Certified payroll / Field guide

West Virginia certified payroll and prevailing wage reporting.

West Virginia prevailing wage was repealed in 2016 by House Bill 4005. See when federal Davis-Bacon still applies and how weekly certified payroll works now.

Illustrative Buildalytic payroll review workspace showing received, missing and ready submissions.
Illustrative product scene · example records

Compliance at a glance

West Virginia prevailing wage and certified payroll rules.

Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.

West Virginia compliance summary
LawNo prevailing wage law since House Bill 4005 (2016). The West Virginia Jobs Act, W. Va. Code 21-1C, still governs local hiring on public improvements.
AgencyThe Division of Labor enforces the Jobs Act. WorkForce West Virginia issues local labor waivers.
Covered projectsNo prevailing wage. The Jobs Act covers public improvements let to contract at $500,000 or more, excluding those funded in whole or part by federal funds.
How rates are setNo state rates. Federal wage determinations are posted on SAM.gov.
Certified payrollJobs Act projects must file certified payrolls or comparable records showing employee counts, residence, and occupation. Davis-Bacon work needs weekly certified payroll.
Where to fileJobs Act records go to the Division of Labor, by the public authority or the employer. Davis-Bacon payroll goes to the contracting or funding agency.
Contractor registrationA Contractor Licensing Board license is required for commercial work of $25,000 or more, W. Va. Code 30-42-6.
ApprenticesNone under state law. Federal rules apply on Davis-Bacon work.
Other requirementsHire at least 75 percent of employees from the local labor market or get a waiver. Bidders on public improvements over $100,000 must submit a drug-free workplace affidavit.
PenaltiesJobs Act: $250 per employee below 75 percent per day after notice, rising to $500 after 14 days. Final payment can be withheld.
Recent changesNone enacted. 2026 bills to restore prevailing wage (S.B. 111) or change Jobs Act reporting (H.B. 4350, H.B. 4548) were referred to committee.
Federal overlayDavis-Bacon applies to federally funded or assisted construction over $2,000. It is the only prevailing wage rule for public work in West Virginia.

01 / In practice

West Virginia repealed its prevailing wage law

West Virginia no longer has a state prevailing wage law. The Legislature passed House Bill 4005 in its 2016 regular session. It repealed most of Article 5A of Chapter 21 of the West Virginia Code, titled wages for construction of public improvements. The enrolled bill says it was passed February 4, 2016, and took effect ninety days from passage. State and local public improvement projects no longer carry a state prevailing wage. Under the West Virginia Jobs Act, public improvements of $500,000 or more without federal funds still require certified payrolls or comparable records filed with the Division of Labor.

02 / In practice

Federal Davis-Bacon rules still apply

The Davis-Bacon Act covers federal contracts over $2,000 for the construction, alteration, or repair of public buildings or public works. Related Acts extend the same rules to projects that federal agencies assist with grants, loans, loan guarantees, or insurance. Many West Virginia highway, water, housing, and school projects carry federal money, so these rules often apply. Workers must get at least the locally prevailing wages and fringe benefits listed in the wage determination in the contract.

Where teams get burned

Most West Virginia payroll problems are found after the money is gone.

Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.

Sample of what Buildalytic flags in one week of subcontractor payroll
SubcontractorPayrollWhat was flaggedResult
Ridgeline ElectricWeek 6Electrician paid $46.10 base; determination is $48.20Short $84.00 for 40 hours
Valley ConcreteWeek 6Fringe credit $9.50/hr from a health plan, not annualizedCredit should be $6.00/hr
Summit DrywallWeek 5Payroll not receivedBrody called and texted the payroll contact twice
Summit DrywallWeek 6Three apprentices for one journeyworker; ratio is 1:1Two paid the journeyworker rate
Northside MechanicalWeek 6Worker classified as laborer, daily report shows pipefittingAsk for split classification hours

Sample exception report with illustrative subcontractors and rates.

03 / In practice

Weekly certified payroll on federal jobs

On Davis-Bacon work, each contractor and subcontractor submits a certified payroll every week for the prior week. It goes to the federal agency if that agency is a party to the contract. Otherwise it goes to the applicant, sponsor, or owner, which sends it on to the funding agency. The WH-347 form is optional, but any substitute must include the same signed Statement of Compliance. Check each week internally against the wage determination before you sign and submit it.

04 / In practice

Find federal wage determinations on SAM.gov

The U.S. Department of Labor sets Davis-Bacon rates and publishes wage determinations on SAM.gov. The site is open to the public as well as to contracting officers. Use the determination that is in your contract, and match each worker to a classification based on the work performed. If a needed classification is missing, ask the contracting agency to request one. Prime contracts over $100,000 also require time and a half for hours over 40 in a workweek.

05 / In practice

Check each contract for added terms

Without a state prevailing wage law, the contract controls wage terms on state and local work. The Jobs Act still requires 75 percent local hiring and payroll reporting on projects of $500,000 or more. Some owners still ask for payroll records in their specifications, and federal funding agencies always require Davis-Bacon terms. Read the bid documents for a wage determination before you price labor. If one is attached, set up weekly certified payroll from day one and confirm who receives it.

Official sources

Start with the agency’s instructions.

Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.

Sources checked November 17, 2026.

FAQ

Questions people ask

Something else? Ask the team

Does West Virginia have prevailing wage?

No state law requires it. House Bill 4005, passed in 2016, repealed the state prevailing wage article for public improvements. It took effect ninety days after passage. Federal Davis-Bacon rules still apply to many projects that use federal funds.

Is certified payroll required on West Virginia public projects?

When federal rules, the contract, or the West Virginia Jobs Act require it. Davis-Bacon covered projects need weekly certified payroll for each week worked. The West Virginia Jobs Act still requires certified payrolls or comparable records to be filed with the Division of Labor on public improvements of $500,000 or more without federal funds. Check the bid documents for a federal wage determination.

Who receives Davis-Bacon certified payroll?

The federal agency, if it is a party to the contract. If not, the payroll goes to the applicant, sponsor, or owner that holds the records. That entity sends it to the federal agency that gave the funding. Subcontractors usually submit through the prime contractor.

Do I have to use the WH-347 form?

No. The U.S. Department of Labor says the WH-347 is optional. Any format works if it has the required payroll data and the same signed Statement of Compliance wording. Federal wage determinations for West Virginia counties are posted on SAM.gov.

Start with one project.

Bring your reporting requirements and a sample payroll. We’ll walk through collection, review and the final handoff with your team.