Certified payroll / Field guide
Connecticut certified payroll and prevailing wage reporting.
Connecticut certified payroll under CGS 31-53: $1 million and $100,000 thresholds, monthly WWS-CPI filing to the agency, July 1 rate updates, and felony penalties.

Compliance at a glance
Connecticut prevailing wage and certified payroll rules.
Reviewed November 17, 2026. Each item comes from the agency or statute listed under official sources.
| Law | Connecticut General Statutes section 31-53 and related sections 31-53a to 31-53d and 31-54. |
| Agency | Connecticut Department of Labor, Wage and Workplace Standards Division. |
| Covered projects | State and political subdivision public works of $1 million or more for new construction and $100,000 or more for remodeling, alteration, or repair. Some offsite fabrication and DECD funded projects are covered. |
| How rates are set | The Labor Commissioner adopts collective bargaining rates for each trade by town, or Davis-Bacon rates where none apply. Rates adjust every July 1 for the life of the contract. |
| Certified payroll | Monthly, as a complete copy of weekly records with a signed statement of compliance, using Form WWS-CPI or an equivalent. |
| Where to file | The contracting agency, or DECD or the project developer where those sections apply, by mail, email, or another accepted method. |
| Apprentices | Apprentices must be registered with the Connecticut Department of Labor. Ratios: Not confirmed. |
| Other requirements | Send proof of a 10 hour OSHA construction course with the first payroll for each worker. Certify the pay scale under oath after award. Post rates at the site. |
| Penalties | Knowingly filing a false certified payroll or failing to file is a class D felony, up to $5,000, 5 years in prison, or both. Civil penalties are $5,000 per violation. Debarment up to 3 years. |
| Recent changes | Public Acts 25-168 and 25-174, effective July 1, 2025, cover certain offsite fabrication, apply the July 1 rate adjustment to all projects, and change DECD project coverage. |
| Federal overlay | Davis-Bacon applies to federally funded or assisted construction over $2,000 in addition to state law. |
01 / In practice
Know when Connecticut prevailing wage applies
The Connecticut Department of Labor, Wage and Workplace Standards Division, enforces the prevailing wage law in General Statutes section 31-53. It covers public works projects of the state, its agents, and political subdivisions. New construction is covered when the combined cost of all work is $1 million or more. Remodeling, rehabilitation, alteration, or repair is covered at $100,000 or more. Since July 1, 2025, Public Acts 25-168 and 25-174 also cover certain off-site fabrication and changed coverage for DECD-funded projects.
02 / In practice
How rates are set and found
The Labor Commissioner adopts the wage and fringe rates in collective bargaining agreements for the same trade in the town where the project is built. Where no agreement applies, the Commissioner uses Davis-Bacon determinations. The awarding agency must contact the Department 10 to 20 days before advertising to get the rates for the bid. Rates are adjusted each July 1. Since July 1, 2025, every prevailing wage project is subject to that annual adjustment. After award, the contractor certifies its pay scale under oath.
Where teams get burned
Most Connecticut payroll problems are found after the money is gone.
Underpaid fringe, a missing week from one sub or an apprentice over the ratio usually surfaces in an audit or a withheld payment, months later, when the sub has been paid and the crew has moved on. Buildalytic checks every sub's payroll the week it arrives.
| Subcontractor | Payroll | What was flagged | Result |
|---|---|---|---|
| Ridgeline Electric | Week 6 | Electrician paid $46.10 base; determination is $48.20 | Short $84.00 for 40 hours |
| Valley Concrete | Week 6 | Fringe credit $9.50/hr from a health plan, not annualized | Credit should be $6.00/hr |
| Summit Drywall | Week 5 | Payroll not received | Brody called and texted the payroll contact twice |
| Summit Drywall | Week 6 | Three apprentices for one journeyworker; ratio is 1:1 | Two paid the journeyworker rate |
| Northside Mechanical | Week 6 | Worker classified as laborer, daily report shows pipefitting | Ask for split classification hours |
Sample exception report with illustrative subcontractors and rates.
03 / In practice
Submit certified payroll monthly to the agency
Keep weekly records of each worker's hours, wages, and classification. Then submit a certified payroll monthly to the contracting agency by mail, email, or another method it accepts. Use Form WWS-CPI, which can now be completed online, with the Certified Statement of Compliance. The statement confirms rates and fringes, workers' compensation coverage with carrier and policy details, and no kickbacks. Review it internally before you submit. Certified payrolls are public records that anyone may inspect and copy.
04 / In practice
Send OSHA 10 proof with the first payroll
Under section 31-53b, contractors must furnish proof with the weekly certified payroll for each worker's first week on the project. It must show the worker completed at least a 10-hour OSHA construction safety and health course. Federal mine training and telecommunications training are accepted where they apply. Plumbers and electricians whose course is five or more years old need a four-hour refresher. A worker without proof can be removed from the site if it is not provided within 15 days.
05 / In practice
Penalties for underpayment and false filings
Knowingly filing a false certified payroll is a class D felony, punishable by a fine of up to $5,000, up to five years in prison, or both. Failing to file a certified payroll carries the same penalty. The Commissioner can issue a citation and a $5,000 fine for each offense of knowingly or willfully underpaying wages or fringes. The agency can also withhold payment or terminate the contract. Contractors placed on the debarment list cannot get public works contracts for up to three years.
State guides
Certified payroll and prevailing wage rules in every state and territory.
Filing systems, thresholds, rates and deadlines by state, from each state's agency and statutes. Federal Davis-Bacon rules apply on top of state law on federally funded work.
- Federal (Davis-Bacon)
- Alabama
- Alaska
- American Samoa
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Delaware
- District of Columbia
- Florida
- Georgia
- Guam
- Hawaii
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Northern Mariana Islands
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Puerto Rico
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- US Virgin Islands
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming
Compare every state side by side in the prevailing wage laws by state table, or work out a paycheck with the prevailing wage calculator.
Official sources
Start with the agency’s instructions.
Reporting requirements depend on the contract and applicable program. Check the current instructions with the team responsible for your project.
- Connecticut DOL · Prevailing Wage Information ↗
- Connecticut DOL · Certified Payroll Form WWS-CPI ↗
- Connecticut General Assembly · General Statutes Chapter 557 (Sec. 31-53) ↗
Sources checked November 17, 2026.
How often do I submit certified payroll in Connecticut?
Section 31-53 requires certified payroll to be submitted monthly to the contracting agency. The payroll is a complete copy of your weekly records with a signed statement of compliance. Send it by mail, email, or another method the agency accepts. Federal Davis-Bacon projects require weekly payroll, so follow the contract.
What are the Connecticut prevailing wage thresholds?
The law applies to new construction when the combined total cost or bond authorization for all work is $1 million or more. Remodeling, refinishing, refurbishing, rehabilitation, alteration, or repair is covered when the combined total cost is $100,000 or more. Costs of all contractors and subcontractors are added together.
Do Connecticut prevailing wage rates change during a project?
Yes. Contractors must contact the Labor Commissioner by July 1 each year for the life of the contract and adjust wages and fringes effective each July 1. The Department says that since July 1, 2025, all prevailing wage projects are subject to this annual adjustment.
What happens if I file a false certified payroll in Connecticut?
Knowingly filing a false certified payroll is a class D felony. The penalty is a fine of up to $5,000, up to five years in prison, or both. Failing to file is also a class D felony. A general contractor that knowingly relies on a subcontractor's false certification is not exempt.