Certified payroll / Field guide

Virginia certified payroll and prevailing wage reporting.

Virginia prevailing wage under Va. Code § 2.2-4321.3: state-funded public works over $250,000, DOLI wage determinations, pay scale certification, and penalties.

Illustrative Buildalytic payroll review workspace showing received, missing and ready submissions.
Illustrative product scene · example records

Compliance at a glance

Virginia prevailing wage and certified payroll rules.

Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.

Virginia compliance summary
LawVa. Code 2.2-4321.3, added in 2020 and amended in 2021 and 2026.
AgencyVirginia Department of Labor and Industry (DOLI), Prevailing Wage, which can investigate and refer cases to the Attorney General.
Covered projectsState-funded public works over $250,000. Local work only where a locality adopts an ordinance. Covered colleges join for contracts of $5 million or more initiated after July 1, 2027.
How rates are setDOLI wage determinations based on federal Davis-Bacon general determinations, never below Davis-Bacon. Request the official determination through the contracting agency.
Certified payrollNo routine weekly filing. After award, certify each craft's pay scale to DOLI under oath on the Pay Scale Certification form.
Where to fileDOLI Prevailing Wage, by email at prevailingwage@doli.virginia.gov or mail to 6606 West Broad Street, Richmond.
Contractor registrationSubcontractors must be registered in the statewide electronic procurement system (eVA).
ApprenticesRegistered apprentices are paid under their program agreement. If it is silent on fringes, the full journeyman fringe applies.
Other requirementsPost the rates at the site and certify posting to DOLI within 10 days. Give subcontractors the rates and changes.
Record retentionSix years. Produce certified records to DOLI within 10 days of a request.
PenaltiesBack wages plus 8 percent interest and a bar from bidding until restitution. Willful violations are a Class 1 misdemeanor.
Recent changes2026 Acts chapters 1014, 1040 and 1060 tie rates to the 29 CFR 1.2 definition as of January 20, 2026 and exclude private broadband sites. DOLI began rulemaking (16VAC15-80) in June 2026.
Federal overlayDavis-Bacon applies to federally funded or assisted construction over $2,000 in addition to state law.

01 / In practice

Know when Virginia prevailing wage applies

Virginia's prevailing wage law is Va. Code § 2.2-4321.3, added in 2020 and amended in 2021 and 2026. The Department of Labor and Industry (DOLI) runs the program. It applies to public works contracts paid for in whole or in part with state funds. It does not apply to public works contracts of $250,000 or less. Public works include building and transportation work on public facilities. Certain DHCD and Virginia Housing Development Authority contracts for low and moderate income housing are exempt. Since the 2026 amendments, work at non-governmental broadband or telecommunications facilities is also excluded.

02 / In practice

Localities must opt in

For locally funded work, the law applies only if the locality has adopted an ordinance requiring prevailing wage. State agencies are covered automatically when state money is involved. Starting with contracts initiated after July 1, 2027, the law also reaches public colleges under management agreements. That covers construction or services contracts of $5 million or more paid with state general funds or general fund debt. Ask the contracting agency whether its project is covered before you bid.

Where teams get burned

Most Virginia payroll problems are found after the money is gone.

Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.

Sample of what Buildalytic flags in one week of subcontractor payroll
SubcontractorPayrollWhat was flaggedResult
Ridgeline ElectricWeek 6Electrician paid $46.10 base; determination is $48.20Short $84.00 for 40 hours
Valley ConcreteWeek 6Fringe credit $9.50/hr from a health plan, not annualizedCredit should be $6.00/hr
Summit DrywallWeek 5Payroll not receivedBrody called and texted the payroll contact twice
Summit DrywallWeek 6Three apprentices for one journeyworker; ratio is 1:1Two paid the journeyworker rate
Northside MechanicalWeek 6Worker classified as laborer, daily report shows pipefittingAsk for split classification hours

Sample exception report with illustrative subcontractors and rates.

03 / In practice

How rates are set and found

The statute defines the rate as the one the Commissioner of Labor and Industry determines for the locality, based on surveys every three years. It can never be lower than the federal Davis-Bacon rate. DOLI says its wage determinations are based on Davis-Bacon determinations and list wage and fringe rates by classification. Only an official DOLI determination sent to the contracting agency counts, so request it through that agency. The rate in effect at bid and award applies for the whole contract.

04 / In practice

Certify your pay scale and post the rates

After award, the contractor must certify to DOLI, under oath, the pay scale for each craft or trade it and its subcontractors will use. The certification shows total hourly pay, each wage and benefit item, and any third-party benefit funds. DOLI has a Pay Scale Certification form for this. Post the rates where workers can see them, then certify posting compliance to DOLI within 10 days. Give subcontractors the rates and any changes.

05 / In practice

Keep payroll records for six years

Every employer on a covered contract must keep records of wages paid, hours worked, and job classifications by day and week. Keep them at least six years. Produce them to DOLI within 10 days of a request, certified as showing actual hours and pay. DOLI lists time cards, daily work records, payroll journals, canceled checks, and fringe benefit payment proof. The statute does not require routine weekly payroll filings, so review records internally and submit whatever the contract adds.

06 / In practice

Penalties for underpayment

An employer that underpays is liable to the worker for all unpaid wages and benefits, plus 8 percent annual interest from the date due. It is barred from bidding on public contracts with any public body until it makes full restitution. A willful violation is a Class 1 misdemeanor. The Commissioner can investigate, hold administrative proceedings, and refer cases to the Attorney General. Employers also may not use subcontractors that are not registered in the Commonwealth's statewide electronic procurement system.

Official sources

Start with the agency’s instructions.

Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.

Sources checked November 17, 2026.

FAQ

Questions people ask

Something else? Ask the team

When did Virginia's prevailing wage law start?

The General Assembly added Va. Code § 2.2-4321.3 in 2020 and amended it in 2021 and again in 2026. It now covers state-funded public works contracts over $250,000. Locally funded projects are covered only where the locality has adopted its own prevailing wage ordinance.

Does Virginia require weekly certified payroll?

Not under state law. The statute requires a sworn pay scale certification after award, posting compliance, and six years of payroll records produced to DOLI within 10 days of a request. Some contracts add payroll reporting, and federally funded jobs need weekly Davis-Bacon certified payroll.

Where do I get Virginia prevailing wage rates?

Request the official wage determination through the contracting agency. DOLI sends it to that agency, and only that official determination is valid. DOLI does not issue project-specific determinations. It uses the general determination and adds classifications when needed through a Request for Additional Wage Classification.

How are apprentices paid in Virginia?

DOLI says workers in registered apprenticeship or training programs are paid under their program agreement, not the full prevailing rate. Fringe benefits must still be paid. If the agreement says nothing about fringes, the full journeyman fringe amount from the wage determination applies.

What happens if I underpay workers?

You owe the unpaid wages and benefits plus 8 percent annual interest. You cannot bid on public contracts with any public body until you pay in full. Willful violations are a Class 1 misdemeanor. Workers can also file a claim with DOLI or sue for what they are owed.