Maine certified payroll and prevailing wage reporting.

Maine prevailing wage applies to state-funded public works of $50,000 or more. How rates are set, certified payroll each pay period, records and penalties.

Illustrative Buildalytic payroll review workspace showing received, missing and ready submissions.
Illustrative product scene · example records

Compliance at a glance

Maine prevailing wage and certified payroll rules.

Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.

Maine compliance summary
LawMaine prevailing wage law, 26 M.R.S. sections 1304 to 1317.
AgencyMaine Department of Labor, Bureau of Labor Standards (Wage and Hour Division).
Covered projectsPublic works funded in whole or part by state funds specific to the project with a contract of $50,000 or more. Also state-assisted energy projects of 2 megawatts or more bid on or after January 1, 2023.
How rates are setThe bureau uses the highest of a July wage survey, state certified payroll data and Davis-Bacon rates. Yearly county rates for Building, Highway and Earthwork, and Heavy and Bridge are on the MDOL website.
Certified payrollEach payroll period, on the MDOL Certified Payroll Form or equivalent, with a signed Statement of Compliance. Section 1311 also requires a monthly copy of the wage record.
Where to fileTo the general contractor and the letting agency (public authority), or to the state agency giving assistance on an assisted project.
Contractor registrationNone found for state prevailing wage work.
ApprenticesApprentice rates may be paid only to workers in a registered apprenticeship program. No state ratio or utilization requirement found.
Other requirementsPost the rate determination at the site. All craft workers need a 10-hour OSHA construction course. File a monthly signed OSHA training statement and post a signed training affidavit at the site.
Record retentionKeep the wage record at the job site. It need not be kept longer than 3 years after the contract ends.
PenaltiesWillful violations bring a forfeiture of at least $250. Underpaid workers recover the shortfall, an equal penalty and attorney fees. Survey refusals draw $250, $500, then $1,000 fines.
Recent changesPL 2025, c. 476 amended the benefits definition in section 1308. MDOL published 2026 rates. PL 2023, c. 333 added Davis-Bacon data as a third rate source.
Federal overlayDavis-Bacon applies to federally funded or assisted construction over $2,000 in addition to state law. Maine's law does not apply where Davis-Bacon rates set by the U.S. Secretary of Labor govern the project.

01 / In practice

Know when Maine prevailing wage applies

The Bureau of Labor Standards in the Maine Department of Labor (MDOL) runs the law in 26 M.R.S. §§1304 to 1315. It covers public works funded in whole or in part by state funds when the contract is $50,000 or more. That includes schools, buildings, roads, bridges, sewers, and waterworks. MDOL excludes projects where state money is not dedicated to the project, such as revenue sharing. It also excludes maintenance and work done by state or local employees.

02 / In practice

How rates are set and published

Under §1308, the bureau surveys wages and benefits in the second and third weeks of July. It also collects certified payroll data from state public works and the Davis-Bacon rates, then uses the highest of the three data sets. A rate cannot fall more than 15 percent from the prior year. MDOL publishes yearly rates by county for Building, Highway and Earthwork, and Heavy and Bridge work. Since 2022, Building 1 projects use Building 2 rates.

Where teams get burned

Most Maine payroll problems are found after the money is gone.

Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.

Sample of what Buildalytic flags in one week of subcontractor payroll
SubcontractorPayrollWhat was flaggedResult
Ridgeline ElectricWeek 6Electrician paid $46.10 base; determination is $48.20Short $84.00 for 40 hours
Valley ConcreteWeek 6Fringe credit $9.50/hr from a health plan, not annualizedCredit should be $6.00/hr
Summit DrywallWeek 5Payroll not receivedBrody called and texted the payroll contact twice
Summit DrywallWeek 6Three apprentices for one journeyworker; ratio is 1:1Two paid the journeyworker rate
Northside MechanicalWeek 6Worker classified as laborer, daily report shows pipefittingAsk for split classification hours

Sample exception report with illustrative subcontractors and rates.

03 / In practice

Put the determination in the bid and post it

Before advertising, the public authority asks the bureau director for the fair minimum wage and benefits. The director must file the schedule within 30 days of the request. It is attached to the specifications and bid documents. Once the rates are in a contract, they stay the same for the life of that contract. Each contractor and subcontractor must post a legible copy of the rates in a prominent place at the site. Under section 1317, all craft workers must complete a 10-hour OSHA construction course, and contractors file a monthly signed statement of compliance and post a signed affidavit at the site.

04 / In practice

Submit certified payroll each pay period

MDOL says covered contractors and subcontractors must submit certified payroll each payroll period. Send a copy of all payrolls to the general contractor and the letting agency with a signed Statement of Compliance. Completing MDOL's Certified Payroll Form meets this requirement, and the bureau reviews the data. Section 1311 also requires a copy of the wage record to be filed monthly with the public authority. Review each payroll internally before you submit it.

05 / In practice

Keep a full wage record for three years

Section 1311 requires a record of each worker's and independent contractor's name, occupation, hours, job title, rate or pay method, and actual pay. Keep a copy at the job site, open to the bureau and the public authority at reasonable hours. You need not keep it longer than three years after the contract ends. Filed records are public, but the public authority must adopt rules protecting Social Security and taxpayer numbers.

06 / In practice

Apprentices, exemptions and penalties

You may pay an apprentice rate only to a worker enrolled in a registered apprenticeship program. The state law does not apply when federal Davis-Bacon rates set by the U.S. Secretary of Labor govern the project. Since 2023, it also covers some state-assisted renewable energy projects of 2 megawatts or more. A willful and knowing violation brings a forfeiture of at least $250. An underpaid worker can recover the shortfall, an equal penalty, and attorney fees.

Official sources

Start with the agency’s instructions.

Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.

Sources checked November 17, 2026.

FAQ

Questions people ask

Something else? Ask the team

What is the Maine prevailing wage threshold?

Maine prevailing wage applies to public works funded in whole or in part by state funds when the contract is $50,000 or more. MDOL says the state funds must be specific to the project. Maintenance work and work done by state or local employees are excluded.

How often do I submit certified payroll in Maine?

MDOL says to submit certified payroll each payroll period to the general contractor and the letting agency, with a signed Statement of Compliance. MDOL's Certified Payroll Form meets the requirement. Section 1311 also requires a copy of the wage record to be filed monthly with the public authority.

Do Maine rates change during a contract?

No. Under §1306, once the fair minimum wage and benefit rates are included in a contract, they stay unchanged while the contract is in effect. New yearly rates apply to later bids. The public authority gets the schedule from the bureau before it advertises for bids.

Does Maine law apply on Davis-Bacon projects?

No. Section 1314 says the state law does not apply when public works are built in whole or in part with federal funds under Davis-Bacon or a similar federal act, and the U.S. Secretary of Labor sets the rates. Follow the federal wage determination and weekly federal payroll rules instead.

What are the penalties in Maine?

A contractor or subcontractor that willfully and knowingly violates the law faces a forfeiture of at least $250. An underpaid worker can recover the difference, an equal penalty, and reasonable attorney fees. Failing to answer the wage survey can bring fines of $250, $500, and then $1,000.