at the program's percentage and ratio. Falsifying a Statement of Compliance can lead to civil or criminal prosecution under federal law.
State guides
Certified payroll and prevailing wage rules in every state and territory.
Filing systems, thresholds, rates and deadlines by state, from each state's agency and statutes. Federal Davis-Bacon rules apply on top of state law on federally funded work.
- Federal (Davis-Bacon)
- Alabama
- Alaska
- American Samoa
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Delaware
- District of Columbia
- Florida
- Georgia
- Guam
- Hawaii
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Northern Mariana Islands
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Puerto Rico
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- US Virgin Islands
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming
Compare every state side by side in the prevailing wage laws by state table, or work out a paycheck with the prevailing wage calculator.
Official sources
Start with the agency’s instructions.
Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.
- Oklahoma Legislature · Enrolled House Bill 1375 (2015) ↗
- U.S. Department of Labor · State Prevailing Wage Laws ↗
- U.S. Department of Labor · Form WH-347 Payroll ↗
- SAM.gov · Wage Determinations ↗
- eCFR, 29 CFR 5.5 Contract provisions ↗
Sources checked November 17, 2026.
Does Oklahoma have a prevailing wage law?
No. Oklahoma's Minimum Wages on Public Works law was invalidated by a 1995 court decision, according to the U.S. Department of Labor. House Bill 1375 repealed the statute, 40 O.S. sections 196.1 to 196.14, effective November 1, 2015. Federal Davis-Bacon rules still apply to federally funded work.
When do I need certified payroll in Oklahoma?
You need it on federally funded or assisted construction contracts over $2,000 that include Davis-Bacon labor standards. File a weekly payroll for each week of work within 7 days after the regular pay date. Some owners also require reports by contract, so check your bid documents.
Is Form WH-347 required?
No. The U.S. Department of Labor says use of Form WH-347 is optional. You can use your own payroll report if it contains all the required information and a Statement of Compliance with wording identical to the one on the WH-347.
Where do I find Davis-Bacon wage rates for Oklahoma?
Wage determinations are posted on SAM.gov. The one that applies is the determination included in your contract. Classify each worker by the work performed and pay at least the listed hourly rate plus fringe for that classification.
Start with one project.
Bring your reporting requirements and a sample payroll. We’ll walk through collection, review and the final handoff with your team.
