Certified payroll / Field guide
North Dakota certified payroll and prevailing wage reporting.
North Dakota has no state prevailing wage law. Federal Davis-Bacon rules still apply, and NDDOT federal-aid projects need weekly certified payroll in LCPtracker.

Compliance at a glance
North Dakota prevailing wage and certified payroll rules.
Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.
| Law | None. North Dakota has no state prevailing wage law. |
| Agency | None at the state level. The U.S. Department of Labor enforces Davis-Bacon. The NDDOT Civil Rights Division monitors payroll on NDDOT federal-aid projects. |
| Covered projects | No state coverage. Only federally funded or assisted construction over $2,000 needs prevailing wages under Davis-Bacon. |
| How rates are set | No state rates. Davis-Bacon wage determinations are posted on SAM.gov and included in the contract. |
| Certified payroll | Not required by the state. On Davis-Bacon work, submit certified payroll weekly with a signed Statement of Compliance. Form WH-347 is optional. NDDOT federal-aid projects require weekly electronic filing. |
| Where to file | NDDOT federal-aid projects, including city and county projects, file in LCPtracker. Paper is not accepted, and payroll counts as submitted only after the prime's Prime Approver approves it. |
| Contractor registration | No public works registration. A state contractor license under NDCC chapter 43-07 is needed for jobs over $4,000. |
| Apprentices | No state rule. On Davis-Bacon work, apprentices get a lower rate only if registered in an approved program and within its ratio. |
| Other requirements | No state prevailing wage posting or affidavit. On NDDOT jobs, subcontractors must be on the approved or qualified contractor list before entry in LCPtracker. |
| Record retention | No state rule. Under 29 CFR 5.5, contractors keep payrolls and basic records for at least 3 years after all work on the prime contract is complete. |
| Penalties | No state prevailing wage penalties. Davis-Bacon violations can bring withholding, back wages and debarment. Falsifying a Statement of Compliance can lead to civil or criminal prosecution. |
| Recent changes | None found. |
| Federal overlay | Davis-Bacon applies to federally funded or assisted construction over $2,000. With no state law, it is the only prevailing wage rule on most projects. |
01 / In practice
North Dakota has no state prevailing wage law
North Dakota does not have a state prevailing wage law for public works. The U.S. Department of Labor lists it among the states without one. That means state, county, city, and school projects paid only with state or local money carry no state wage rate schedule and no state certified payroll filing. Contractors still follow state wage payment and overtime rules. Owners can also add wage or payroll terms in their own contracts, so read the bid documents.
02 / In practice
Federal Davis-Bacon rules still apply
The federal Davis-Bacon and Related Acts cover contractors and subcontractors on federally funded or assisted construction, alteration, or repair contracts over $2,000 in North Dakota. Workers must get at least the wage and fringe rates in the federal wage determination. Contracting officers and contractors find those determinations on SAM.gov. The applicable determination is included in the contract. Classify each worker by the work actually performed, and pay at least the listed rate and fringe for every hour in that classification.
Where teams get burned
Most North Dakota payroll problems are found after the money is gone.
Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.
| Subcontractor | Payroll | What was flagged | Result |
|---|---|---|---|
| Ridgeline Electric | Week 6 | Electrician paid $46.10 base; determination is $48.20 | Short $84.00 for 40 hours |
| Valley Concrete | Week 6 | Fringe credit $9.50/hr from a health plan, not annualized | Credit should be $6.00/hr |
| Summit Drywall | Week 5 | Payroll not received | Brody called and texted the payroll contact twice |
| Summit Drywall | Week 6 | Three apprentices for one journeyworker; ratio is 1:1 | Two paid the journeyworker rate |
| Northside Mechanical | Week 6 | Worker classified as laborer, daily report shows pipefitting | Ask for split classification hours |
Sample exception report with illustrative subcontractors and rates.
03 / In practice
File weekly certified payroll with the contracting agency
On Davis-Bacon work, each contractor submits a weekly payroll for the prior week, within 7 days after the regular pay date. On direct federal contracts, the prime sends all payrolls, including subcontractors', to the contracting agency. On federally assisted projects, payrolls go to the state or local agency the funding agency names. Form WH-347 is optional, but any substitute must carry identical Statement of Compliance wording. Review each payroll internally first, then submit it.
04 / In practice
NDDOT federal-aid projects use LCPtracker
The North Dakota Department of Transportation requires all contractors on its federal-aid projects, including city and county projects, to file weekly certified payrolls in LCPtracker. NDDOT no longer accepts paper payrolls. After award, the prime contractor names a Prime Approver who reviews and approves payroll for subcontractors of every tier. Payroll is not treated as submitted to NDDOT until the Prime Approver approves it. The prime also assigns subcontractors in the system and makes sure corrections get filed.
05 / In practice
Keep records and watch apprentice rules
Federal rules require each contractor and subcontractor to keep payrolls and basic records for at least 3 years after all work on the prime contract is complete. Apprentices can be paid less than the journeyworker rate only if they are individually registered in an approved apprenticeship program. Pay them the program's percentage of the journeyworker rate and stay within the approved ratio. Everyone else gets the full rate for the work they perform.
State guides
Certified payroll and prevailing wage rules in every state and territory.
Filing systems, thresholds, rates and deadlines by state, from each state's agency and statutes. Federal Davis-Bacon rules apply on top of state law on federally funded work.
- Federal (Davis-Bacon)
- Alabama
- Alaska
- American Samoa
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Delaware
- District of Columbia
- Florida
- Georgia
- Guam
- Hawaii
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Northern Mariana Islands
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Puerto Rico
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- US Virgin Islands
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming
Compare every state side by side in the prevailing wage laws by state table, or work out a paycheck with the prevailing wage calculator.
Official sources
Start with the agency’s instructions.
Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.
- U.S. Department of Labor · State Prevailing Wage Laws ↗
- U.S. Department of Labor · DBRA Compliance Principles ↗
- NDDOT · Special Provision, Mandatory Use of Automated Certified Payroll ↗
- SAM.gov · Wage Determinations ↗
- North Dakota Legislature, NDCC chapter 43-07 ↗
- eCFR, 29 CFR 5.5 Contract provisions ↗
Sources checked November 17, 2026.
Does North Dakota have a prevailing wage law?
No. North Dakota has no state prevailing wage law, and the U.S. Department of Labor lists it among the states without one. State and local projects funded only with state or local money do not require state prevailing wage rates. Federal Davis-Bacon rules apply when federal money is involved.
When do I need certified payroll in North Dakota?
You need it on federally funded or assisted construction contracts over $2,000 that carry Davis-Bacon labor standards. Submit a weekly payroll for each week of work, within 7 days after the regular pay date. Some owners also require payroll reports by contract, so check the bid documents.
How do I submit certified payroll on an NDDOT project?
On NDDOT federal-aid projects, including city and county projects, file weekly certified payrolls online in LCPtracker. Paper payrolls are not accepted. Your prime contractor's Prime Approver must approve each payroll before NDDOT can see it. You can get an account through the NDDOT Civil Rights Division.
Where do I find wage rates for a North Dakota federal project?
Federal wage determinations are posted on SAM.gov. The determination that applies is the one included in your contract. Classify each worker by the work actually performed and pay at least the listed wage and fringe for that classification.
Start with one project.
Bring your reporting requirements and a sample payroll. We’ll walk through collection, review and the final handoff with your team.
