Certified payroll / Field guide
Florida certified payroll and prevailing wage reporting.
Florida repealed its state prevailing wage law in 1979. Davis-Bacon still covers federally funded work, and local wage rules ended for new contracts on September 30, 2026.

Compliance at a glance
Florida prevailing wage and certified payroll rules.
Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.
| Law | None. Florida repealed its state prevailing wage law in 1979. Section 218.077, Florida Statutes, limits local wage rules. |
| Agency | No state prevailing wage agency. The U.S. Department of Labor Wage and Hour Division enforces Davis-Bacon on federal work. |
| Covered projects | No state coverage. Davis-Bacon covers federally funded or assisted construction over $2,000. |
| How rates are set | No state rates. On Davis-Bacon work, the U.S. Department of Labor sets rates in wage determinations published on SAM.gov, and the contracting agency puts the right one in the contract. |
| Certified payroll | Not required by state law. On Davis-Bacon work, payroll is due weekly with a signed Statement of Compliance. Form WH-347 is optional. |
| Where to file | On Davis-Bacon work, to the federal agency if it is a party to the contract, otherwise to the applicant, sponsor, or owner, which forwards them. |
| Contractor registration | No state public works or prevailing wage registration found. |
| Apprentices | No state rules. On Davis-Bacon work, apprentices may be paid less only if individually registered in a registered program, within the program ratio. |
| Other requirements | On Davis-Bacon work, post the wage determination and the WH-1321 poster at the site where workers can easily see them. |
| Record retention | No state rule. On Davis-Bacon work, payroll records must be kept at least 3 years after all work on the prime contract is completed. |
| Penalties | No state penalties. On Davis-Bacon work, violations can bring withholding of payments, contract termination, and debarment for three years. |
| Recent changes | Chapter 2024-80 amended section 218.077. Since September 30, 2026, counties and cities may not use contracting to control contractor wages or benefits. Earlier contracts are not impaired. |
| Federal overlay | Davis-Bacon applies to federally funded or assisted construction over $2,000 in addition to state law. |
01 / In practice
Florida has no state prevailing wage law
The U.S. Department of Labor lists Florida among the states without a prevailing wage law. It notes the law was repealed in 1979. No state agency sets wage rates for state or local public works, and there is no state certified payroll form or filing system. On a project paid only with state or local money, wage and payroll reporting terms come from the owner's contract. Read the bid documents to see what the owner asks for.
02 / In practice
Davis-Bacon still applies to federally funded work
Federal rules apply when a Florida project uses federal money. The Davis-Bacon Act covers federal contracts over $2,000 for construction, alteration, or repair of public buildings or public works. Related acts extend the same labor standards to many projects built with federal grants, loans, or other assistance. That includes work run by Florida agencies, counties, and cities. When coverage applies, the contract will include the Davis-Bacon clauses and a wage determination.
Where teams get burned
Most Florida payroll problems are found after the money is gone.
Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.
| Subcontractor | Payroll | What was flagged | Result |
|---|---|---|---|
| Ridgeline Electric | Week 6 | Electrician paid $46.10 base; determination is $48.20 | Short $84.00 for 40 hours |
| Valley Concrete | Week 6 | Fringe credit $9.50/hr from a health plan, not annualized | Credit should be $6.00/hr |
| Summit Drywall | Week 5 | Payroll not received | Brody called and texted the payroll contact twice |
| Summit Drywall | Week 6 | Three apprentices for one journeyworker; ratio is 1:1 | Two paid the journeyworker rate |
| Northside Mechanical | Week 6 | Worker classified as laborer, daily report shows pipefitting | Ask for split classification hours |
Sample exception report with illustrative subcontractors and rates.
03 / In practice
Find the wage determination on SAM.gov
The Department of Labor publishes Davis-Bacon wage determinations on SAM.gov. The contracting agency picks the one that fits the project's county and construction type and puts it in the contract. Classify each worker by the work performed. Post the wage determination and the WH-1321 poster where workers can easily see them. Apprentices can be paid apprentice rates only when they are individually registered in a registered apprenticeship program.
04 / In practice
Submit weekly certified payroll on covered projects
Each contractor and subcontractor submits payroll information every week. Payrolls go to the federal agency when it is a party to the contract. Otherwise they go to the applicant, sponsor, or owner, such as a city or county, which sends them on. Form WH-347 is optional, but each payroll needs a signed Statement of Compliance. Review each week internally against the wage determination first. Then submit it as the contract directs.
05 / In practice
Local wage rules end for new contracts in 2026
Chapter 2024-80, Laws of Florida, amended section 218.077. Effective September 30, 2026, a county, city, or other political subdivision may not use its purchasing or contracting procedures to control or affect the wages or benefits of its contractors. It also may not give bid preferences based on wages or benefits. The change removed an exception for contractor employees. It does not impair contracts entered into before September 30, 2026, and it gives way where needed to receive federal funds.
State guides
Certified payroll and prevailing wage rules in every state and territory.
Filing systems, thresholds, rates and deadlines by state, from each state's agency and statutes. Federal Davis-Bacon rules apply on top of state law on federally funded work.
- Federal (Davis-Bacon)
- Alabama
- Alaska
- American Samoa
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Delaware
- District of Columbia
- Florida
- Georgia
- Guam
- Hawaii
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Northern Mariana Islands
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Puerto Rico
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- US Virgin Islands
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming
Compare every state side by side in the prevailing wage laws by state table, or work out a paycheck with the prevailing wage calculator.
Official sources
Start with the agency’s instructions.
Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.
- U.S. Department of Labor · Dollar Threshold Amount for Contract Coverage Under State Prevailing Wage Laws ↗
- U.S. Department of Labor · Fact Sheet #66: Davis-Bacon and Related Acts ↗
- The Florida Senate · Florida Statutes § 218.077 ↗
- Florida Department of State · Laws of Florida, Chapter 2024-80 ↗
Sources checked November 17, 2026.
Does Florida have a prevailing wage law?
No. The U.S. Department of Labor lists Florida as a state without a prevailing wage law and says it was repealed in 1979. Prevailing wages still apply on federally funded or assisted construction covered by the Davis-Bacon Act and related acts.
When does prevailing wage apply in Florida?
It applies when a project is covered by the Davis-Bacon Act or a related act. That means federal contracts over $2,000 for public buildings or public works, and many projects built with federal grants or loans. The contract will include a wage determination from SAM.gov when coverage applies.
Can a Florida county or city require prevailing wages?
Not on contracts entered into on or after September 30, 2026. Section 218.077, as amended in 2024, bars political subdivisions from using purchasing or contracting to control contractor wages or benefits. Contracts entered into before that date are not impaired. The limit applies only as far as it does not block federal funds or conflict with federal requirements.
How often do I submit certified payroll on a federal project in Florida?
Weekly. Each contractor and subcontractor submits payroll information every week to the contracting agency, or to the local owner when the federal agency is not a party. Form WH-347 is optional. A signed Statement of Compliance must go with every payroll.
Start with one project.
Bring your reporting requirements and a sample payroll. We’ll walk through collection, review and the final handoff with your team.